Amendment 0006.pdf

PDF 95 KB Posted

Attached to
Fire Alarm Upgrade Federal contract opportunity
Solicitation number
12805B20R0009
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

About this file

This amendment extends the response date for solicitation number 12805B20R0009, which requests proposals for a fire alarm upgrade at an Agricultural Research Service facility. The amendment changes the bid due date from July 24, 2020 to July 31, 2020 to allow time for proposal preparation based on recently issued answers to industry questions. Site visits are available by appointment only from June 22 through June 26 due to COVID-19 restrictions, with a maximum of two people allowed per contractor or subcontractor team. Registration for site visits was due by June 15, and registration requests received after that date will not be accepted. Screening questions will be asked upon arrival related to COVID-19 symptoms or exposure.

View the file

Other files for this federal contract opportunity

Other files attached to Fire Alarm Upgrade, newest first.
File Type Posted
Attachment 2 Rev 2 Scope of Work.pdf PDF
Amendment 0005 Questions and Answers.xlsx XLSX spreadsheet
Amendment 0005.pdf PDF
Amendment 0003 Industry QA.docx DOCX document
Amendment 0004.pdf PDF
Amendment 0003.pdf PDF
Attachment 2 Rev 1 Scope of Work.pdf PDF
Solicitation 12805B20R0009-0003.pdf PDF
Attachment 10 Rev 1 Informational Volume 1 - Specifications.pdf PDF
Amendment 0002.pdf PDF
Solicitation 12805B20R0009-0002.pdf PDF
Amendment 0001.pdf PDF
Solicitation 12805B20R0009-0001.pdf PDF
Attachment 4 Contractor Certification Regarding EMR.pdf PDF
Attachment 6 ARS-372 Contractor Request For Payment Transmittal.pdf PDF
Attachment 12 Simplex 2120 Pointlist.xlsx XLSX spreadsheet
Attachment 5 ARS-371 Construction Progress and Payment Schedule.pdf PDF
Attachment 9 Informational Final Bridging Documents_Pdf Drawings.pdf PDF
Attachment 13 As-Built FP-2.pdf PDF
Attachment 11 Informational Volume 2-Appendices_Final Bridging Documents_CNRC.pdf PDF
Attachment 7 Pre-Award Survey.doc DOC document
Attachment 14 As-Built FP-3.pdf PDF
Attachment 8 SAM Reps and Certs Form.docx DOCX document
Attachment 2 SOW - Houston Upgrade Fire Alarm System 2019_05_26 (003).pdf PDF
Attachment 10 Informational Volume 1-Specifications_Final Bridging Documents_CNRC 2019_05_26.pdf PDF
Solicitation 12805B20R0009.pdf PDF
Attachment 3 Calculation of Self Performed Work.xlsx XLSX spreadsheet
Attachment 1 Wage Determination TX20200253.pdf PDF
Show all 28

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

12805B20R0009 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ARS-12805B

FORT COLLINS CO 80526

BLDG D, SUITE 300

2150 CENTRE AVENUE

USDA ARS PA AAO ACQ/PER PROP

07/20/2020

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO.

5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/04/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose for this amendment is to extend the RFP response to allow proposal preparation based on the recently posted Industry Questions and Answers.

LIST OF CHANGES:

Bids due date : 24-JUL-20 changed to 31-JUL-20

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

KELLY D. WRIGHT

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

File details come from the government source that posted it. Updated .