R3.pdf
PDF 752 KB Posted
- Attached to
- Install Government Metal Building and Slab Work
- Solicitation number
- 1232SC18R0017
About this file
Drawing - Instructions
View the file
Other files
| File | Type | Posted |
|---|---|---|
| R12.pdf | ||
| ss_E3.pdf | ||
| R8.pdf | ||
| ss_E4.pdf | ||
| R10.pdf | ||
| ss_E6.pdf | ||
| 1232SC18R0017_Amendment_0001.pdf | ||
| R1.pdf | ||
| ss_E9.pdf | ||
| R5.pdf | ||
| R4.pdf | ||
| R11.pdf | ||
| R2.pdf | ||
| ss_E1.pdf | ||
| R13.pdf | ||
| ss_E10.pdf | ||
| ss_E7.pdf | ||
| ss_E8.pdf | ||
| ss_E5.pdf | ||
| ss_E2.pdf | ||
| R7.pdf | ||
| R9.pdf | ||
| ss_F1.pdf | ||
| R6.pdf | ||
| Stamped_DuroBeam_217-38_Calcs_2018-03-16.pdf | ||
| Solicitation_1232SC18R0017.pdf | ||
| Stamped_DuroBeam_217-38_60x80_fndt_2018-3-16.pdf | ||
| Atch_1_-_DOL_Wage_Determination,_OH82,_Mod_8,_dated_6-15-2018.pdf | ||
| Atch_2_-_Statement_of_Work_Prefab_Metal_Bldg.pdf |
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R3 04Jul '14
Erection Guide
PRE-ERECTION NOTES:
LAYOUT OF BUILDING COMPONENT
GENERAL ERECTION NOTES
TEMPORARY CONSTRUCTION BRACING
PANEL CAUTIONS AND NOTES
FASTENER INSTALLATION
MASTIC SEALANT
IMPORTANT NOTE:
STEP 1: ERECT FIRST BAY WALL FRAMING
STEP 2: ERECT FIRST BAY ROOF FRAMING
CAUTION
STEP 3: ERECT ENDWALL GIRTS AND FIRST INTERIOR BAY
STEP 4: ERECT REMAINING STRUCTURAL FRAMING
Th is pa rts or de r t o b e u se d f or fie ld mo dif ica tio n o f o rg ina l jo b 1
5- B-
AutoCAD SHX Text Page
AutoCAD SHX Text Date
AutoCAD SHX Text Rev.
AutoCAD SHX Text Measure along adjacent sides of foundation using a pair of dimensions shown. If the diagonal distance between these points is as noted, the corner is square. Diagonal measurements between opposite Anchor Rods will indicate if these bolts are set square.
AutoCAD SHX Text The following notes, procedures and suggested recommendations are important parts of the pre-erection process. 1.) Prior to the time the erection crew arrives, a responsible person should check the job site for foundation readiness, square, and accuracy and Anchor Rod size and location. The drawing shown below indicates a method which may be used to check the foundation and bolts for square.
AutoCAD SHX Text 2.) When unloading the building, carefully check off each item from the packing list. Bundles and boxes will have a list attached indicating the contents. 3.) Unload and layout the building columns on the foundation. 4.) Unload the rafters onto the foundation so that they can be erected from whichever end of the building you wish to start. Your crane will move from one end of the building to the other while standing columns and hanging rafters . 5.) Layout the girts and purlins on dunnage or wood blocking around the foundation as near as possible to where they will be installed. 6.) Unload and place trim crates out of the way, since these will be the last required. 7.) Unload and place panels and insulation out of the way. NOTE: In extremely cold conditions, the vinyl facing on insulation will become brittle, requiring very careful handling. 8.) Avoid lifting panel stacks with cables, chains or other devices which could damage the panel. Upon unloading, and every morning thereafter, inspect he panel bundles for moisture between the panels. This is especially important with galvalume or galvanized panels. The panel finish must be protected at all times before and during erection to preserve the appearance and function of the panels. 9.) All hardware boxes should be protected from theft and moisture, especially items such as tube caulking and locksets. Store mastic away from heat.
