This solicitation is for a total small business set-aside contract to replace three trail bridges in the Superior National Forest. The work includes demolishing and removing existing bridges; constructing new timber abutments, wing walls, and associated hardware; installing rip rap, backfill, geotextile drainage material, and aggregate; furnishing and installing timber superstructures including dowel-laminated deck systems, curb/railing systems, and associated hardware; approach rail systems; seeding and mulching disturbed areas; and protecting waterways and wetlands from construction impacts. Bid opening will be held on the specified date at the Superior National Forest Supervisors Office in Duluth, Minnesota. The intent is to provide for the replacement of the Pincushion Mountain Loop Bridge #2 at milepost 2.143, Pincushion Mountain Loop Bridge #6 at milepost 0.545, and the Caribou Snowmobile Trail Bridge #91044 over Noname Creek at milepost 10.556. The soliciting agency is the Department of Agriculture Forest Service.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

United States Department of Agriculture Forest Service

EASTERN REGION

SUPERIOR NATIONAL FOREST - GUNFLINT RANGER DISTRICT

COOK COUNTY

MINNESOTA

PINCUSHION MOUNTAIN LOOP

TRAIL BRIDGE #2 REPLACEMENT @ MP 2.143

TO MAPLE HILL

BRIDGE #1

(17 TON CAPACITY)

JUNCTION B JUNCTION D

JUNCTION E

BRIDGE #7

(15 TON CAPACITY)

PROJECT

LOCATION

RECOMMENDED BY:

STEPHEN

POPKOWSKI

FOREST ENGINEER

Digitally signed by STEPHEN

POPKOWSKI

Date: 2023.06.05 10:33:50 -05'00'

DATE

TO GRAND

MARAIS

PINCUSHION

TRAIL HEAD

SUPERIOR

HIKING TRAIL

JUNCTION F

NORTH COUNTRY

NATIONAL SCENIC

TRAIL

PROJECT SITE

21025E SNOW

BRIDGE #3

(UNKNOWN CAPACITY)

DISTRICT RANGER

Digitally signed by MYRA

THEIMER

Date: 2023.06.06 11:44:09 -05'00'

DATE

FROM THE US HWY 61 / GUNFLINT TRAIL INTERSECTION NORTHEAST OF

GRAND MARAIS, MINNESOTA, HEAD NORTH ON GUNFLINT TRAIL FOR 2.5

MILES, THEN TURN RIGHT ONTO PINCUSHION DRIVE. CONTINUE ON

PINCUSHION DRIVE FOR 0.2 MILES TO THE TRAIL HEAD. CONTINUE ON

THE WEST OVERLOOK TRAIL FOR 0.5 MILES, THEN TURN RIGHT AT

JUNCTION B. CONTINUE ON PINCUSHION MOUNTAIN LOOP FOR 0.83

MILES, THEN TURN RIGHT AT JUNCTION E. CONTINUE ON 3K CUT OFF FOR

0.37 MILES, THEN TURN LEFT AT JUNCTION F. CONTINUE ON 21025E

SNOW TO BRIDGE LOCATION (0.5 MILES BEYOND JUNCTION F).

FOREST SUPERVISOR DATE

R9 BRIDGE PROGRAM MANAGER DATE

APPROVED:

PROJECT LOCATION

R9 DIRECTOR OF ENGINEERING DATE

SHEET 1 OF 10

STRUCTURE NUMBER: 090902-21025E SNOW-2.143 (LAT 47.7725, LONG -90.2962)

PROPOSED STRUCTURE DESCRIPTION:

29.5 FOOT (OVERALL LENGTH) SINGLE SPAN, DOWEL-LAM SLAB

BRIDGE WITH TIMBER CRIB FOUNDATIONS.

5/1 1/2

:2

JA

LL

EN

Z

:\U

-0

U

SD

A

FS

R

TS

T-

US

FS

B

RI

DG

E

ID

IQ

BR

ID

GE

S\

DW

GS

\T

AS

K

SU

PE

RI

OR

NF

P

IN

CU

SH

IO

N

LO

OP

2\M

P 2.1

P

IN

CU

SH

IO

N

LO

OP

#2

.D W

G;

MYRA THEIMER

PROJECT LOCATION:

INDEX OF SHEETS

SHEET SHEET TITLE DATE

G-01 TITLE SHEET 5/12/2023

C-02 DESIGN DATA & GENERAL NOTES 5/12/2023

C-03 TEMPORARY TRAIL CLOSURE 5/12/2023

C-04 TYPICAL SECTIONS 5/12/2023

C-05 PLAN OF SITE 5/12/2023

C-06 PROFILE OF SITE 5/12/2023

C-07 PLAN OF STRUCTURE 5/12/2023

C-08 ABUTMENT PLAN AND ELEVATION 5/12/2023

C-09 STRUCTURE DETAILS 5/12/2023

C-10 QUANTITIES & MISCELLANEOUS DETAILS 5/12/2023

DESIGN DATA:

LIVE LOAD DEFLECTION DOES NOT EXCEED 1/360 OF THE SPAN LENGTH.

PEDESTRIAN LIVE LOAD = 90 PSF

LOAD RATING (RATING FACTORS):

H-10 (CONCURRENT WITH SNOW LOAD)

INVENTORY RATING (STRENGTH 1, DECK, MOMENT). ....................................................................................................... 1.31

OPERATING RATING (STRENGTH 1, DECK, MOMENT). ....................................................................................................... 1.69

H-15 (WITHOUT SNOW LOAD)

INVENTORY RATING (STRENGTH 1, DECK, MOMENT). ....................................................................................................... 1.07

OPERATING RATING (STRENGTH 1, DECK, MOMENT). ....................................................................................................... 1.39

DEAD LOAD:

THE DESIGN UNIT WEIGHT FOR ALL TIMBERS. ............................................................................................................. 50 PCF

THE BRIDGE CURB LOAD. .............................................................................................................................. 28 PLF (PER SIDE)

SNOW LOAD. ............................................................................................................................................................................. 70 PSF

HYDRAULIC DATA:

100 YEAR FREQUENCY

DRAINAGE AREA. ................................................................................................................................................................. SQ MI

Q100. ................................................................................................................................................................................... 79.7 CFS

VELOCITY THRU STRUCTURE. ................................................................................................................................... 5.48 FPS

BRIDGE OPEN AREA THRU STRUCTURE. ........................................................................................................ 81.38 SQ FT

FLOW AREA THRU STRUCTURE. ......................................................................................................................... 20.95 SQ FT

HIGH WATER ELEVATION. ........................................................................................................................................ 1004.36 FT

SCOUR CRITICAL CODE

GENERAL NOTES:

EXCEPT WHERE OTHERWISE INDICATED ON THESE PLANS OR IN THE SUPPLEMENTAL SPECIFICATIONS, ALL MATERIALS AND WORKMANSHIP SHALL BE IN ACCORDANCE WITH THE FHWA STANDARD SPECIFICATIONS FOR CONSTRUCTION OF ROADS AND BRIDGES ON FEDERAL HIGHWAY PROJECTS, FP-14.

