115 - Pincushion 2 MP 2.143 - 100 pct Schedule of Items.pdf
PDF 601 KB Posted
- Attached to
- Superior National Forest Trail Bridges
- Solicitation number
- 12445524B0002
- Issued by
-
Department of Agriculture Forest Service
About this file
This document contains a schedule of items for a federal construction contract solicitation. The solicitation is for replacement of three trail bridges in the Superior National Forest in Minnesota. Work will include traffic control, demolition of existing bridges, installation of new timber abutments and wing walls, furnishing and placing aggregate, installing signs and markers, furnishing and installing timber superstructures including deck systems and railings, seeding and mulching disturbed areas, and protecting waterways and wetlands from erosion. Pricing is provided for various contract line items including mobilization, surveying, erosion control measures, excavation and backfill, riprap, geotextiles, aggregate base, treated timber for superstructures and substructures, topsoil placement, seeding, rolled erosion control products, signs, posts, and object markers. The solicitation is a total small business set-aside under NAICS code 237310 with a size standard of $45 million. The awarding agency is the US Department of Agriculture Forest Service.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I - SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
090902-21025E SNOW-2.143
Trail Bridge #2 Replacement
Gunflint Ranger District Superior National Forest Cook County, Minnesota
B- 1 - SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization
Lump Sum
15201
Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________
15702
Silt Sock
Foot
15711
Check Dams
Each
20102
Clearing and Grubbing, Disposal Method A
Acre
0.01
20304
Removal of Old Structure, Disposal Method A
20401
Roadway Excavation, Compaction Method B
Cubic Yard
20411 Embankment, CIP Cubic Yard 8 $________ $________
20801
Structure Excavation
20803
Structural Backfill
25101 Riprap, Class 0, Machine Placed Cubic Yard 5 $________ $________
25101.1 Riprap, Class II, Machine Placed Cubic Yard 23 $________ $________
25116 Geotextile, Type III, Class I Square Yard 26 $________ $________
30103
Aggregate Base, Grading D, Compaction Method B
55704
Treated Structural Timber, Superstructure
55706
Treated Structural Timber, Substructure Lump Sum
62403
Placing Conserved Topsoil, 3-inch
Square Yard
62503
Seeding, Dry Method
62901 Rolled Erosion Control Product, Type 2.D With Natural Netting Square Yard 139
63301 Signs, Type III Sheeting Square foot 3
63306
Post, Steel, 3 lb
Foot
63307
Object Markers, Carsonite, High Intensity Reflectivity
Each
63501
Temporary Traffic Control
Total:
B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
2. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.
3. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05
4. Quantities for aggregate are compacted in place volumes.