This document contains an amendment to a solicitation and questions and answers related to a federal contract opportunity for the design and construction of high tunnels at the USDA Agricultural Research Service facility in Geneva, New York. The amendment incorporates questions and answers into the solicitation documents and maintains the proposal due date of September 15, 2022. Key details include: the requirement is for the design and construction of high tunnels; the contractor must integrate controls with the existing Automated Logic building automation system and use only Logic Controls Solutions equipment; the period of performance is 210 days from notice to proceed; bonds are required for awards over $35,000 and $150,000 respectively; site visits will be held on August 23, 2022 with registration required by August 22; questions are due by August 26; and the associated NAICS code is 236220 for commercial and institutional building construction with a small business size standard of $39.5 million.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12305B22R0018 Wellington High Tunnels.pdf | ||
| QASP - Wellington High Tunnels.pdf | ||
| PWS Wellington High Tunnels Geneva NY.pdf | ||
| Geneva Wellington HHGH High Tunnel EA.pdf | ||
| SUBMITTAL LOG - Wellington High Tunnels .xlsx | XLSX spreadsheet | |
| WD NY20220032 22JUL22 - Wellington High Twr Geneva NY.pdf | ||
| Self Performed Work worksheet.docx | DOCX document | |
| EMR Certification - Wellington High Tunnels.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12305B22R0018 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12305B
BELTSVILLE MD 20705
BLDG 003, RM 223, BARC-WEST
10300 BALTIMORE AVENUE
USDA ARS NEA AAO ACQ/PER PROP
08/01/20220001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/01/2022
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Wellington High Tunnels, PGRU, Geneva, NY
1. Purpose: incorporate Questions & Answers into the solicitation documents.
2. Due date remains unchanged at 15SEP22 at 1700 Hrs. Submit by email only to:
jason.robbins@usda.gov.
END
Period of Performance: 09/23/2022 to 04/21/2023
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JASON ROBBINS
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
1. Our largest sliding doors are 8¿W x 8¿H, not 16¿x12¿ like specified. Additionally, you typically cannot mount a 12¿H door on a structure with 12¿H endwalls, as you typically need at least a 1¿ clearance for framing. I was surprised to see that in the Rimol spec. Would a 14¿W x 11¿H steel rollup door (link w/ pictures and spec here:https://www.farmtek.com/farm/supplies/ProductDisplay?mfPartNumber=111569N) be acceptable? Otherwise, you¿ll need to adjust to 13-14¿H sidewalls to fit such a tall door, due to endwall headers and framing getting in the way. Having doors over-hang the structure¿s endwall also presents a large concern for wind damage, which a rollup door solves, while offering a similar rough opening.
USDA Answer: We originally looked into rollup doors. The purpose for the 8W¿x12H¿ doors that are intended to be mounted on the exterior of the building is to give the researchers maximum use of the openings which is what the researcher wants. Rimol will provide the sliding doors specified in the PWS.
2. Using exhaust fans on each upper-gable will lead to subpar ventilation and static pressure issues, burning out fan motors prematurely, and causing a sub-par environment for plants. We typically will design for an exhaust fan on one gable wall and a louver on the other, to promote adequate airflow and optimal air exchange. Please see the attached JPG and the highlighted equipment to see what I¿m speaking about.To accommodate this proven design, would it be acceptable to replace the (4x) 36¿ exhaust fans with (2x) 48¿ exhaust fans and (2x) 54¿ louver intake?
USDA Answer: The USDA agrees with the contractor regarding the ventilation issues. Conversation with the greenhouse manufacturer recommends two 36¿ fans in the gable and two 36¿x60¿ louver intakes in the opposite gable on each greenhouse for a total of four (4) 36¿ fans and four (4) 36¿x60¿ louvers.
3.Please clarify the quantity and location of yard hydrants, interior hose bibs, and frost-free hose bibs(if any).
USDA Answer: We want a total of 4 freeze-proof yard hydrants inside the greenhouse, one nearly centered at each of the 30¿ walls. Another freeze-proof yard hydrant shall be provided for the pavilion on at the nearest corner post to the main underground water line run to the greenhouse.
4. Is Automated Logic the actual building controls company, if not, who? And, is there a contact person/number for the building control/building management system?
USDA Answer: Yes, a new USDA laboratory using Automated Logic will be completed soon. All new structures will need to connect to the system. Currently, the controls to be installed in the greenhouse will be standalone, but will be connected to the main system in the future. Note, work statement requires an empty conduit with pullstring run to the barn. Per the Automated Logic rep, the description for the controls system in the work statement should suffice to provide connectivity to Automated Logic products.
We do not have a USDA contact person, however, I have provided the Logic Control Solutions contact below.
Todd Cardella Procurement Manager, Logic Control Solutions, 829 Phillips Road, Victor, NY 14564 C: 585.905.8016 T: 585.424.5340 x218 F: 585.424.5369
5. Do we need to install a drain inside the greenhouse? If so, how many?
USDA Answer: Drainage is necessary for both gravel/crusher run floor and the concrete pad option. This is a performance work statement, therefore, number, size, type drainage shall be left up to contractor to design in the areas where the yard hydrants will be located.
END
https://nam10.safelinks.protection.outlook.com/?url=https://www.farmtek.com/farm/supplies/ProductDisplay?mfPartNumber=111569N&data=05%7C01%7CGreg@aventusnv.com%7C049092c29988419aa53a08da850bfd59%7C69d041eb918a4bbea02acec9e586828a%7C0%7C0%7C637968583814538356%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0=%7C3000%7C%7C%7C&sdata=5/qNYHGKEDpNBT7SoJ15vG+hldsCKAl2rXJBgbXkkfs=&reserved=0