THE PROPOSED IMPROVEMENTS COVERED BY THESE PLANS ARE IN ACCORDANCE WITH:

LRFD GUIDE SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, DECEMBER 2009. WITH 2015 INTERIM REVISIONS.

AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 9TH EDITION, 2020

AASHTO GUIDELINES FOR GEOMETRIC DESIGN OF LOW-VOLUME ROADS, 2ND EDITION, 2019

FSH 7709.56b TRANSPORTATION STRUCTURES HANDBOOK (USDA FOREST SERVICE) TIMBER BRIDGES: DESIGN, CONSTRUCTION, INSPECTION, AND MAINTENANCE (USDA FOREST SERVICE)

NATIONAL DESIGN SPECIFICATIONS FOR WOOD CONSTRUCTION 2018

THE EXISTING STRUCTURE SHALL BE CHECKED AT THE TIME OF STARTING CONSTRUCTION TO SEE THAT ITS RELATIONSHIP TO THE PROPOSED WORK IS AS SHOWN ON THESE PLANS AND ANY DIFFERENCES REQUIRING CHANGES IN THE NEW WORK SHALL BE REPORTED TO THE PROJECT ENGINEER.

THE WORK COVERED BY THESE PLANS INCLUDES REMOVAL OF THE ENTIRE EXISTING BRIDGE, INSTALLATION OF THE NEW BRIDGE AS SHOWN HEREIN AND PER THE MANUFACTURER'S DRAWINGS AND SPECIFICATIONS, CONSTRUCTION OF THE APPROACHES TO THE LIMITS SHOWN, AND SLOPE

RESTORATION.

THE STATIONING AS SHOWN ON THESE PLANS FOR REFERENCE POINTS "A" AND "B" ARE BELIEVED TO BE CORRECT. IT SHALL, HOWEVER, BE CHECKED AT THE TIME OF STARTING CONSTRUCTION, AND IF THE STATIONING SHOWN ON THE PLANS IS INCORRECT, IT SHALL BE REPORTED TO THE ENGINEER.

THE CONTRACTOR SHALL COORDINATE ALL OF THEIR WORK AND ANY UTILITY COMPANIES RELOCATION WORK AT NO ADDITIONAL COST TO THE

PROJECT.

FOR PROTECTION OF UNDERGROUND UTILITIES AND IN CONFORMANCE WITH PUBLIC ACT 174, THE CONTRACTOR SHALL DIAL "811" A MINIMUM OF THREE FULL WORKING DAYS, EXCLUDING SATURDAYS, SUNDAYS AND HOLIDAYS PRIOR TO BEGINNING EACH EXCAVATION IN AREAS WHERE PUBLIC

GENERAL NOTES:

NO WORK SHALL BE PERFORMED ON FEDERAL HOLIDAYS OR WEEKENDS WITHOUT PRIOR APPROVAL FROM THE FOREST SERVICE CONTRACTING

OFFICER REPRESENTATIVE.

THE CONTRACTOR SHALL NOT PERFORM IN-STREAM WORK BETWEEN APRIL 1ST THROUGH JUNE 30TH. NO IN-STREAM WORK SHALL BE PERFORMED

AFTER SEPTEMBER 15TH.

THE CONTRACTOR SHALL VERIFY WITH THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE THAT THE BAT SURVEY HAS BEEN

COMPLETED PRIOR TO BEGINNING CONSTRUCTION.

SPECIFICATIONS:

ALL GRADING COMBINATIONS, AND SIZE REFER TO DOUGLAS FIR UNLESS SHOWN OTHERWISE ON THE PLANS. THE DESIGN VALUES FOLLOW LRFD SECTION 8.4.1. THESE ARE THE MINIMUM REQUIREMENTS. OTHER SPECIES MAY BE USED WITH APPROVAL FROM THE FOREST SERVICE

CONTRACTING OFFICER REPRESENTATIVE AND AT NO ADDITIONAL COST TO THE GOVERNMENT.

GRADING:

ALL DOUGLAS FIR-LARCH TO BE GRADED PER WCLIB STANDARD GRADING RULES. SOUTHERN PINE TO BE GRADED PER SPIB.

MATERIAL & TREATMENT:

TIMBER PRESERVATION TREATMENT SHALL BE IN ACCORDANCE WITH CURRENT STATE AND/ OR AASHTO SPECIFICATIONS. ALL TIMBER SHALL BE

TREATED WITH COPPER NAPHTHENATE HYDROCARBON SOLVENT A, PER AWPA, UC4C (MINIMUM).

REFERENCE DESIGN VALUES SHOWN ARE PER AASHTO LRFD BRIDGE DESIGN SPECIFICATIONS, 9TH EDITION, 2020 (U.N.O.)

DECK TO BE 12" DOUGLAS FIR-LARCH, NO.1 & BETTER (> 2 INCH WIDE) S1S. REFERENCE DESIGN VALUES (KSI): Fbo = 1.20, Fvo = 0.18, Eo = 1,800

SPREADER BEAMS TO BE DOUGLAS FIR-LARCH, NO.1 (BEAMS AND STRINGERS). REFERENCE DESIGN VALUES (KSI): Fbo = 1.35, Fvo = 0.17, Eo = 1,600

CURBS & SCUPPERS TO BE DOUGLAS FIR-LARCH NO.1 (POSTS AND TIMBERS) S1S1E. REFERENCE DESIGN VALUES (KSI): Fbo = 1.20, Fvo = 0.17, Eo = 1,600

TIMBER CRIBBING SHALL BE SOUTHERN PINE NO. 1 OR BETTER (5" x 5" AND LARGER), Fb = 1,350 PSI

ALL TIMBER IS ROUGH UNLESS OTHERWISE NOTED.

