R4.pdf

PDF 657 KB Posted

Attached to
Install Government Metal Building and Slab Work
Solicitation number
1232SC18R0017
Issued by

About this file

Drawing - Instructions

View the file

Other files

File Type Posted
R12.pdf PDF
ss_E3.pdf PDF
R8.pdf PDF
ss_E4.pdf PDF
R10.pdf PDF
ss_E6.pdf PDF
1232SC18R0017_Amendment_0001.pdf PDF
R1.pdf PDF
ss_E9.pdf PDF
R5.pdf PDF
R11.pdf PDF
R2.pdf PDF
ss_E1.pdf PDF
R13.pdf PDF
ss_E10.pdf PDF
ss_E7.pdf PDF
R3.pdf PDF
ss_E8.pdf PDF
ss_E5.pdf PDF
ss_E2.pdf PDF
R7.pdf PDF
R9.pdf PDF
ss_F1.pdf PDF
R6.pdf PDF
Stamped_DuroBeam_217-38_Calcs_2018-03-16.pdf PDF
Solicitation_1232SC18R0017.pdf PDF
Stamped_DuroBeam_217-38_60x80_fndt_2018-3-16.pdf PDF
Atch_1_-_DOL_Wage_Determination,_OH82,_Mod_8,_dated_6-15-2018.pdf PDF
Atch_2_-_Statement_of_Work_Prefab_Metal_Bldg.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R4 04May '14

Erection Guide

NEVER STEP ON LIGHT TRANSMITTING PANELS,

TRANSLUCENT PANELS, OR UNATTENDED ROOF PANELS.

STEP 5: INSTALL SIDEWALL PANELS

STEP 6: INSTALL ENDWALL PANELS

STEP 7: INSTALL ROOF PANELS

STEP 8: INSTALL TRIM AND ACCESSORIES

PBR

STEP 7: INSTALL ROOF PANELS (Con't)

Th is pa rts or de r t o b e u se d f or fie ld mo dif ica tio n o f o rg ina l jo b 1

5- B-

AutoCAD SHX Text Page

AutoCAD SHX Text Date

AutoCAD SHX Text Rev.

AutoCAD SHX Text Insulation (Not by manufacturer)

AutoCAD SHX Text Starting at a building corner, attach the first piece of blanket insulation to the contact tape on the eave strut. Pull tight and adhere to tape at the base. It is recommended that insulation not be installed more than 6 feet ahead of panels.

AutoCAD SHX Text 5C: Sidewall panels should be installed so that the panel sidelap is in a direction away from the prevailing wind. (refer to appropriate lap detail included with erection drawings.)

AutoCAD SHX Text 5D: Install remaining sidewall insulation and panels, being careful to maintain correct panel coverage. It is suggested that the foundation be marked in increments of panel width to allow visual checking of panel coverage as installation progresses.

AutoCAD SHX Text 5E: At the finishing corner of a sidewall, the last panel may required additional lap or trimming for installation of corner trim refer to the details in the erection drawings.

AutoCAD SHX Text Roof panels must be completely attached to the purlins and to panels on either side before they can be a safe walking surface. Light transmitting panels or translucent panels can never be considered as a walking surface. Partially attached or unattached panels should never be walked on! Do Not: 1. Step on rib at edge of panel. 2. Step near crease in rib at edge of panel. 3. Step within 5 feet of edge on unsecured panel. A single roof panel must never be used as a work platform. An OSHA approved runway should be used for work platforms! (Consult OSHA Safety and Health Regulations for the Construction Industry). Safety First!

AutoCAD SHX Text NOTE It is the responsibility of the erector to provide temporary erection bracing until the structure is completed. This bracing is to remain in place until all roof and wall panels are installed.

AutoCAD SHX Text

WOOD BLOCKING FOR GIRT ALIGNMENT

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

SIDEWALL PANELS

AutoCAD SHX Text 5A: Before installing wall panels, the girts must be aligned to a level position so that there is no visible sag. This should be done directly ahead of panel installation. Girt leveling may be accomplished by standing a section of gable angle vertically against the outside girt flanges at approximate mid-bay location. When girts are level, attach the girt flanges to the angle with vise grip pliers or temporary screws. Wood blocking cut to fit the spaces may also be used for alignment. NOTE: Temporary girt blocking is not recommended on concealed fastener panels. The removal of the blocks after panel installation can cause oil canning.

AutoCAD SHX Text

FRAME

AutoCAD SHX Text

EAVE STRUT

AutoCAD SHX Text

GIRT

AutoCAD SHX Text

WOOD BLOCKING

AutoCAD SHX Text NOTE: Wall panel type and installation details will vary. Refer to the erection drawings and details for the specific panel used for your building.

AutoCAD SHX Text

SIDEWALL INSULATION MUST MEET ENDWALL INSULATION TO SEAL THE CORNER

AutoCAD SHX Text

CONTACT TAPE

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

BASE ANGLE/TRIM

AutoCAD SHX Text

CONTACT TAPE

AutoCAD SHX Text 5B: If walls are to be insulated, place a continuous run of contact tape along the eave strut and base member. NOTE: : At the base, cut off the insulation a minimum of 1/2" above the bottom of the wall panel. This will prevent the insulation from hanging below the wall panel and wicking moisture.

