115 - Pincushion 2 MP 2.143 - 100 pct Schedule of Items.pdf

PDF 601 KB Posted

Attached to
Superior National Forest Trail Bridges
Solicitation number
12445524B0002
Issued by

About this file

This document contains a schedule of items for a federal construction contract solicitation. The solicitation is for replacement of three trail bridges in the Superior National Forest in Minnesota. Work will include traffic control, demolition of existing bridges, installation of new timber abutments and wing walls, furnishing and placing aggregate, installing signs and markers, furnishing and installing timber superstructures including deck systems and railings, seeding and mulching disturbed areas, and protecting waterways and wetlands from erosion. Pricing is provided for various contract line items including mobilization, surveying, erosion control measures, excavation and backfill, riprap, geotextiles, aggregate base, treated timber for superstructures and substructures, topsoil placement, seeding, rolled erosion control products, signs, posts, and object markers. The solicitation is a total small business set-aside under NAICS code 237310 with a size standard of $45 million. The awarding agency is the US Department of Agriculture Forest Service.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PART I - SCHEDULE OF ITEMS

SECTION B – SERVICES AND PRICES

090902-21025E SNOW-2.143

Trail Bridge #2 Replacement

Gunflint Ranger District Superior National Forest Cook County, Minnesota

B- 1 - SCHEDULE OF ITEMS

ITEM

NO.

DESCRIPTION

PAY

UNIT

EST.

QTY.

UNIT

PRICE

TOTAL

PRICE

15101

Mobilization

Lump Sum

15201

Construction Survey and Staking, Method 1, Tolerance Class C Lump Sum 1 $________ $________

15702

Silt Sock

Foot

15711

Check Dams

Each

20102

Clearing and Grubbing, Disposal Method A

Acre

0.01

20304

Removal of Old Structure, Disposal Method A

20401

Roadway Excavation, Compaction Method B

Cubic Yard

20411 Embankment, CIP Cubic Yard 8 $________ $________

20801

Structure Excavation

20803

Structural Backfill

25101 Riprap, Class 0, Machine Placed Cubic Yard 5 $________ $________

25101.1 Riprap, Class II, Machine Placed Cubic Yard 23 $________ $________

25116 Geotextile, Type III, Class I Square Yard 26 $________ $________

30103

Aggregate Base, Grading D, Compaction Method B

55704

Treated Structural Timber, Superstructure

55706

Treated Structural Timber, Substructure Lump Sum

62403

Placing Conserved Topsoil, 3-inch

Square Yard

62503

Seeding, Dry Method

62901 Rolled Erosion Control Product, Type 2.D With Natural Netting Square Yard 139

63301 Signs, Type III Sheeting Square foot 3

63306

Post, Steel, 3 lb

Foot

63307

Object Markers, Carsonite, High Intensity Reflectivity

Each

63501

Temporary Traffic Control

Total:

B-2 - NOTE: Payment for bond premiums in accordance with Clause 52.232-5, Payments under Fixed-Price Construction Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.

Payment will be made on actual work performed as described in FP-14 109.01 unless otherwise noted.

1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP-14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.

2. Optional bid items will only be awarded based on available funds. Zero or all items or a combination of items may be awarded. Contractor shall provide pricing for all optional items.

3. All clearing, grubbing, bedding, borrow, backfill, detours, diversions, signing, and other miscellaneous items not listed above with unique bid items shall be considered incidental to the contract. See 109.05

4. Quantities for aggregate are compacted in place volumes.