John Dont Option 2 Project Map.pdf

PDF 4 MB Posted

Attached to
Caldor Suppression Repair and GAOA John Don’t
Solicitation number
12363N23R4006
Issued by

About this file

This document contains a federal contract opportunity and related project map. The federal contract opportunity is solicitation number 12363N23R4006 for the Caldor Suppression Repair and GAOA John Don’t projects. The work includes road repairs, reconditioning, and maintenance on forest roads damaged by recent fires within the Eldorado National Forest. Services required are clearing, grubbing, excavation, installation of drainage features, grading, surfacing with aggregate and asphalt, and signage. The small business set-aside contract is estimated to begin in June 2023. The project map depicts the location of work and includes details such as culvert replacements, slope repairs, and ownership classifications of the land.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5400 5400

004400

580 0

540 0

58 00

6200 6400

6 8 00

"/#0

#0

44741

44741

T11 N R15 E T10 N R15 E

T1 1 N

R

E T1

1 N R

E

T1 1 N

R

E T1

1 N R

E

T11 N R15 E T12 N R15 E

T10 N R15 E T11 N R16 E

T1 0 N

R

E T1

0 N R

E

T11 N R16 E T12 N R16 E

T11 N R16 E T10 N R16 E

T1 2 N

R

E T1

2 N R

E

T11 N R14 E T12 N R14 E

T1 2 N

R

E T1

2 N R

E

15E24

15E40

16E14

16E13

E0

13E 19 Silver Fork Road

10N40T

11N37B

10N32A

11N26A

12N99

11N50

12NY05B

11N37F

11N37KA

11N44

11N26C

11N39A

11N37HB

11N79

11N98A

11NY28

11N52

11N28D

11NY27A

11N52B

11N43

11N33

11N32

11N46

11N55

11N37K

11N40A

12N21

11N99AA

11N98B

11N37HD

17N12U

11N31

11N37FB

11N74

11N37HA

11N83 11N37GW

11N37HC

11NY37

11NY27

11N49

11N98

11N37H

12N25C

11N26E

12N21A

12N25

10N40

12N40

11N28A

10N31A

12NY06

11N99E 11N49D

11N39

12NY06B

11N53

11N28E

11N38

10NY09

12NY06A

11N26B

10N31B

11N58

11N37G

11N47 10N40D

11N42

11N26

11N28

10N31

11N18C

11N37

11N40

12N25B

11N18

11N34

11N34A 11N99A

N9

11N29

John Don't Contract Roads Road Reconditioning, Placement Method 2 - Chip Seal/Asphalt Road Reconditioning, Placement Method 2 - Chip Seal/Asphalt; Clearing and Grubbing Road Reconditioning, Placement Method 2 - Native/Aggregate Road Reconditioning, Placement Method 2 - Native/Aggregate; Clearing and Grubbing Roadway Excavation, Placement Method 2 Aggregate Base, Caltrans Class II, Placement Method 2

Eldorado MVUM Roads Roads Open to All Vehicles, Yearlong Roads Open to All Vehicles, Seasonal Roads Open to Highway Legal Vehicles Only, Yearlong Roads Open to Highway Legal Vehicles Only, Seasonal Special Vehicle Designation, Yearlong

!. Construct Swale !. Construct Rocked Swale !. Construct Rolling Dip !. Reconstruct Dip "/ Aggregate Base, Caltrans Class II, Placement Method 2 "/ Pit run, maximum size 4 inch "/ Asphalt Concrete Pavement Patching, Type 3 #0 Replace 18 inch culvert with 48 x 30 inch elliptcal culvert #0 Fill Slope Repair #0 Armored Crossing

National Forest Land

OWNERSHIP CLASSIFICATION

USDA FOREST SERVICE

NON-FS

! ! Transmission Line FS Trail

44741 County Road 147 4436 County Road 63

0 0.45 0.9 1.35 1.80.225 Miles

File details come from the government source that posted it. Updated .