AutoCAD SHX Text
ANCHOR RODS
AutoCAD SHX Text
DIAGONALS SHOULD BE EQUAL
AutoCAD SHX Text
MEASURE
AutoCAD SHX Text
MEASURE
AutoCAD SHX Text
CLIPS
AutoCAD SHX Text
BOLTS & SCREWS
AutoCAD SHX Text
RAMP
AutoCAD SHX Text
1. Girts, Eave Struts and Purlins 2. End Frames and Endpost 3. Main Frames 4. Clips, Bolts, Screws, ETC. 5. Endwall Girts
AutoCAD SHX Text 1.) Layout primary and secondary framing around the slab as shown. 2.) Place components and crates on the slab or on wood blocking to prevent contact with the ground. 3.) Block one end of components higher than other end to allow drainage of rain water. 4.) Leave one end of the building open for erection equipment access. 5.) Construct temporary ramp of timbers from grade to slab to prevent damage to concrete edge from equipment traffic. 6.) Install clips and flange braces onto columns and rafters before these members are in the air. Clip and flange brace locations are shown on erection drawings.
AutoCAD SHX Text 24'
AutoCAD SHX Text 12'
AutoCAD SHX Text 6'
AutoCAD SHX Text 10'
AutoCAD SHX Text 20'
AutoCAD SHX Text 40'
AutoCAD SHX Text 8'
AutoCAD SHX Text 16'
AutoCAD SHX Text 32'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1.) All clips, flange braces, bolts, bracing systems, ETC. must be installed as shown on erection drawings. 2.) It is extremely important, especially during construction, that panels at the eaves, rakes and ridges be kept secure. 3.) Column bases must not be lag screwed or "RED HEADED" to concrete unless specified on erection drawings for the building. 4.) Tighten column wind brace rods/cables (exterior and interior) before tightening roof rods/cables. Roof rods/cables are tightened from eave to peak. 5.) High strength bolts (A325) must be used where specified.
AutoCAD SHX Text 1.) It is the responsibility of the erector to maintain stability of the structure during all stages of erection, particularly when left overnight. 2.) Temporary supports, such as temporary guys, braces or other elements shall be the total and complete responsibility of the erector. The temporary supports required shall be determined and furnished by the erector. 3.) Temporary construction supports shall be provided wherever necessary to accommodate all construction loads to which the structure may be subjected, left in place as long as may be required for safety.
AutoCAD SHX Text To minimize potential of corrosive action at the bottom edge of wall panels, the contractor must assure that the following procedures are followed: 1.) The concrete foundation should be cured for a minimum of seven (7) days before wall panels are installed. (un-cured concrete is highly alkaline and metal panels can undergo varying degrees of corrosive attack when in direct contact with the concrete.) After the first week of the curing cycle, the reaction between metallic coatings on steel and the concrete is essentially halted.
AutoCAD SHX Text 2.) Top of finish grade at building to be a minimum of four (4) inches below bottom of panel. 3.) Finish grade is to slope away from building to ensure proper drainage. 4.) Upon completion of finish grading, all dirt is to be cleaned from around base of wall panel where it may have collected in panel notch or on base trim.
AutoCAD SHX Text Correct fastener installation is one of the most critical steps when installing roof/wall panels. Drive the fastener in until it is tight and the washer is firmly seated. Do not overdrive fasteners. A slight extrusion of neoprene around the washer is a good visual tightness check. Always use the proper tool to install fasteners. A fastener driver (screw gun) with a RPM of 1700-2000 should be used for self-drilling screws. A 500-600 RPM fastener driver should be used for self-tapping screws. Discard worn sockets, these can cause the fastener to wobble during installation.
AutoCAD SHX Text NOTE: Always remove metal filings from surface of panels at the end of each work period. Rusting filings can destroy the paint finish and void any warranty.
AutoCAD SHX Text Proper mastic application is critical to the weather tightness of a building. Mastic should not be stretched when installed. Apply only to clean, dry surfaces. Keep only enough mastic on the roof that can be installed in a day. During warm weather, store mastic in a cool dry place. During cold weather (below 60º) mastic must be kept warm (60º-90º) until application. After mastic has been applied, keep protective paper in place until panel is ready to be installed.
AutoCAD SHX Text All details, recommendations and suggestions contained in the ERECTION GUIDE portion of this drawings set are for general guidelines only, and not meant to be all-inclusive. Industry accepted installation practices with regard to all areas not specifically discussed in this section should be followed. Only experienced, knowledgeable installers familiar with accepted practices should be used to assure a quality project. It is emphasized that the Manufacturer is only a manufacturer of metal building components and is not engaged in the installation of its products. Opinions expressed by the Manufacturer about installation practices noted in the ERECTION GUIDE are intended to represent only a guide as to the sequencing and how the components could be assembled to create a building. Both the quality and safety of installation and the ultimate customer satisfaction with the completed building are determined by the experience, expertise, and skills of the installation crews, as well as the equipment available for handling the materials. Actual installation operations, techniques and site conditions are beyond the Manufacturers control.
