About this file

This is an addendum to structural sheets for the Pecan Valley Golf Course Bridge Replacement project, a City of Fort Worth, Texas Parks & Recreation Department initiative designed by Baird, Hampton & Brown engineering firm (TBPELS Firm #44, #10011302). The project involves the demolition and removal of an existing bridge, two concrete abutments, and several trees, along with concrete sidewalks, followed by construction of one replacement bridge with two new concrete abutments, new sidewalks, and newly planted trees. The bridge specifications include a clear width of 8 feet, metal and concrete deck options, vertical safety rails, rub rails, and a truss configuration with floor beams and diagonal bracing. The structural sheet revision, dated August 19, 2026, provides bridge profile details symmetrical about the center line, with the actual profile and configuration subject to manufacturer variation and requiring shop drawing approval from the architect, engineer, and owner prior to construction.

The project is located at Pecan Valley Golf Course in Fort Worth, Texas, with control point coordinates and elevation data provided for survey purposes. The contractor is required to contact multiple utility providers including AT&T, Fort Worth Water Department, Fort Worth Transportation & Public Works, Atmos Energy, ONCOR, TXU Energy, SBC Telephone, and Charter Communications at least 48 hours prior to excavation. The contractor must also protect all existing trees, fences, retaining walls, and structures unless otherwise specified. The project documentation references coordination with civil and abutment details, with verification required regarding horizontal and vertical control measurements relative to the bridge centerline.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLEAR WIDTH OF BRIDGE

8' - 0"

1.

3'

- 6

"4.

BY

M

AN

UF

AC

TU

RE

R

TR

US

S

DE

PT

H

METAL DECK CONCRETE DECK

SIDE DAM

TOE RAIL

VERTICAL

SAFETY RAIL

RUB RAIL

TOP CHORD

BOTTOM CHORD

FLOOR BEAM

BRACE DIAGONAL

NOTE:

1. BRIDGE PROFILE SHOWN FOR INFORMATION ONLY. ACTUAL PROFILE AND CONFIGURATION WILL VARY FROM MANUFACTURER TO MANUFACTURER. SUBMIT SHOP DRAWINGS OF BRIDGE PROFILE TO ARCHITECT, ENGINEER, AND OWNER FOR APPROVAL.

INCREASE ABUTMENT WIDTH

IF LARGER THAN 1'-0"

INCREASE ABUTMENT WIDTH

IF LARGER THAN 1'-0"

PIPING/CONDUIT

ALL THREAD CONNECTION

TO FLOOR BEAM

UNISTRUT PIPE/CONDUIT

SUPPORT

5'- 0"

2'- 5"

VERIFY W/ CIVIL& ABUTMENTS

+/- 150'-0"

CL OF BRIDGESYMMETRICAL ABOUT

DIAGONALVERTICAL

METAL DECK

TOP CHORD

CONCRETE DECK

FLOOR BEAM

BOTTOM CHORD

NOTE:

1. BRIDGE PROFILE SHOWN FOR INFORMATION ONLY. ACTUAL PROFILE AND CONFIGURATION WILL VARY FROM MANUFACTURER TO MANUFACTURER.

SUBMIT SHOP DRAWINGS OF BRIDGE PROFILE TO ARCHITECT, ENGINEER, AND OWNER FOR APPROVAL.

NEW ABUTMENTS

SEE DETAILS

HORIZONTAL & VERTICAL CONTROL

NO.

DESCRIPTION

REVISIONS

DATE

CONSTRUCTION NOTES

PE

C

AN

V

AL

LE

Y G

O

LF

C O

U R

SE

B

R

ID

G E

R

EP

LA

C

EM

EN

T X

K

D O

E#

PARK & RECREATION DEPARTMENT

CITY OF FORT WORTH, TEXAS

6300 Ridglea Pl, Suite 700 | Fort Worth, TX 76116

BAIRD, HAMPTON & BROWN

engineering & surveying

(817)251-8550 | mail@bhbinc.com | TBPELS Firm #44, #10011302

BHB PROJECT # 2024.723.000

PECAN VALLEY GOLF COURSE

BRIDGE REPLACEMENT

N

W

S

E

CONTROL POINT #50CONTROL POINT #50

5/8" CIRS5/8" CIRS

N: 6924554.65N: 6924554.65 E: 2292100.19E: 2292100.19

ELEV: 625.47ELEV: 625.47

DOEDOE

CITY PROJECTCITY PROJECT

TPW PROJECTTPW PROJECT

WATER PROJECTWATER PROJECT

SEWER PROJECTSEWER PROJECT

MAP NO.MAP NO.

K-K-

MAPSCO NO. 87-YMAPSCO NO. 87-Y

AT&T 1-800-878-8711AT&T 1-800-878-8711

FORT WORTH WATER DEPT.-FIELD OPERATIONS (817) 871-8296FORT WORTH WATER DEPT.-FIELD OPERATIONS (817) 871-8296

FORT WORTH T&PW (817) 871-8100FORT WORTH T&PW (817) 871-8100

ATMOS ENERGY (817) 215-4366ATMOS ENERGY (817) 215-4366

ONCOR GAS & ELECTRIC (817) 215-6214ONCOR GAS & ELECTRIC (817) 215-6214

TXU ENERGY 1-800-233-2133TXU ENERGY 1-800-233-2133

SBC TELEPHONE (817) 338-6819SBC TELEPHONE (817) 338-6819

CHARTER COMM. (817) 509-6272 EXT. 3363CHARTER COMM. (817) 509-6272 EXT. 3363

ALL OTHER FACILITIES 1-800-DIG-TESSALL OTHER FACILITIES 1-800-DIG-TESS

THE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TOTHE CONTRACTOR SHALL CONTACT THE FOLLOWING AT LEAST 48 HOURS PRIOR TO

EXCAVATING AT EACH LOCATION:EXCAVATING AT EACH LOCATION:

NOTE: CONTRACTOR SHALL PROTECT ALL EXISTING TREES, FENCES,NOTE: CONTRACTOR SHALL PROTECT ALL EXISTING TREES, FENCES, RETAINING WALLS AND STRUCTURES UNLESS OTHERWISE RETAINING WALLS AND STRUCTURES UNLESS OTHERWISE

NOTED.NOTED.

CONTROL POINT #53 CONTROL POINT #53

5/8" CIRS 5/8" CIRS

N: 6924376.80 N: 6924376.80 E: 2291946.51 E: 2291946.51

ELEV: 625.63 ELEV: 625.63

CONTROL POINT #52CONTROL POINT #52

5/8" CIRS5/8" CIRS

N: 6924565.40N: 6924565.40 E: 2291874.49E: 2291874.49

ELEV: 627.13ELEV: 627.13

DESIGNED:DESIGNED:

DRAWN:DRAWN:

SCALE:SCALE: DATE:DATE: SHEETSHEET

As indicated

JL

BRIDGE STEEL DETAILS

08/04/2026JL 18

NO SCALE

2 BRIDGE SECTION

SCALE: 3/8" = 1'-0"

1 BRIDGE PROFILE

ADDENDUM 02 08/19/2026

08/19/2026

18 - BRIDGE STEEL DETAILS

File details come from the government source that posted it. Updated .