Schedule_B_1282AT18R0008,0001_Fill-In.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
ARP Roads Maintenance IDIQ
Solicitation number
1282AT18R0008
Issued by

About this file

Amendment 0001, Schedule of Items (Fill-In)

View the file

Other files

File Type Posted
J.2_Schedule_B_1282AT18R00080001,_0002_Fill-In.xlsx XLSX spreadsheet
J.37_MAP_FS-126-02-ARP-001-ARNF_(South).pdf PDF
J.36_MAP_FS-126-02-ARP-001-ARNF_(North).pdf PDF
Sects_B-M,_1282AT18R0008,_0003.pdf PDF
QandA,_1282AT18R0008,_01302018FE.pdf PDF
1._1282AT18R0008,_0003_(SF_30).pdf PDF
J.3_Description_of_Pay_Items_(0002).pdf PDF
1282AT18R0008,_0002_(SF_30).pdf PDF
Pre-Bid_Minutes_1282AT18R0008_01122018.pdf PDF
J.1_2108_IDIQ_FSSS,_0001.pdf PDF
1282AT18R0008,_0001_(SF_30).pdf PDF
J.35._Tech_Proposal_Scenarios.docx DOCX document
J.3_Description_of_Pay_Items,_0001.pdf PDF
0a._DR_SectsB-M1282AT18R0008,_0001_01122018.pdf PDF
4_Sediment_Basin.pdf PDF
J.3._Description_of_Pay_Items.docx DOCX document
J.33._fs_6300-11_SubcontractorApproval.doc DOC document
18_EZ_Latch.pdf PDF
11_Brushing_Limits.pdf PDF
J.29._WD_CO-23v4,_Highway,_06092017.pdf PDF
3_Cons_Signs_Details.pdf PDF
13_Surfacing.pdf PDF
J.26._WD_CO-13v8,_Heavy,_09222017.pdf PDF
J.34_SOL._TITLE_PAGE_EXAMPLE.docx DOCX document
5_Burry_Pit.pdf PDF
1_Clearing_Limits.pdf PDF
8_Linear_Grading.pdf PDF
17_Lock_Open-2.pdf PDF
19_Rock_Crossing.pdf PDF
9_T_Turn_Around.pdf PDF
J.2._Schedule_B_1282AT18R0008_Fill-In.xlsx XLSX spreadsheet
7_Rolling_Dip.pdf PDF
14_Wire_Fence.pdf PDF
0._Sol_1282AT18R0008,_12182017.pdf PDF
J.4._Fire_Plan.pdf PDF
J.27._WD_CO-16v2,_Highway,_06092017.pdf PDF
J.5._Biobased_Statement_Letter.docx DOCX document
J.25._WD_CO-12v11,_Heavy,_11102017.pdf PDF
10_Intersection.pdf PDF
J.30._WD_CO-24v1,_Highway,_06092017.pdf PDF
J.31_FS_6300-27,_Experience_Questionnaire.docx DOCX document
6_Water_Belt.pdf PDF
J.28._WD_CO-17v1,_Highway,_06092017.pdf PDF
15_Wire_Gate.pdf PDF
16_Lock_Open-1.pdf PDF
12_Recondition_Roadbed.pdf PDF
2_Cons_Signs_Notes.pdf PDF
J.1._2018_RDSMXS_IDIQ_FSSS.pdf PDF
J.32._Designation_of_Representative.doc DOC document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR NAME

CONTRACTOR NAME HERE
SECTION B – SCHEDULE OF ITEMS (1282AT18R0008)
ARP ROADS MAINTENANCE IDIQ 2017

ITEM DESCRIPTION METHOD OF MEASUREMENT UNIT OF MEASURE

BASE

(Award - 09/30/2018)

OPTION 1

(10/01/2018-09/30/2019)

OPTION 2

(10/01/2019-09/30/2020)

OPTION 3

(10/01/2020-09/30/2021)

OPTION 4

(10/01/2021-09/30/2022)