MISCELLANEOUS:

ALL TIMBER TO BE CUT EXACT LENGTH, DRESSED TO SIZE REQUIRED AND ALL PRACTICAL FRAMING TO BE DONE PRIOR TO TREATMENT.

ALL DECK PLANKS SHALL BE PREDRILLED PRIOR TO TREATMENT.

ALL PLANK FOR DECK PANELS SHALL BE PRECISION END TRIMMED TO LENGTH WITH 1/4" UNDERLENGTH & NO OVERLENGTH TOLERANCE PERMITTED.

DECK PANELS SHALL BE ASSEMBLED WITH 3/8" DIAMETER RING SHANK DOWELS. ALL DOWELS ARE TO BE SIMULTANEOUSLY DRIVEN WITH EQUAL FORCE USING A MECHANICAL PRESS THE FULL LENGTH OF THE DECK. ENSURING ALL HEADS ARE FLUSH WITH THE SURFACE OF THE TIMBER PLANK.

MULTIPLE IMPACT TOOLS ARE NOT TO BE USED TO SET DOWELS BECAUSE OF POTENTIAL FOR WOOD FIBER RUPTURE.

SUBMIT SHOP DRAWINGS FOR BRIDGE DECK AND RAILINGS.

DECK PANELS WILL BE DELIVERED TO JOBSITE AFTER BEING FULLY ASSEMBLED AT FABRICATION PLANT.

ALL HARDWARE FOR TIMBER CONNECTIONS TO MEET ASTM A307-97 GALVANIZED TO F2329 (A153). ALL HIGH STRENGTH HARDWARE FOR CURB AND SPREADER BEAM CONNECTIONS TO MEET ASTM F3125 GRADE A325 OR GRADE A449 GALVANIZED TO A153.

OBJECT MARKERS SHALL BE 72 INCH, YELLOW FLEXIBLE CARSONITE MARKERS WITH BLACK AND YELLOW REFLECTIVE STRIPING.

CONSTRUCTION NOTES:

THE CONTRACTOR SHALL SUBMIT A RIPRAP GRADATION TEST RESULT ACCORDING TO ASTM D5519 PRIOR TO PLACING ROCK.

DOWEL LAMINATED DECK:

TIMBER DECK PANELS ARE MARKED IN THE SHOP FOR USE IN FIELD PLACEMENT OF THE PANELS ON THE CAPS, e.g. A1, B1, C1.

PANEL "A" IS PLACED FIRST IN ITS FINAL POSITION ON THE CAPS. NEXT DRILL THE 11/16" DIA. HOLES THRU PANEL INTO CAP IN EACH END OF PANEL AT THE LOCATION SHOWN AND FASTEN THE 3/4" DIA. DM. HD. DR. SPKS. NEXT PLACE PANEL "C" SO THAT ITS UPPER SPLICE BLOCK IS DIRECTLY OVER THE LOWER SPLICE BLOCK ON PANEL "A" AND DRAW TIGHT TOGETHER. THEN DRILL THE 9/16" DIA. HOLES THRU LOWER SPLICE BLOCK AND DRIVE THE 5/8" DM. HD. DR. SPIKES IN LOCATION SHOWN. THEN DRILL HOLES THRU PANEL INTO CAP AND FASTEN THE 3/4" DM. HD. DR. SPKS. THEREAFTER, SUCCESSIVELY PLACE PANEL "B" IN THE SAME MANNER, ENSURING ALL PANELS ARE DRAWN TIGHT TOGETHER BEFORE ANY FASTENING OCCURS.

STEEL BANDING ON PANELS IS TO BE REMOVED AFTER PANELS HAVE BEEN PLACED IN THEIR FINAL POSITION ON THE CAPS.

ALL HOLES DRILLED IN THE FIELD WHERE SPIKES ARE USED ARE TO BE 1/16" SMALLER THAN THE SPIKE SIZE.

EASTERN REGION

PROJECT NAME

PINCUSHION MOUNTAIN

LOOP TRAIL BRIDGE #2

REPLACEMENT @ MP 2.143

SUPERIOR

NATIONAL FOREST

GUNFLINT

RANGER DISTRICT

DRAWING TITLE

DESIGN DATA &

GENERAL NOTES

DATE

ARCHIVE NO.

UTILITIES HAVE NOT BEEN PREVIOUSLY LOCATED. MEMBERS WILL THUS BE ROUTINELY NOTIFIED. THIS DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF NOTIFYING UTILITY OWNERS WHO MAY NOT BE A PART OF THE "GOPHER STATE ONE CALL" ALERT SYSTEM.

IN LIEU OF A GEOTECHNICAL INVESTIGATION, THE FOUNDATIONS WERE DESIGNED WITH A MAXIMUM BEARING PRESSURE OF 1,100 PSF FOR THE SERVICE LIMIT STATE AND 1,700 PSF FOR THE STRENGTH LIMIT STATE, BASED ON GROSS WIDTH OF THE FOOTING. THE CONTRACTOR SHALL VERIFY SOILS PRIOR TO CONSTRUCTION OF ABUTMENTS BY HAND PROBE, HAND DIGGING AND/OR BACKHOE TO A MINIMUM DEPTH OF 4 FEET BELOW THE BOTTOM OF FOOTING. IF ORGANIC, SOFT OR OTHERWISE UNSUITABLE SOILS ARE ENCOUNTERED, HE SHALL CONTACT THE FOREST SERVICE

CONTRACTING OFFICER REPRESENTATIVE FOR FURTHER INSTRUCTION.

WATER LEVEL IS SUBJECT TO CHANGE. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE EXPECTED WATER LEVELS DURING

CONSTRUCTION.

NO MATERIAL SHALL BE ALLOWED TO ERODE INTO THE WATER COURSE, NOR SHALL MATERIAL BE PLACED INTO THE WATER COURSE EXCEPT AS

SHOWN ON THESE PLANS.

ALL EQUIPMENT SHALL BE CLEANED ACCORDING TO THE SPECIFICATIONS PRIOR TO USE ON THIS PROJECT. CONTRACTOR SHALL MAKE EQUIPMENT

AVAILABLE FOR INSPECTION PRIOR TO MOBILIZATION ONTO FS LANDS.

