Attachment 2 Statement of work.pdf
PDF 56 KB Posted
- Solicitation number
- 12444325Q0006
About this file
This Statement of Work outlines the requirements for a certified State of West Virginia waste water operator at the Cheat-Potomac Ranger Station in Petersburg, serving the Department of Agriculture Forest Service. The operator must manage a Class S waste water system.
The contractor's key responsibilities include: conducting site visits once or twice weekly as needed to check tank levels and system functionality; maintaining and cleaning the ultra-violet light system, including bulb replacement (bulbs provided by Forest Service); performing quarterly "grab" sample testing through a certified laboratory at contractor's expense; and maintaining regular communication with district officials regarding system operations. The contractor must provide all necessary tools, labor, and equipment, while system repairs will be the responsibility of the Forest Service once identified by the operator.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Description of Waste Water Operator Duties
Cheat-Potomac Ranger Station, Petersburg
Furnish all tools, labor, and equipment, and be a certified State of West Virginia operator for the appropriate plant class necessary to complete the follow work on the Cheat-Potomac Ranger District, Petersburg administrative site sewer system: The waste water system is a Class S.
- Physically visit the site twice a week when needed, otherwise once a week, to check the level in the tank to assure the system is functioning properly and report the operation at that time to the Forest Service official.
- Check the ultra-violet light to assure proper operation. Perform cleaning and maintenance on the light as necessary. Operator will change bulbs as needed and the Forest Service will provide the bulbs. Repairs will be brought to the attention of the Forest Service, and it will be the responsibility of the Forest Service to have the repairs done.
- Line item 2 - Operator will quarterly take a “grab” sample and deliver sample to be tested by a certified laboratory, meeting approval of the Forest Service, and complete the necessary report. This report will be given to the Forest Service official at the Cheat-Potomac Ranger District, Petersburg for reporting. The contractor is responsible for the cost of this testing, refer to line item 2 in the schedule of items.
- The operator will maintain communication as stated above with the district to keep them informed of the operation of the system.
File details come from the government source that posted it. Updated .