151 (01)General Mobilization. To be negotiated per task order. See Description of Pay Items.A.Q.EachN/A for Original BiddingN/A for Original BiddingN/A for Original BiddingN/A for Original BiddingN/A for Original Bidding
151 (12)Bonding, Task Order $30,000 to $150,000. No individual Task Order will exceed $150,000%EachN/A for Original BiddingN/A for Original BiddingN/A for Original BiddingN/A for Original BiddingN/A for Original Bidding
152Establish clearing limitsC.Q.Mile
157 (01)Sediment basinC.Q.Each
157 (02)Soil Erosion ControlA.Q.LF
202 (01)Removal and Disposal of Trees less than 24" DiameterA.Q.Each
202 (02)Removal and Disposal of Trees greater than 24" DiameterA.Q.Each
203 (01)Removal of Existing CulvertsA.Q.Each
203 (02)Removal of Structures and
Obstructions (Bury Pit) 35' X 20' and 7' DepthC.Q.Each
204 (01)Roadway excavation, compaction method "C", finishing method "A".C.Q.CY
204 (02)Load, Haul, and Place Material, compaction method "C", finishing method "A".C.Q.CY
204(1)CDrainage excavation, type rolling dipconstructC.Q.Each
204(2)RDrainage excavation, type rolling dipreconstructC.Q.Each
211 (01)Roadway Obliteration, Method 1 LightC.Q.Mile
211 (02)Roadway Obliteration, Method 2 MediumC.Q.Mile
211 (03)Roadway Obliteration, Method 3 HeavyC.Q.Mile
212(1)CLinear grading, constructionC.Q.Mile
212(2)RLinear grading - Reconstruction of roadC.Q.Mile
230Roadside brushingC.Q.Mile
251Placed riprapC.Q.CY
303Road reconditioningC.Q.Mile
322(a)Aggregate surface course, grading U, compaction method A, commercial source. Haul Vehicle 10 yard Dump Truck.C.Q.CY
602 (01)Installation of 18-inch diameter corrugated metal pipe, compaction method "A"A.Q.LF
602 (02)Installation of 24-inch diameter corrugated metal pipe, compaction method "A"A.Q.LF
602 (03)Installation of 36-inch diameter corrugated metal pipe, compaction method "A"A.Q.LF
602 (04)Installation of 15 " X 21" corrugated metal pipe arch, compaction method "A"A.Q.LF
602 (05)Installation of 20"X28" corrugated metal pipe arch, compaction method "A".A.Q.LF
602 (06)End section for an 18" pipe culvert.A.Q.Each
602 (07)End section for a 24" pipe culvert.A.Q.Each
602 (08)End section for a 36" pipe culvert.A.Q.Each
602 (9)End section for a 15"X21" corrugated metal pipe arch.A.Q.Each
602 (10)End section for a 20"X28" corrugated metal pipe arch.A.Q.Each
607 (01)Cleaning culverts in place 24" or under.A.Q.Each
607 (02)Cleaning culverts in place 24"-36"A.Q.Each
607 (03)Cleaning culverts in place 36" and larger.A.Q.Each
619 (01)Fence, type barbed wireC.Q.Foot
619 (02)Gate, type barbed wire, size 16-20 feet wideA.Q.Each
619 (03)Transport and install Government Furnished 12' Heavy Duty gate.A.Q.Each
619 (04)Fences, Gates, and Cattleguards, Replace Lock Open PostA.Q.Each
619 (05)Fences, Gates, and Cattleguards, Furnish and Install Type 2 OMA.Q.Each
622 (01)Motor Grader, Cat 140, JD770D, or Equiv; with operatorA.Q.Day
622 (02)Bachhoe/Loader, Cat 416E, JD310G, or equiv, 4WD with exentable stick; with operator.A.Q.Day
622 (03)Crawler Dozer, Cat D-4, Case 550, or equiv. w/tilt blade; with operator.A.Q.Day
622 (04)Crawler Dozer, Cat D-6, Case 850, or equiv. w/tilt blade; with operator.A.Q.Day
622 (05)Track mounted excavator, Cat 315, Case 9030, or equiv. w/ thumb attachment; with operator.A.Q.Day
622 (06)Compact Track Loader, John Deere 300 Series or equiv. with operatorA.Q.Day
622 (07)Mini Excavator, CAT 303 w/ thumb attachment or equiv. with operator.A.Q.Day
622 (08)Wheel loader, John Deere 544, CAT 950 or equiv. with operatorA.Q.Day
622 (09)Dump Truck, 10CY end dump with operator.A.Q.Day
622 (10)Dump Truck, 23CY side dump with operator.A.Q.Day
625Seeding, dry methodC.Q.Acre
650Furnish and install road closure device, type 2, size 16 feetC.Q.Each
TOTAL BASE YEARTOTAL OPT YR ONETOTAL OPT YR TWOTOTAL OPT YR THREETOTAL OPT YR FOUR
$0.00$ - 0$ - 0$ - 0$ - 0$ - 0

File details come from the government source that posted it.