THE CONTRACTOR SHALL STOP WORK IMMEDIATELY AND NOTIFY THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE IF HERITAGE

RESOURCES OR HUMAN REMAINS ARE ENCOUNTERED.

ALL HOLES DRILLED FOR BOLTS ARE TO BE 1/16" LARGER THAN BOLT SIZE.

HOLES DRILLED FOR 3/4" LAG BOLTS ARE TO BE 9/16" IN DIAMETER FOR THE THREADED PORTION OF THE BOLT AND 13/16" FOR THE SHANK.

ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH TIMBER TO HAVE ONE PLATE WASHER BETWEEN NUT & TIMBER, AND BOLT HEAD &

TIMBER.

ANY NUT OR MACHINE BOLT HEAD IN DIRECT CONTACT WITH STEEL TO HAVE ONE CUT WASHER BETWEEN NUT & STEEL, OR BOLT HEAD & STEEL.

SET THREADS ON ALL BOLTS AT NUT WITH A CENTER PUNCH AFTER TIGHTENING.

ABUTMENTS TO BE BACKFILLED WITH CLEAN GRANULAR FILL PER PLAN. TIMBER CRIBBING TO BE FILLED IN WITH RIPRAP, CLASS 0, MACHINE PLACED.

ALL TIMBER CUT OR DRILLED IN THE FIELD SHALL BE TREATED WITH COPPER NAPHTHENATE (MATCH PROVIDED TREATMENT TYPE).

ALTHOUGH ALL PRACTICAL PRE-FRAMING WILL BE DONE PRIOR TO TREATING, SOME CUTTING & DRILLING WILL BE REQUIRED IN THE FIELD.

IF GALVANIZED FASTENERS ARE CUT OR DAMAGED IN THE FIELD, THEY SHALL BE REPLACED OR TOUCHED UP WITH COLD GALVANIZING COMPOUND

AT THE DISCRETION OF THE FOREST SERVICE CONTRACTING OFFICER REPRESENTATIVE.

DESIGNER

C.SMITH

DRAWN

J.ALLEN

CHECKED

G.JUNTTILA

PROJECT NO.

U28-02592

DWG SHEET NO.

SHEET 2 OF

W20-3

W20-3

MOUNTED

ON BARRICADE

R11-2

TEMPORARY

TRAIL CLOSURE

TRAFFIC CONTROL PLAN KEY

SIGN

TYPE III BARRICADE

ALL SIGNS, EXCEPT THOSE MOUNTED ON TYPE III BARRICADES SHALL BE

MOUNTED ON DRIVEN POSTS AT A 7 FOOT BOTTOM HEIGHT.

DETOUR NOTES:

A DETOUR ROUTE IS NOT AVAILABLE FOR THE PROJECT LOCATION.

SHEET 3 OF

PINCUSHION TRAILS BED AND BREAKFEST

TO MAPLE HILL

LYNN'S LOOP

JUNCTION O

NORTH ADVANCED 3

UPPER SNOWMAN

NORTH ADVANCED

2.72 MILES TO

BRIDGE FROM

JUNCTION D

HILFIKER HILL

DEVILS TRACK NORDIC SKI SHOP

OLE HYVAA

LOWER SNOWMAN 21025E SNOW

NORTH ADVANCED

JUNCTION E

BRIDGE #1

(17 TON CAPACITY)

PINCUSHION

MOUNTAIN

LOOP

JUNCTION B

JUNCTION A JUNCTION D

WEST OVERLOOK JUNCTION C

BRIDGE #7

(15 TON CAPACITY)

3K CUT OFF

NORTH COUNTRY

NATIONAL SCENIC TRAIL 3

PROJECT

LOCATION

(2) TYPE III BARRICADES, LIGHTED

AT EACH END OF WORK ZONE

JUNCTION F

SUPERIOR

HIKING TRAIL

BRIDGE #3

(XX TON CAPACITY)

21025E SNOW

PINCUSHION TRAIL HEAD

6.0' LANE

7.0' LANE

EX GRADE

5.13'

EXISTING ℄ GRADE

10.25'

5.13' NOM. 3"x12"

TIMBER DECKING

61" x 161" TIMBER

2 2

EX BASE - GRAVEL/ SILTY SAND

EXISTING TYPICAL SECTION (STA 9+20 - STA 9+90)

SCALE: NTS

3.0' 3.0' 3.0'

EXISTING BRIDGE SECTION

SCALE: 1" = 2'

13.0' DECK O-O

STRINGERS

6.0'

12.0' CLEAR

ROADWAY

6"x6" TIMBER CURB

EX GRADE

EX BASE - GRAVEL/ SILTY SAND

PROPOSED ℄ GRADE 3"x6" TIMBER SCUPPER

12" THICK

LONGITUDINAL

DOWEL-LAM DECK

WITH SHIPLAP JOINTS

EXISTING TYPICAL SECTION (STA 10+10 - STA 11+00)

SCALE: NTS

PROPOSED BRIDGE SECTION

13.7' PAY LIMITS OF AGGREGATE BASE,

GRADING D, COMPACTION METHOD B

12.0'

SEEDING, DRY METHOD

PLAN GRADE

ROLLED EROSION CONTROL PRODUCT, TYPE 2.D WITH NATURAL NETTING

(TYP)

PLACING CONSERVED TOPSOIL, 3-INCH (TYP)

EMBANKMENT, CIP

TYPICAL

SECTIONS

CLEARING AND GRUBBING,

DISPOSAL METHOD A

(ONLY MINIMUM AS REQUIRED

FOR CONSTRUCTION, TYP.)

AGGREGATE BASE,

GRADING D, COMPACTION

METHOD B

(6")

EXISTING

GROUND

6"

(AVERAGE)

SPILLWAY,

SAME WIDTH

AS DITCH BOTTOM

RIPRAP, CLASS 0,

MACHINE PLACED

(INCIDENTAL)

PROPOSED TYPICAL SECTION (STA 9+20 - STA 9+85.25)

13.1' PAY LIMITS OF AGGREGATE BASE,

GRADING D, COMPACTION METHOD B

12.0'

SEEDING, DRY METHOD

ROLLED EROSION CONTROL PRODUCT, TYPE 2.D WITH NATURAL NETTING

18"

DISPOSAL METHOD A

(ONLY MINIMUM AS REQUIRED

FOR CONSTRUCTION, TYP.)

