This document is an amendment to a solicitation for the construction of a new two-story Umpqua National Forest Supervisor's Office building and remodeling of an existing Bureau of Land Management building to connect the facilities. The amendment provides responses to vendor questions about the required structural metal framing and clarified wood species for the cross-laminated timber panels. For the framing, 97 mil deflection drift tracks can be used for non-load bearing walls in place of 97 mil tracks. Douglas Fir is the preferred species for the CLT panels and should be harvested and milled in Douglas County, Oregon if possible. The receipt date for offers remains March 10, 2021 at 4:00 pm PST. The solicitation is for the Department of Agriculture Forest Service and involves connecting the new USDA Forest Service building to an existing Bureau of Land Management facility in Douglas County, Oregon.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION
NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
NSN 7540-01-152-8070
Previous edition unusable
Amendment Four (4)
JANET PAUL, Contracting Officer
Umpqua NF Office Building, Douglas County, Oregon: AMENDMENT #4
-- Date and time for receipt of offers remains as follows: 03/10/2021 @ 4:00 pm PST -- See page 2 for responses to two additional vendor inquiries
USDA Forest Service Siuslaw National Forest ATTN: Janet Paul, Contracting 3200 SW Jefferson Way Corvallis, OR 97331
1024659
1240BH21R0002
1 2
03/04/2021
01/28/2021
JANET PAUL Digitally signed by JANET PAUL Date: 2021.03.04 12:30:17 -08'00'
03/04/2021
FS ID # Response
034 Please bid as stated in the specification, i.e. 97 mil.
Douglas Fir is specifically called out as the required species, however, we have added the following: preferably harvested and milled in Douglas County, Oregon
Species: Douglas Fir, preferably harvested and milled in Douglas County, Oregon 06 17 19 2.3 C 2 “Exposed face to utilize Douglas Fir.”
Additionally, as stated in the contract requirements: Appearance and grade, including but not limited to:
‐‐ Specification 06 17 19 1.4 requires submittals, including a 12x12 physical sample, proposed appearance, grade, shop drawings, etc.
‐‐ Specification 06 17 19 2.1 B requires “architectural appearance” per ANSI/APA PRG 320.
‐‐ Specification 06 17 19 2.3 includes additional appearance requirements for CLT panels.
‐‐ Also, 06 17 19 2.1 E states: Finishes: Provide CLT members with standard factory wiped stain and clear varnish finish to enhance the natural tone of the wood as indicated by manufacturer’s designations.
AMENDMENT #4
Solicitation #: 1240BH21R0002
Umpqua National Forest Office Building Questions/Comments/Inquiries, Administrative Comments and Government Responses
Questions/Comments
Page S‐610 detail 1 typical non structural metal framing has note directs you to 7/S‐611 calls out top track to be 97 mil x2 1/2" flange slotted deflection drift track. Question im asking is all non load bearing walls to be a 97 mil top track or can top track be stud gauge match deflection drift track. For example a 33 mil stud wall can top track be a 33 mil deflection drift track.
There are several species and appearance options for the CLT panels. Please clarify what species material and grain/profile is desired.