J.31_FS_6300-27,_Experience_Questionnaire.docx

DOCX document 40 KB Posted

Attached to
ARP Roads Maintenance IDIQ
Solicitation number
1282AT18R0008
Issued by

About this file

Form FS 6300-27, Experience Questionnaire

View the file

Other files

File Type Posted
J.2_Schedule_B_1282AT18R00080001,_0002_Fill-In.xlsx XLSX spreadsheet
J.37_MAP_FS-126-02-ARP-001-ARNF_(South).pdf PDF
J.36_MAP_FS-126-02-ARP-001-ARNF_(North).pdf PDF
Sects_B-M,_1282AT18R0008,_0003.pdf PDF
QandA,_1282AT18R0008,_01302018FE.pdf PDF
1._1282AT18R0008,_0003_(SF_30).pdf PDF
J.3_Description_of_Pay_Items_(0002).pdf PDF
1282AT18R0008,_0002_(SF_30).pdf PDF
Pre-Bid_Minutes_1282AT18R0008_01122018.pdf PDF
J.1_2108_IDIQ_FSSS,_0001.pdf PDF
1282AT18R0008,_0001_(SF_30).pdf PDF
J.35._Tech_Proposal_Scenarios.docx DOCX document
J.3_Description_of_Pay_Items,_0001.pdf PDF
Schedule_B_1282AT18R0008,0001_Fill-In.xlsx XLSX spreadsheet
0a._DR_SectsB-M1282AT18R0008,_0001_01122018.pdf PDF
4_Sediment_Basin.pdf PDF
J.3._Description_of_Pay_Items.docx DOCX document
J.33._fs_6300-11_SubcontractorApproval.doc DOC document
18_EZ_Latch.pdf PDF
11_Brushing_Limits.pdf PDF
J.29._WD_CO-23v4,_Highway,_06092017.pdf PDF
3_Cons_Signs_Details.pdf PDF
13_Surfacing.pdf PDF
J.26._WD_CO-13v8,_Heavy,_09222017.pdf PDF
J.34_SOL._TITLE_PAGE_EXAMPLE.docx DOCX document
5_Burry_Pit.pdf PDF
1_Clearing_Limits.pdf PDF
8_Linear_Grading.pdf PDF
17_Lock_Open-2.pdf PDF
19_Rock_Crossing.pdf PDF
9_T_Turn_Around.pdf PDF
J.2._Schedule_B_1282AT18R0008_Fill-In.xlsx XLSX spreadsheet
7_Rolling_Dip.pdf PDF
14_Wire_Fence.pdf PDF
0._Sol_1282AT18R0008,_12182017.pdf PDF
J.4._Fire_Plan.pdf PDF
J.27._WD_CO-16v2,_Highway,_06092017.pdf PDF
J.5._Biobased_Statement_Letter.docx DOCX document
J.25._WD_CO-12v11,_Heavy,_11102017.pdf PDF
10_Intersection.pdf PDF
J.30._WD_CO-24v1,_Highway,_06092017.pdf PDF
6_Water_Belt.pdf PDF
J.28._WD_CO-17v1,_Highway,_06092017.pdf PDF
15_Wire_Gate.pdf PDF
16_Lock_Open-1.pdf PDF
12_Recondition_Roadbed.pdf PDF
2_Cons_Signs_Notes.pdf PDF
J.1._2018_RDSMXS_IDIQ_FSSS.pdf PDF
J.32._Designation_of_Representative.doc DOC document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture

Forest Service

Rocky Mountain Acquisition Management

2150 Centre Ave., Bldg. E Fort Collins, CO 80526

United States Department of Agriculture

Forest Service

Rocky Mountain Acquisition Management

2150 Centre Ave., Bldg. E Fort Collins, CO 80526

USDA – Forest Service

EXPERIENCE QUESTIONNAIRE

(Ref. FSH 6309.31 and 41 USC 1)

INSTRUCTIONS: See Box 11, Remarks, if extra space is needed to answer any questions below. Mark “X” in appropriate boxes.

1. CONTRACTOR NAME, ADDRESS, AND TELEPHONE NO.

2. SUBMITTED TO (office Name and Address)
3. BUSINESS

Company Co-partnership Corporation Individual Non-profit Organization

4. How many years do you or your firm have in the line of work contemplated by this solicitation?

5. How many years of experience in contracting have you or your business had as a (a) prime contractor ____ and/or (b) sub-contractor ____?

6. List below the projects your business has completed within the last three years:

CONTRACT

AMOUNT

TYPE OF PROJECT

DATE

COMPLETED

NAME, ADDRESS, AND TELEPHONE NO. OF OWNER/PERSON TO CONTACT FOR PROJECT INFORMATION

7. List below all of your firm’s contractual commitments running concurrently with the work contemplated by this solicitation:

CONTRACT

NUMBER

DOLLAR AMT.

OF AWARD

NAME, ADDRESS, AND TELEPHONE NO. OF BUSINESS/GOVERNMENT AGENCY INVOLVED
AWARDED

(Units)

PERCENT

COMPLETED

DATE CONTRACT

COMPLETED

8a. Have you ever failed to complete any work awarded to you? Yes No 8b. Has work ever been completed by performance bond? Yes No 8c. If “Yes” to either item 8a or 8b specify location(s) and reason(s) why: Yes No 8d. Did you look at the project site(s) on-the-ground? Yes No

9. Organization and work that will be available for this project.

a. (1) Minimum number of employees: _____ and a(2) Maximum number of employees: ______ ?

b. Are employees regularly on your payroll: Yes No

c. Specify equipment available for this contract: __________________________________________________________________________

d. Estimate rate of progress below (such as 2.0 acres/man/day):

(1) Minimum progress rate: ________________________________ and (2) maximum progress rate: ________________________________

10. List below the experience of the principal individuals of your business:

INDIVIDUAL’S NAME

PRESENT

POSITION

YEARS

OF EXP.

MAGNITUDE AND TYPE OF WORK

11. List all the equipment (including vehicles) you plan to use on this contract. Provide a detailed description of the Equipment including your maintenance plan.

12. Contractor Inspection. Describe Contractor Self Inspection Procedures which you will use to insure quality for this contract.

13. Remarks. Specify Box Numbers (Attach sheets if extra space is needed to fully answer any above question):

CERTIFICATION

I certify that all of the statements made by me are complete and correct to the best of my knowledge and that any person’s name as references are authorized to furnish the Forest Service with any information needed to verify my capability to perform this project.

12a. CERTIFYING OFFICIAL’S NAME AND TITLE

b. SIGNATURE (Sign in ink)
13. DATE

Previous edition is obsolete Page 1 of 2 FS-6300-27 (3/00)

Previous edition is obsolete Page 1 of 2 FS-6300-27 (3/00) image1.jpeg

File details come from the government source that posted it.