ROADWAY EXCAVATION,

1.0'

6.0' 6.0'

PLAN GRADE

PLACING CONSERVED TOPSOIL, 3-INCH (TYP)

EXISTING

GROUND

DITCH BOTTOM

1'-0" MIN.

1'-0" MIN.

FLOW

COMPACTION METHOD B GRADING D, COMPACTION

METHOD B

(6")

SIDE VIEW SHOWING CHECK DAM

SHEET 4 OF

PROPOSED TYPICAL SECTION (STA 10+14.75 - STA 11+00)

SCALE: NTS

PROPOSED CHECK DAM DETAIL

SCALE: NTS

(VAR.)

29.50'

CP

HORIZONTAL AND VERTICAL CONTROL LEGEND

POINT

LOCATION

STA / OFFSET NORTHING EASTING

ELEVATION DESCRIPTION

GSOC

BENCHMARK

CONTROL POINT

BM1 9+65.27 / 17.52' LT 804748.6691 3313865.6105 1009.32 BM NAIL IN 10" FIR GOPHER STATE ONE CALL RIGHT OF WAY

TREE LINE

REFERENCE POINTS

LOCATION

RIPRAP

EDGE OF GRAVEL

EDGE OF BIT

SILT SOCK

AGGREGATE BASE (6" DEPTH)

CP2

PROPERTY OWNER:

P.O.B.

REF PT "C"

12'

PROPOSED RIPRAP, CLASS

II, MACHINE PLACED (TYP)

BM1

13 13

12'

EXISTING TRAIL

DISPOSAL METHOD A (TYP)

PROPOSED SLOPE STAKE LINE

P.O.E.

REF PT "D"

PC STA = 8+13.48

SURVEY AND

10+00

S86° 22' 06"E

CP3 PC STA = 10+48.86

N = 804730.2439

N = 804756.2760 E = 3313712.3241

PI STA = 8+62.18

N = 804764.2772 E = 3313760.3612

PT STA = 9+09.02

N = 804749.2985

E = 3313806.6994 = 27.37

R = 200.00' T = 48.70' L = 95.54'

CONSTRUCTION ℄

PROPOSED

AGGREGATE BASE,

GRADING D,

COMPACTION METHOD B

SILT SOCK (TYP)

PC STA = 9+66.37

N = 804731.6593

E = 3313861.2681

PI STA = 9+75.86

N = 804728.7404 E = 3313870.2980

PT STA = 9+85.25

N = 804728.1393

E = 3313879.7689 = 14.28 R = 75.75'

REF PT "A" REF PT "B"

EXISTING STRUCTURE 54

(TO BE REMOVED)

EXISTING TREE LINE

EXISTING EDGE OF

WATER

PC STA = 10+14.75

N = 804726.2706 E = 3313909.2123

PI STA = 10+24.21

N = 804725.6712 E = 3313918.6554

PT STA = 10+33.58

N = 804727.4199 E = 3313927.9546 = 14.28

EXISTING TREE LINE

NATIONAL FOREST

E = 3313942.9722

PI STA = 11+22.97

N = 804743.9400 E = 3314015.8050

PT STA = 11+95.41

N = 804730.6346 E = 3314088.7102

= 20.99 R = 400.00' T = 74.11' L = 146.56'

PLAN OF SITE

T = 9.49' L = 18.88'

R = 75.53' T = 9.46' L = 18.83'

SOIL EROSION CONTROL REQUIREMENTS

KEY DETAIL CHARACTERISTICS

GENERAL NOTES:

1. INSTALL THE SPECIFIED QUANTITY OF ROLLED EROSION CONTROL PRODUCT (EMAT)

AND THEN ANY ADDITIONAL AREAS THAT ARE DISTURBED BY THE CONTRACTOR SHALL

BE SEEDED UNDER THE LUMP SUM PAY ITEM.

2. COORDINATE SYSTEM REFERS TO NAD83 MINNESOTA STATE PLANES, NORTH ZONE.

DATUM REFERS TO NAVD88.

3. REFERENCE POINTS "A" AND "B" REFER TO FINISH GRADE AT CENTERLINE AT THE ENDS

OF THE PROPOSED BRIDGE SLAB.

4. PROVIDE SMOOTH TRANSITION FROM EXISTING TO PROPOSED TRAIL AT REFERENCE

GENERAL PLAN OF SITE

6 SEEDING WITH

MATTING

14 AGGREGATE COVER

37 CHECK DAM

POINTS "C" AND "D". FADE OR EXTEND PROFILE SLIGHTLY AS REQUIRED.

5. SURVEY WAS COMPLETED BY UPEA FOR THIS PROJECT ON 11-8-2022.

6. ALL TREE REMOVAL TO BE INCIDENTAL TO CLEARING AND GRUBBING, DISPOSAL

METHOD A.

PROJECT NO.

U28-02592

SHEET 5 OF

0 10

REBAR WITH CAP

REBAR WITH CAP 1015.0

804739.2629 8+94.08 / 14.50' RT

FILTERS AND DETAINS RUNOFF. SILT SOCK

CAN BE CONSTRUCTED ACROSS DITCHES OR ANY AREA

OF CONCENTRATED FLOW. A CHECK DAM IS INTENDED TO

REDUCE WATER VELOCITIES AND CAPTURE SEDIMENT.

A CHECK DAM IS NOT A FILTERING DEVICE.

STABILIZES SOIL SURFACE THUS MINIMIZING EROSION.

PERMITS CONSTRUCTION TRAFFIC IN ADVERSE

WEATHER. MAY BE USED AS PART OF PERMANENT BASE

CONSTRUCTION OF PAVED AREAS.

USED WHERE VEGETATION IS NOT EASILY ESTABLISHED.

EFFECTIVE FOR HIGH VELOCITIES OR HIGH

CONCENTRATIONS. PERMITS RUNOFF TO INFILTRATE

SOIL. DISSIPATES ENERGY FLOW AT SYSTEM OUTLETS.

RIPRAP, RUBBLE,

GABIONS

FACILITATES ESTABLISHMENT OF VEGETATIVE COVER.

EFFECTIVE FOR DRAINAGEWAYS WITH LOW VELOCITY.

EASILY PLACED IN SMALL QUANTITIES BY INEXPERIENCED

PERSONNEL. SHOULD INCLUDE PREPARED TOPSOIL BED.

EROSION MAT WITH NETTING IS PROHIBITED.