AutoCAD SHX Text Wall Panel

AutoCAD SHX Text Note: Trim insulation and Trim insulation and turn vinyl back Insulation must not be exposed to weather.

AutoCAD SHX Text Finished Floor

AutoCAD SHX Text Base Detail (See Erection Drawings)

AutoCAD SHX Text Screw Alignment Panel (Through Fastened Panel Only)

AutoCAD SHX Text

PRE-DRILLED TEMPLATE SHEET

AutoCAD SHX Text

STACKED SHEETS TO BE DRILLED

AutoCAD SHX Text

KEEP END OF PANELS ALIGNED

AutoCAD SHX Text NOTE: After drilling panels, it is important to clean metal filings off all panel surfaces, including between panels that are not installed that day, to avoid rust stains.

AutoCAD SHX Text

ENDWALL PANELS

AutoCAD SHX Text

CORNER TRIM

AutoCAD SHX Text

SIDEWALL PANELS

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text 6A: Install gable angles/supports onto the ends of purlins and eave struts. This angle is to butt-up to each other or is spliced as required except at expansion joints where a one inch gap is maintained between ends of adjacent sections to allow for expansion. Gable angle splices may occur on or between purlins and the angle must be attached to each purlin and the eave strut. NOTE: Wall panel type and installation details will vary. Refer to the erection drawings Wall panel type and installation details will vary. Refer to the erection drawings and details for the specific panel used for your building.

AutoCAD SHX Text NOTE Detail shown for ribbed roof panel only. For standing seam rake and gable angle installation, see erection details.

AutoCAD SHX Text

END FRAME RAFTER

AutoCAD SHX Text

PURLIN

AutoCAD SHX Text

GABLE ANGLE

AutoCAD SHX Text

AT EXPANSION JOINT

AutoCAD SHX Text

TYPICAL BUTT LAP CONDITION

AutoCAD SHX Text 6B: See erection drawings sheeting layouts for panel starting dimensions, panel trim locations, and lap locations.

AutoCAD SHX Text

TRIM DIMENSION IS MEASURED FROM CENTER OF FIRST MAJOR RIB.

AutoCAD SHX Text

TRIM

AutoCAD SHX Text NOTE: Check periodically to ensure that all panels are aligned and plumb. : Check periodically to ensure that all panels are aligned and plumb.

AutoCAD SHX Text

GABLE ANGLE

AutoCAD SHX Text

CONTACT TAPE

AutoCAD SHX Text

ENDWALL GIRT

AutoCAD SHX Text

WOOD BLOCKING

AutoCAD SHX Text

BASE ANGLE/TRIM

AutoCAD SHX Text

CONTACT TAPE

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

SIDEWALL

AutoCAD SHX Text

ENDWALL

AutoCAD SHX Text

EAVE STRUT

AutoCAD SHX Text

PURLIN

AutoCAD SHX Text 6C: Align and level girts on endwall. 6D: If the walls are to be insulated, place a continuous run of contact tape along the gable angle and base member. Starting at the corner of the endwall, attach the first piece of insulation to the contact tape on the gable angle, pull tight and adhere to tape at the base. Cut off excess insulation. It is recommended that insulation not be installed more than 6 feet ahead of panels. NOTE: At the base cut off the insulation a minimum of 1/2 inch above the bottom of the wall panel. This will prevent the insulation from hanging below the wall panel and wicking moisture. 6E: Start at the corner, trim panel (if required) and set in place. Refer to corner details in the erection drawings for the panel starting distance from the corner, When the panel is located and plumb, install fasteners. 6F: Install remaining endwall insulation and panels, being careful to maintain the correct panel coverage as suggested in step 5D. 6G: Install corner trim.

AutoCAD SHX Text NOTE It is the responsibility of the erector to provide temporary erection bracing until the structure is completed. This bracing is to remain in place until all roof and wall panels are installed.

AutoCAD SHX Text

WOOD BLOCKING FOR GIRT ALIGNMENT

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

SIDEWALL PANELS

AutoCAD SHX Text

ENDWALL PANELS

AutoCAD SHX Text 7A: Install eave trim over top of sidewall panels and eave struts with fasteners per erection drawings eave detail. 7B: If the roof is insulated, place a continuous run of contact tape along top of eave struts at both sidewalls. Lay a starter roll of blanket insulation from eave to eave across roof and secure to contact tape. (refer to packing list for width of insulation starter roll). It is recommended that insulation be installed no more than 6 feet ahead of panels.

AutoCAD SHX Text Panels May Collapse If Not Properly Secured!