AutoCAD SHX Text
CORRECT DEGREE OF TIGHTNESS NOTE SLIGHT CIRCLE OF SEALANT
AutoCAD SHX Text
TOO TIGHT SEALANT SQUEEZED TOO THIN EXTRUDES FAR BEYOND FASTENER HEAD
AutoCAD SHX Text
SLOPE FINISH GRADE AWAY FROM BUILDING
AutoCAD SHX Text
PANEL NOTCH (SHOWN) OR BASE TRIM
AutoCAD SHX Text
CLEAN DIRT FROM AROUND PANEL BASE
AutoCAD SHX Text
WALL PANEL
AutoCAD SHX Text
FOUNDATION
AutoCAD SHX Text
1/4" GAP MIN.
AutoCAD SHX Text
4" MIN.
AutoCAD SHX Text
TOO LOOSE SEALANT IS NOT COMPRESSED TO FORM SEAL
AutoCAD SHX Text NOTE It is the responsibility of the erector to provide temporary erection bracing until the structure is completed.ted.
AutoCAD SHX Text
PRIMARY FRAME
AutoCAD SHX Text
BRACING
AutoCAD SHX Text
GIRT
AutoCAD SHX Text
EAVE STRUT
AutoCAD SHX Text
END FRAME RAFTER
AutoCAD SHX Text
END POST
AutoCAD SHX Text
CORNER COLUMN
AutoCAD SHX Text
END BAY (BRACED)
AutoCAD SHX Text
INTERIOR BAY
AutoCAD SHX Text 1A: Determine from erection drawings furnished with the building the location of the first braced bay. Framing for this bay will be erected first. 1B: Stand adjacent primary frame column and corner column over the anchor rods. Shim or chip out under the base plate if required to ensure that the base is level, at the correct elevation, and is in full contact with the foundation. Plumb and align the columns and install washers and nuts onto the Anchor Rods. NOTE: The end frame may be a bearing frame with the rafter supported by end posts, or a rigid frame with the rafter self-supporting, and not attached to the end posts. The procedure shown is for a bearing frame. If the building has a rigid end frame, it is erected the same as interior frames as described in steps 1 and 2. 1C: Attach wall girts to the primary frame column and corner column. Bolt girts to the corner column with two bolts. Bolt girt to primary frame column with one bolt through the column flange and secure bolt with sub-nut (see detail on erection drawings). 1D: Install the eave strut by bolting to the top of the columns. Refer to the erection drawings and attach column flange brace where shown. Flange braces may be required on one or both sides of the columns. If a flange brace connects to a girt in the adjacent bay, that brace will be bolted to the girt after the adjacent bay girts are installed. NOTE: As wall girts are installed around the building, framing for factory located framed openings and accessory framing to which the girts attach should be installed. Field located accessory framing may be installed at the same time as girts or at a later time. 1E: Install wall bracing systems (rods, cables, knee bracing, portal bracing) at this time but do not tighten completely until the bay is plumbed. 1F: Repeat steps 1B thru 1E for wall framing on the opposite side of the building. 1G: Attach clips to the end posts and stand these posts over the Anchor Rods. Follow the procedure as described for corner columns in step 1B. 1H: Bolt required clips and flange braces to the end frame rafter sections and lift into place atop the end posts. Bolt rafter sections to corner column and end post cap plates. Bolt rafter sections together at peak.
AutoCAD SHX Text
PURLINS
AutoCAD SHX Text
PRIMARY FRAME RAFTER
AutoCAD SHX Text
TEMPORARY ERECTION BRACING
AutoCAD SHX Text
BRACING
AutoCAD SHX Text
END FRAME
AutoCAD SHX Text
END POST
AutoCAD SHX Text
END
AutoCAD SHX Text
FRAME
AutoCAD SHX Text
END
AutoCAD SHX Text
POST
AutoCAD SHX Text Until rafters are bolted in place with purlins and flange braces installed, they are easily damaged by incorrect or careless handling procedures. Use extreme caution when lifting rafters. Two booms should be used to lift any pinched rafter section 80 feet or more in length. 2A: Bolt primary frame rafter together at peak connection (unless rafter length requires lifting in sections). Attach the required clips and flange braces to the rafter before lifting since these items are more easily installed on the ground. Lift rafter into place between sidewall columns and install bolts in rafter to column knee connections. 2B: Install end bay purlins from end frame rafter to the first interior frame rafter. The end bay purlins will overlap the interior bay purlins at the frame as described in step 1C. Complete flange brace connection to purlins. 2C: Install roof bracing systems but do not tighten completely until the bay is plumbed. 2D: Plumb and square the first bay. After alignment, tighten wall bracing first and the roof bracing working from eave to peak. Tighten any remaining bolts. Plumbing and aligning a total structural system begins with the first braced bay and continues through completion. Accurate alignment of the first bay is essential for correct alignment of succeeding bays. The installer is responsible for choosing the best method suited for plumbing and aligning the structural system.