PROPOSED

STRUCTURE

STA. 10+00

P T:

+8

5.

P C

: 1 0+

.7

3313788.9085

CP

10+87.13 / 10.75' RT 804724.8012 3313981.8308 1012.8

Feet PROPOSED EXISTING

POINT STATION NORTHING EASTING ELEVATION

A 9+85.25 804728.1393 3313879.7689 1008.60 B 10+14.75 804726.2708 3313909.2096 1008.46 C 9+20.00 804745.9204 3313817.1498 1013.25 D 11+00.00 804736.4611 3313993.7007 1012.36

1018 1018

1017 1017

HIGH PT STA: 11+00.00

HIGH PT ELEV: 1012.36

PVI STA: 10+80.82

PVI ELEV: 1012.17

G.C.: -7.33% K: 5.23

LVC: 38.29

REF PT "C"

P.O.B.

MATCH EXISTING

PROPOSED ROAD PROFILE AT CL

EXISTING ROAD PROFILE AT CL

LOW PT STA: 9+85.26

LOW PT ELEV: 1008.60

PVI STA: 9+75.16

PVI ELEV: 1008.65

G.C.: 7.84% K: 2.57

LVC: 20.16

REF PT "A"

LOW PT STA: 10+17.04

LOW PT ELEV: 1008.45

PVI STA: 10+34.99

PVI ELEV: 1008.35

G.C.: 8.83% K: 4.58

LVC: 40.42

6"x6"x29'-6" TIMBER CURB

3"x6"x5'-11" SCUPPER

(TYP.)

REF PT "B"

REF PT "D"

P.O.E.

MATCH EXISTING

PROP. LOW CHORD = 1007.36'

26.00' CHANNEL

PROFILE OF SITE

EXISTING BRIDGE (TO BE REMOVED):

18.16 FOOT (OVERALL LENGTH) SINGLE SPAN

TIMBER GIRDER MULTIPURPOSE TRAIL

BRIDGE.

PROPOSED BRIDGE, CL STA 10+00:

29.5 FOOT (OVERALL LENGTH) SINGLE SPAN,

DOWEL-LAM SLAB BRIDGE WITH TIMBER CRIB

FOUNDATIONS.

1003.10

Q100 WSE = 1004.36'

OBS WSE = 1003.60'

11-8-2022

STREAM BED

EL 1003.16' (+/-)

1002.96

GENERAL PROFILE

0 10 20

Feet (HORIZONTAL)

EXISTING PROFILE ELEVATION AT CL

PROPOSED PROFILE ELEVATION AT CL

0 1 2

Feet (VERTICAL)

SHEET 6 OF

8+75 9+00 9+50 10+00 10+50 11+00 11+25

.0

.1

.8

.6

.7

.5

B V

C S

: 9 +6

B

V C

E : 1

9.

.8

.8

E V

C S

: 9 +8

E

C

E : 1

8.

.5

.1

B V

C S

: 1 0+

.7

B

V C

E : 1

8.

.5

.9

.6

.0

E V

C S

: 1 0+

.1

E

V C

E : 1

0.

C S

: 1 0+

.7

B

V C

E : 1

0.

.5

.1

.3

.3

E V

C S

: 1 1+

.0

E

V C

E : 1

2.

.7

GSOC

GOPHER STATE ONE CALL

BM1

EXISTING EDGE OF WATER

A

C-08

PROPOSED RIPRAP, CLASS

CLEARING AND

GRUBBING, DISPOSAL

METHOD A (TYP)

SILT SOCK

0 4 8

PROPOSED

CHECK DAM (TYP)

Feet

II, MACHINE PLACED (TYP)

7'-0"

5'-0"

C-09

26'-0"

2'-6"

PROPOSED SLOPE STAKE LINE

WEIGHT LIMITS

SIGN (R12-1)

(17 TON)

OBJECT MARKERS, CARSONITE,

HIGH INTENSITY REFLECTIVITY

REF PT "A"

STA: 9+85.25

(END OF SLAB)

CONSTRUCTION CENTERLINE

SURVEY CENTERLINE

WEIGHT LIMITS

SIGN (R12-1)

90°

13'-0"

DECK

O-O

12'-0"

CLEAR

STRUCTURE

STA. 10+00

10+00

S86° 22' 06"E 29.50'

OBJECT MARKERS,

CARSONITE, HIGH

INTENSITY

REFLECTIVITY

REF PT "B"

STA: 10+14.75

(END OF SLAB)

12'-0"

AGGREGATE BASE,

GRADING D,

COMPACTION

REPLACEMENT @ MP 2.143

(17 TON)

PROPOSED

AGGREGATE BASE,

GRADING D,

COMPACTION

OBJECT MARKERS,

CARSONITE, HIGH

INTENSITY

REFLECTIVITY

EXISTING STRUCTURE

(TO BE REMOVED)

PROPOSED RIPRAP, CLASS II,

MACHINE PLACED (TYP)

SILT SOCK (TYP)

EXISTING EDGE OF WATER

CLEARING AND

GRUBBING, DISPOSAL

METHOD A (TYP)

PROPOSED GRADE

BRIDGE PLAN

TREATED STRUCTURAL

6"x6"x29'-6" TIMBER CURB 3"x6"x5'-11" SCUPPER

NOTE:

1. DOWEL-LAM SLAB DECK, SPREADER BEAMS, CURB, SCUPPER, AND

ALL HARDWARE TO BE INCLUDED WITH: TREATED STRUCTURAL

TIMBER, SUPERSTRUCTURE.

2. TIMBER SILL, CRIBBING, AND ALL ASSOCIATED HARDWARE TO BE

INCLUDED WITH: TREATED STRUCTURAL TIMBER, SUBSTRUCTURE.

3. CRIBBING SHALL BE FILLED WITH RIPRAP, CLASS 0, MACHINE PLACED.

ABUT "A"

1006.60

NOTE: FOR RIPRAP ALONG SIDES OF

CHANNEL, EXCAVATE EXISTING SOILS

DOWN TO PROPOSED BOTTOM OF RIPRAP.

RIPRAP DEPTH MAY BE REDUCED IF

BEDROCK IS ENCOUNTERED.