AutoCAD SHX Text

RAKE TRIM

AutoCAD SHX Text

FRAMED OPENING

AutoCAD SHX Text

EAVE GUTTER

AutoCAD SHX Text

PERSONNEL DOOR

AutoCAD SHX Text 8A: Install rake trim and gable closure. 8B: If included with the building, install the eave gutter, corner closures and downspouts. NOTE: Remove all loose fasteners, blind rivets, drill shavings, etc... from gutter to guard against corrosion. 8C: Install accessories (doors, windows, louvers, etc...) not previously installed. Refer to the appropriate details for installation instructions. IMPORTANT: Remove debris from roof and wall surfaces during installation and after. Remove debris from roof and wall surfaces during installation and after. Clean surface of sheeting as required to remove smudges and touch-up any minor/mild scratches with color match touch-up paint.

AutoCAD SHX Text

EAVE STRUT

AutoCAD SHX Text 1"

AutoCAD SHX Text Wall Panel

AutoCAD SHX Text Insulation (Not by manufacturer)

AutoCAD SHX Text Insulation (Not by manufacturer)

AutoCAD SHX Text Roof Panel

AutoCAD SHX Text weather.

AutoCAD SHX Text Insulation must not be exposed to

AutoCAD SHX Text Trim insulation and turn vinyl back

AutoCAD SHX Text %%uNote:

AutoCAD SHX Text Double Faced Tape (Not by manufacturer) to be used to secure insulation.

AutoCAD SHX Text Vapor Barrier to INSIDE of Building

AutoCAD SHX Text Fiberglass Insulation to OUTSIDE of Building

AutoCAD SHX Text %%UEave Detail

AutoCAD SHX Text (See Erection Drawings)

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text

SIDEWALL PANELS

AutoCAD SHX Text

ENDWALL

AutoCAD SHX Text

PANELS

AutoCAD SHX Text

INSULATION

AutoCAD SHX Text NOTE: For PBR roofs with a ridge panel, it is recommended that both sides of roofs with a ridge panel, it is recommended that both sides of the ridge of a building be sheeted simultaneously. This will keep the insulation covered for the maximum amount of time and the panel ribs can be kept in proper alignment for the ridge panel. This is critical on the "PBR" panels so that the ridge caps can be properly installed. Check for proper coverage as the sheeting progresses. Note panel-sheeting sequence below!

AutoCAD SHX Text 7C: Install the first run of roof panels across the building from eave to eave, or eave to ridge. To allow proper installation of rake trim, the starting location for the first panel must be as shown in rake details included with the erection drawings. When the first run is properly located and aligned with the correct endlaps and eave overhang, fasten to purlins. Roof panels should be installed so that the sidelap is in a direction away from the prevailing wind. Refer to appropriate lap detail. 7D: Install remaining roof insulation and panels. To avoid accumulative error due to panel coverage gain or loss, properly align each panel before it is fastened. Occasional checks should be made to ensure that correct panel coverage is maintained. Special attention should be given to fastener, mastic and closure requirements. Refer to details with erection drawings. 7E: At finishing end of roof, the last panels may require field modification for installation of rake trim. Refer to rake details. DO NOT BACK LAP THROUGH FASTENED ROOF SHEETS. NOTE: Roof panel types and installation requirements will vary. Refer to the appropriate details for the specific panel used. IMPORTANT: Loose fasteners, blind rivets, drill shaving, ETC. must be removed from roof to guard against corrosion.

AutoCAD SHX Text Project Name & Location:

AutoCAD SHX Text Customer:

AutoCAD SHX Text Job Number:

AutoCAD SHX Text Sheet Number:

AutoCAD SHX Text Checked by:

AutoCAD SHX Text For Approval (Not For Construction)

AutoCAD SHX Text For Erector Installation

AutoCAD SHX Text For Construction Permit

AutoCAD SHX Text Drawn by:

AutoCAD SHX Text Date

AutoCAD SHX Text Revision

AutoCAD SHX Text Description

AutoCAD SHX Text By

AutoCAD SHX Text Ck'd

AutoCAD SHX Text Scale:

AutoCAD SHX Text Drawing Status:

AutoCAD SHX Text Project Engineer:

AutoCAD SHX Text Preliminary (Not For Construction)

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text R4 of 13

AutoCAD SHX Text

RRB 2/5/18

AutoCAD SHX Text

PHONE: 1.800.445.0412

AutoCAD SHX Text Pompano Beach, Florida 33060

AutoCAD SHX Text www.durobuildings.com

AutoCAD SHX Text 351 South Cypress Road Suite 100

AutoCAD SHX Text Duro Beam

AutoCAD SHX Text

THE BEST PRE-ENGINEERED I-BEAM BUILDINGS

AutoCAD SHX Text The engineer whose seal appears hereon is an employee for the manufacturer, NCI Groups, Inc. or one of its affiliates, for the materials described herein. Said seal or certification is limited to the products designed and manufactured by manufacturer only. The undersigned engineer is not the overall engineer of record for this project.

AutoCAD SHX Text

METAL STORAGE BUILDING ATTN:ANDY DOKLOVIC WOOSTER, OH.

AutoCAD SHX Text

METAL STORAGE BUILDING WOOSTER, OH

AutoCAD SHX Text 15-B-12547

AutoCAD SHX Text

DRST1B

AutoCAD SHX Text

ENST1A