Ravens Roost Cabin_trail log_09012020updated.pdf

PDF 103 KB Posted

Attached to
Raven’s Roost Cabin Construction Federal contract opportunity
Solicitation number
12010920R0004
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

This document contains a project log and related federal contract opportunity notice for construction of the Raven's Roost Cabin. The project log details the trail and site work required, including aggregate surfacing, concrete steps, elevated walkways, metal staircases, and related site elements. The contract opportunity is for design and construction of a single-story 16'x20' cabin, covered deck, porch, and new trail construction. Optional items include demolition of an existing cabin and outhouse with site rehabilitation, and supplying furnishings and propane heating for the new cabin. The Forest Service is the contracting agency, with a performance period from May through November 2020 and a magnitude between $250,000 to $500,000. The pre-solicitation notice encourages interested offerors to visit the remote project sites located near Petersburg, Alaska, which are only accessible by helicopter or incomplete trail.

View the file

Other files for this federal contract opportunity

Other files attached to Raven’s Roost Cabin Construction, newest first.
File Type Posted
Question Post FBO.docx DOCX document
amendment_002_.pdf PDF
Revised 17 sideElevs.pdf PDF
00_AllDwgs_RRCabin_L T_09022020.pdf PDF
Existing 1980 Ravens Roost Cabin Constr Dwgs.pdf PDF
Updated Design Narrative_RRCabin_L T_09012020.pdf PDF
Preproposal Meeting Notes 8.27.2020 Q A.pdf PDF
Representations and Certifications.docx DOCX document
Revised Section B C and Special Project Specifications.pdf PDF
amendment_001_.pdf PDF
Design Narrative.docx DOCX document
Wage Determination AK20200001 June 2020.pdf PDF
RRCabinAllDwgs95percent.pdf PDF
12010920R0004 Ravens Roost Cabin final.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RAVEN'S ROOST CABIN CONSTRUCTION PROJECT

KEY TO WORK ITEMS:

ABBREV. DESCRIPTION

AS AGGREGATE SURFACING

AS PAD AGGREGATE SURFACING PAD

CS CONCRETE STEP

ELEV WW ELEVATED WALKWAY

FGG FIBERGLASS GRATING

MS METAL STAIRS

WA WORK AREA

GENERAL NOTES

1). The beginning of work areas are marked on the ground by wood stakes with the work area number written upon them. Leave all stakes in place until such time that the work is accepted by the Government. Should a stake be missing, notify the Government for replacement prior to the commencement of work in that area.

2). The work area values shown is approximate feet from the beginning of the project or referenced.

3). The quantities of steps shown are estimates given for the contractor's convenience only. Actual quantities may vary. The contractor is responsible for verifying actual quantities.

TRAIL LOG

WORK AREA

BEGIN

DIST.

AHEAD QUAN.

WORK

AREA

END

WORK

ITEMS DEPTH (IN) NOTES

0+00 45 0+45 AS 10 0+00 located at junction of existing Raven Trail and Pond Loop Trail.

0+45 11 7 0+56 CS

0+56 4 25 0+60 AS PAD 10 Approx. 25 SF

0+60 18 MS Stair to end at FFE of Cabin at edge of deck. Stairs at 55% grade

0+60 7 0+67 AS 10

0+67 19 8 0+86 CS

0+86 34 1+20 AS 10 WA ends at Outhouse Junction. CL of spur to propane tank at 1+13 1+13 7 AS 10 Trail to Propane Tank Pad. See Drawings

40 AS PAD 10 Propane Tank Pad, approx 40 SF.

From Outhouse Junction (at STA 1+20) 1+20 24 1+44 AS 10 Trail from Outhouse Junction to rear of Cabin.

1+44 9 1+53 FGG

Fiberglass grate approach ramp (approx. 4 LF) and 5x5 level fiberglass grate landing at cabin entry per drawings. Secure fiberglass grate to framework supporting cabin landing and overlap 1 LF at other end with aggregate at transition with Type AS trail. See drawings.

1+20 67 1+87 AS 10 Trail to Outhouse.

1+87 14 2+01 ELEV WW 5'-wide elevated walkway with approach ramp per drawings. Overlap 1 LF of fiberglass grate with aggregate at transition with Type AS trail. See drawings.

1+20 56 1+76 AS 10 Trail to western junction with Pond Trail.

1+76 25 13 2+01 CS

2+01 22 2+23 AS 10 End of WA at western junction with Pond Trail.