PER PLAN

PLAN OF

1010 TIMBER, SUPERSTRUCTURE 2 (TYP.) ABUT "B" 1'-0" EXISTING DESIGNER DWG SHEET NO.

GRADING D,

COMPACTION METHOD B

(6")

STA. 9+72

1.5

LIMITS OF:

REF PT "A" REF PT "B"

STRUCTURE EXCAVATION

STA. 10+28

AGGREGATE BASE, GRADING D,

COMPACTION METHOD B

(6")

1006.45

1'-9"

FLAT GROUND

2 AT TOE

STRUCTURE EXCAVATION

AND STRUCTURAL BACKFILL

1003.10 5'-0"

(TYP.)

RIPRAP, CLASS II,

MACHINE PLACED

STREAM BED

EL 1003.16' (+/-)

Q100 WSE = 1004.36'

OBS WSE = 1003.60'

11-8-2022

1.5

1002.96

TREATED STRUCTURAL

TIMBER, SUBSTRUCTURE

PROP. LOW CHORD = 1007.36'

RIPRAP, CLASS

II, MACHINE

PLACED

2'-9"

SHEET 7 OF

BRIDGE ELEVATION RIPRAP DETAIL

SCALE: NTS

U28-02592

P T:

+8

P C

: 1 0+

.7

12'-0" CLEAR ROADWAY

6'-0" 6'-0"

BRIDGE DECK

3/4"Ø X 20" HD. DR. SPIKE

(8" EMBED)

3/4"Ø X 20" HD. DR. SPIKE

(8" EMBED)

GEOTEXTILE, TYPE III, CLASS I

(BACK FACE OF SILL AND CRIBBING ONLY)

4'-6"

2'-3"

2'-3"

REF. PT. 'A' & 'B'

TIMBER SILL

TIMBER BLOCK

ATTACH THE SILL TO EACH MEMBER IN THE

TOP ROW OF THE TRANSVERSE CRIBBING

WITH 3/4"Ø x 16" DRIFT PIN

CRIBBING SHALL BE FILLED

WITH RIPRAP, CLASS 0,

MACHINE PLACED

SOLID ROUGH SAWN TIMBER

(6" x 6" x 18')

SOLID ROUGH SAWN TIMBER

(6" x 6" x 30") 11/16"Ø HOLE IN ALL 6" x 6"

CRIBBING FOR #6 GALVANIZED

REPLACEMENT @ MP 2.143

4'-0" 2'-0" 2'-0" 1'-0" 1'-0" 2'-0" 2'-0" 4'-0" 3" x 12" ACROSS FULL WIDTH OF

TIMBER FOUNDATION (TYP.) 2'-6"

COATED REBAR AT ALL

CRIBBING INTERSECTIONS

18'-0" (1) 3/4"Ø x 7" DM. HD. DR. SPIKE

@ EACH BLOCK (TYP.)

4'-6" SUPERIOR

NATIONAL FOREST

TIMBER CRIBBING ABUTMENT PLAN

SCALE: NTS

TIMBER CRIBBING ABUTMENT SECTION A-A

TRAIL SIDE

SLOPE

10" x 10" x 1'-6" TIMBER BLOCK

(2) 3/4"Ø x 16" DM. HD. DR. SPIKE

@ EACH BLOCK

12" x 12" x 18' TIMBER SILL

ABUTMENT PLAN &

ELEVATION

REBAR

EMBED. 4"

(36) 3/4"Ø x 7" DM. HD. DR. SPIKE @ EACH TRANSVERSE ROUGH SAWN 6" x 6" TIMBER

TRANSVERSE CRIBBING @ 2'-0" MAXIMUM (EQUAL SPA. @ 1'-9" = 17'-6")

18'-0"

TIMBER CRIBBING ABUTMENT ELEVATION

SCALE: NTS (NORMAL TO FRONT FACE)

TRAIL SIDE SLOPE

ROUGH SAWN 6"x6" TIMBER

CRIBBING SHALL BE FILLED WITH

RIPRAP, CLASS 0, MACHINE PLACED

(HAND TAMP RIPRAP FILL IN

CONJUNCTION WITH CONSTRICTION

OF CRIBBING IN APPROX. 6" LIFTS

LONGITUDINAL CRIBBING

3" x 12" ACROSS FULL WIDTH OF

TIMBER FOUNDATION

11/16"Ø HOLE IN ALL 6" x 6"

CRIBBING FOR #6 GALVANIZED

COATED REBAR AT ALL

CRIBBING INTERSECTIONS

(1) 3/4"Ø x 7" DM. HD. DR. SPIKE

@ EACH BLOCK

NOTES:

1. TIMBER SILL, CRIBBING, ALL ASSOCIATED HARDWARE, AND STEEL

REINFORCEMENT TO BE INCLUDED WITH: TREATED STRUCTURAL TIMBER,

SUBSTRUCTURE.

2. CONSTRUCT TIMBER CRIBBING WITH 6" x 6" ROUGH SAWN TREATED

TIMBERS. FIELD DRILLED HOLES SHALL BE TREATED WITH COPPER

NAPTHENATE.

3. THE ENGINEER MUST APPROVE THE SUBGRADE PRIOR TO INSTALLATION

OF THE TIMBER CRIBBING.

4. THE TOTAL WEIGHT OF GALVANIZED COATED #6 BARS IS 287 POUNDS

(INCLUDES BOTH ABUTMENTS).

SHEET 8 OF

"X

TI

M

BE

R

S

IL

L 3'

-6 " T

IM

B

E R

C R

IB

BI

N G

"X

TI

M

BE

R

SI

LL

3' -6

" T

IM

B E

R C

R

IB

BI

N

G

2 2 2 2

4'-6" PANEL "A"

13'-0" OUT TO OUT DECK

4'-0" PANEL "C"

4'-6" PANEL "B"

3/4" EYEBOLTS ARE IN PLACE ON PANEL @ SPREADER

BEAM LOCATIONS WHEN SHIPPED & ARE USED FOR

4"

SPLICE

4"

SPLICE

LIFTING & PLACING PANELS ON THE BRIDGE. REMOVE

EYEBOLTS & REPLACE WITH 3/4" x 22" DM. HD. BOLTS WITH

(1) 3"x3"x5/16" ⅊ WASHER & (1) 3/4" LOCK NUT PER BOLT, 3/4"x20" DM. HD. DR. SPK.

1 DECK TO CAP, (TYP.)

FLAT

FLAT

6"x6" CURB, S1S1E 3"x6" SCUPPER, S1S1E

SHOP

DRILL

5/8"Ø x 11" DM. HD. DR.