AutoCAD SHX Text NOTE It is the responsibility of the erector to provide temporary erection bracing until the structure is completed.ted.
AutoCAD SHX Text NOTE It is the responsibility of the erector to provide temporary erection bracing until the structure is completed.ted.
AutoCAD SHX Text
END BAY PURLIN
AutoCAD SHX Text
END FRAME RAFTER
AutoCAD SHX Text
END POST
AutoCAD SHX Text
ENDWALL GIRT
AutoCAD SHX Text
CORNER COLUMN
AutoCAD SHX Text
END BAY GIRT
AutoCAD SHX Text
TEMPORARY ERECTION BRACING
AutoCAD SHX Text 3A: After end frame is plumb and square, install endwall girts and flange braces for end post if required. 3B: Attach wall girts to the primary frame columns (see step 1C). 3C: Install eave struts (see step 1D). 3D: Attach roof purlins for this bay to the two rafters. Purlins will bolt to the rafter flange in the same manner as girts to column flanges (see step 1C). Connect flange braces to purlins. 3E: Check alignment, plumb and square the two bays just erected. Tighten all bolts and bracing.
AutoCAD SHX Text
PURLINS
AutoCAD SHX Text
EAVE STRUT
AutoCAD SHX Text
GIRTS
AutoCAD SHX Text
PRIMARY FRAME
AutoCAD SHX Text
TEMPORARY ERECTION BRACING
AutoCAD SHX Text
BRACING
AutoCAD SHX Text Starting at the opposite end of the first bay erected, install the remaining interior frames, girts, purlins, eave struts, bracing, end frames and end posts using the procedures described in the preceding steps. Be sure all wall girts, roof purlins and flange braces as shown on the erection drawings are installed. Constant checks should be made to ensure the building is square, plumb and aligned.
AutoCAD SHX Text All X-Bracing should be checked that it is installed to a taut condition with all slack removed. Do not tighten beyond this state.
AutoCAD SHX Text NOTE It is the responsibility of the erector to provide temporary erection bracing until the structure is completed.ted.
AutoCAD SHX Text Project Name & Location:
AutoCAD SHX Text Customer:
AutoCAD SHX Text Job Number:
AutoCAD SHX Text Sheet Number:
AutoCAD SHX Text Checked by:
AutoCAD SHX Text For Approval (Not For Construction)
AutoCAD SHX Text For Erector Installation
AutoCAD SHX Text For Construction Permit
AutoCAD SHX Text Drawn by:
AutoCAD SHX Text Date
AutoCAD SHX Text Revision
AutoCAD SHX Text Description
AutoCAD SHX Text By
AutoCAD SHX Text Ck'd
AutoCAD SHX Text Scale:
AutoCAD SHX Text Drawing Status:
AutoCAD SHX Text Project Engineer:
AutoCAD SHX Text Preliminary (Not For Construction)
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text R3 of 13
AutoCAD SHX Text
RRB 2/5/18
AutoCAD SHX Text
PHONE: 1.800.445.0412
AutoCAD SHX Text Pompano Beach, Florida 33060
AutoCAD SHX Text www.durobuildings.com
AutoCAD SHX Text 351 South Cypress Road Suite 100
AutoCAD SHX Text Duro Beam
AutoCAD SHX Text
THE BEST PRE-ENGINEERED I-BEAM BUILDINGS
AutoCAD SHX Text The engineer whose seal appears hereon is an employee for the manufacturer, NCI Groups, Inc. or one of its affiliates, for the materials described herein. Said seal or certification is limited to the products designed and manufactured by manufacturer only. The undersigned engineer is not the overall engineer of record for this project.
AutoCAD SHX Text
METAL STORAGE BUILDING ATTN:ANDY DOKLOVIC WOOSTER, OH.
AutoCAD SHX Text
METAL STORAGE BUILDING WOOSTER, OH
AutoCAD SHX Text 15-B-12547
AutoCAD SHX Text
DRST1B
AutoCAD SHX Text
ENST1A
File details come from the government source that posted it.