J.35._Tech_Proposal_Scenarios.docx

DOCX document 15 KB Posted

Attached to
ARP Roads Maintenance IDIQ
Solicitation number
1282AT18R0008
Issued by

About this file

J.35 Technical Proposal Scenarios

View the file

Other files

File Type Posted
J.2_Schedule_B_1282AT18R00080001,_0002_Fill-In.xlsx XLSX spreadsheet
J.37_MAP_FS-126-02-ARP-001-ARNF_(South).pdf PDF
J.36_MAP_FS-126-02-ARP-001-ARNF_(North).pdf PDF
Sects_B-M,_1282AT18R0008,_0003.pdf PDF
QandA,_1282AT18R0008,_01302018FE.pdf PDF
1._1282AT18R0008,_0003_(SF_30).pdf PDF
J.3_Description_of_Pay_Items_(0002).pdf PDF
1282AT18R0008,_0002_(SF_30).pdf PDF
Pre-Bid_Minutes_1282AT18R0008_01122018.pdf PDF
J.1_2108_IDIQ_FSSS,_0001.pdf PDF
1282AT18R0008,_0001_(SF_30).pdf PDF
J.3_Description_of_Pay_Items,_0001.pdf PDF
Schedule_B_1282AT18R0008,0001_Fill-In.xlsx XLSX spreadsheet
0a._DR_SectsB-M1282AT18R0008,_0001_01122018.pdf PDF
4_Sediment_Basin.pdf PDF
J.3._Description_of_Pay_Items.docx DOCX document
J.33._fs_6300-11_SubcontractorApproval.doc DOC document
18_EZ_Latch.pdf PDF
11_Brushing_Limits.pdf PDF
J.29._WD_CO-23v4,_Highway,_06092017.pdf PDF
3_Cons_Signs_Details.pdf PDF
13_Surfacing.pdf PDF
J.26._WD_CO-13v8,_Heavy,_09222017.pdf PDF
J.34_SOL._TITLE_PAGE_EXAMPLE.docx DOCX document
5_Burry_Pit.pdf PDF
1_Clearing_Limits.pdf PDF
8_Linear_Grading.pdf PDF
17_Lock_Open-2.pdf PDF
19_Rock_Crossing.pdf PDF
9_T_Turn_Around.pdf PDF
J.2._Schedule_B_1282AT18R0008_Fill-In.xlsx XLSX spreadsheet
7_Rolling_Dip.pdf PDF
14_Wire_Fence.pdf PDF
0._Sol_1282AT18R0008,_12182017.pdf PDF
J.4._Fire_Plan.pdf PDF
J.27._WD_CO-16v2,_Highway,_06092017.pdf PDF
J.5._Biobased_Statement_Letter.docx DOCX document
J.25._WD_CO-12v11,_Heavy,_11102017.pdf PDF
10_Intersection.pdf PDF
J.30._WD_CO-24v1,_Highway,_06092017.pdf PDF
J.31_FS_6300-27,_Experience_Questionnaire.docx DOCX document
6_Water_Belt.pdf PDF
J.28._WD_CO-17v1,_Highway,_06092017.pdf PDF
15_Wire_Gate.pdf PDF
16_Lock_Open-1.pdf PDF
12_Recondition_Roadbed.pdf PDF
2_Cons_Signs_Notes.pdf PDF
J.1._2018_RDSMXS_IDIQ_FSSS.pdf PDF
J.32._Designation_of_Representative.doc DOC document
Show all 49

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scenario Based Questions for 1282AT18R0008 Technical Proposal Scenario 1 Scope of Work This task order is for Roadside Brushing and Vegetation Removal Contract. The task order involves the removal of vegetation along Forest Service Maintenance Level 3 Roads in Larimer County, CO in the northwest corner of Canyon Lakes Ranger District. The contract will involve the removal and chipping of vegetation growing within 4 feet of the edge of the roadway and 14 feet above the road surface (see included “Brushing Limits” drawing). The density of roadside brush is highly variable. A pre-bid site visit will be required to determine actual condition.

Location: The project is located on the Canyon Lakes Ranger District in the area known as the Old Roach. The area can be accessed from the Larimer County Road 103 (Laramie River Road) and National Forest System Road 200.

Period of Performance: 365 calendar days after the Notice to Proceed effective date. The contractor shall provide a draft schedule of work in response to this solicitation to be approved by the CO at the pre-work meeting.

Estimated Start Date: As soon as possible but no later than 10 days after the Notice to Proceed.

Scenario 2 Scope of Work This task order is for surface rock replacement (SRR) work on the Sulphur Ranger District. Work items include hauling, placing, and blading commercially sourced surface rock. Specific rock surfacing locations will be marked on the ground due to variance in the current surface rock conditions, and/or directed by the engineer or COR in accordance with this statement of work Location: NFSR 123 (Stillwater Pass) and NFSR 112, 112.1A (Cabin Creek). Maps indicating location of work is included in the task order documents. The main district office for the Sulphur Ranger District is located at, 9 Tenmile Dr., Granby, CO 80446.

Period of Performance: 365 calendar days after the Notice to Proceed effective date. The contractor shall provide a draft schedule of work in response to this solicitation to be approved by the CO at the pre-work meeting.

Estimated Start Date: As soon as possible but no later than 10 days after the Notice to Proceed.

File details come from the government source that posted it.