SPK. @ PANEL SHIPLAP

JOINT, (TYP.) 1

FIELD DRILL 2

AFTER SPREADER BEAM HAS BEEN FIELD DRILLED 1 3 United States Department of Agriculture

1'-6"

1'-0"

1'-6"

12" x 12"

TIMBER SILL

8"

3 SPA @ 12" = 3'-0"

6" 3 SPA @ 12" = 3'-0" 6"

6" 6"

3 SPA @ 12" = 3'-0" 6"

4" x 12" FLOORING, S1S

6" x 8" x 12'

SPREADER BEAM

SECTION THRU DECK AT ABUTMENT

6"x6" CURB, S1S1E, SECTION THRU DECK AT SPREADER BEAM

Ø4"

Ø7/8" (MIN.)

SAE 1010 HOT-ROLLED CARBON

STEEL (SAE J412)

± 5/16" THICK

PINCUSHION MOUNTAIN

4"Ø SPLIT RINGS, CURB

TO SCUPPER, SCUPPER

TO DECK, SHOP DRILL

CURB & SCUPPER,

FIELD DRILL DECK

SHOP DRILL

3"x6" SCUPPER, S1S1E, SHOP DRILL

9" NELSON 8"

COMPOSITE

SHIMS FULL

WIDTH OF BOARD

12" DECK

CURBS ARE TO BE PLACED

SO TAGS SHOW FROM ℄ OF

ROADWAY. MATCH CURBS

& SCUPPERS PER SHOP

PLACED TAG NUMBERS

4"Ø WASHER

TAGS

3/4"x23" DM. HD. BOLT (A449) WITH (1) 4"x4"x5/16" ⅊ WASHER

(UNDER NUT) & (1) 4"Ø WASHER

(UNDER HEAD) PER BOLT, CURB

TO DECK, FIELD DRILL DECK 4

4"Ø SPLIT RING

CONNECTORS

NELSON 8"

6" COMPOSITE

SHIMS (TYP)

A #8x 1 1/2"

SPREADER

6"x6" CURB, S1S1E

3"x6"x3'-0" SCUPPER, S1S1E (TYP.)

STRUCTURE DETAILS

3/4"x22" DM. HD. BOLT (A449) WITH (1) COATED DECK BEAM NOTE: 6" 8" 8" 6" 4"x4"x5/16" ⅊ WASHER (UNDER NUT) & (1)

4"Ø WASHER (UNDER HEAD) PER BOLT,

CURB TO DECK, FIELD DRILL DECK 4

SCREW (TYP) CONTRACTOR IS TO ASSEMBLE CURB & SCUPPER IN PLACE,

MARK & DRILL THRU DECK, DISASSEMBLE, GROOVE DECK FOR

SPLIT RINGS, REASSEMBLE & BOLT DOWN.

SECTION AT CURB

SCALE: NTS

SHIMMING DETAIL

SCALE: NTS

CURB & SCUPPER ASSEMBLY (A-A)

NOTES:

7'-41"

29'-6"

1 ALL HARDWARE PENETRATING THE TOP OR BOTTOM EDGE OF THE DECK PLANK SHALL PASS THROUGH THE CENTER OF THAT

DIMENSION.

2 FIELD DRILLED HOLES IN THE LOWER SPLICE BLOCK OF EACH PANEL ARE TO BE DRILLED COMPLETELY THROUGH THE BLOCK TO

PREVENT SPLITTING WHEN INSTALLING THE 5/8" DRIVE SPIKES.

3 THE CONTRACTOR SHALL INSTALL NELSON 8" COMPOSITE SHIMS OR EQUAL (SUPPLIED BY BRIDGE MANUFACTURER) IN ALL

LOCATIONS WHERE THE TOP OF THE SPREADER BEAM DOES NOT CONTACT THE BOTTOM OF THE DECK PANEL UPON TIGHTENING TO ENSURE SNUG FIT ACROSS ENTIRE DECK WIDTH. THE CONTRACTOR SHALL RE-TIGHTEN ALL NUTS ON THE LAST DAY OF CONSTRUCTION IN THE PRESENCE OF THE ENGINEER TO ENSURE ALL NUTS ARE PROPERLY TIGHTENED. SET THREADS ON ALL

BOLTS AT NUT WITH A CENTER PUNCH AFTER TIGHTENING.

4 HIGH STRENGTH (A449) DOME HEAD BOLTS DO NOT HAVE FINS UNDER THE HEAD AT THE SHANK.

5/8"Ø x 11" DM. HD. DR. SPK.

@ 24" SPA. (TYP. @ SHIPLAP JT.)

ALL TIMBER AND HARDWARE SHOWN SHALL BE PAID FOR AS: TREATED STRUCTURAL TIMBER, SUPERSTRUCTURE.

CONTRACTOR SHOULD BE AWARE OF THE POTENTIAL TO HIT THE R.S. NAILS IN THE PREFABRICATED DECK PANELS WHEN INSTALLING THE CURB BOLTS FOR THE CURB & SCUPPER ATTACHMENT. A 3/4" HOLE SAW IS RECOMMENDED IN DRILLING

THROUGH THE R.S. NAILS FOR THIS ATTACHMENT.

BRIDGE PLAN

SHEET 9 OF

ABBREVIATIONS (PLAN):

R12-1 SIGN

SIGNS, TYPE III SHEETING

WEIGHT

LIMIT

TONS

1'-3"

6'-6"

LPSM - LUMP SUM

LNFT - LINEAR FEET

CUYD - CUBIC YARD

SQYD - SQUARE YARD

EA - EACH

LBS - POUNDS

EX - EXISTING

PROP - PROPOSED

NTS - NOT TO SCALE

TYP - TYPICAL

CL - CENTER LINE

CIP - COMPACTED IN PLACE

P.O.B. - POINT OF BEGINNING

P.O.E. - POINT OF ENDING

REF PT - REFERENCE POINT

OHWM - ORDINARY HIGH WATER MARK

OBS WSE - OBSERVED WATER SURFACE ELEVATION

Q100 WSE - 100 YEAR FLOOD WATER SURFACE ELEVATION

F.F. - FRONT FACE

B.F. - BACK FACE

SPA - SPACES

ABUT - ABUTMENT

PL - PLATE

GALV - GALVANIZED

U.N.O. - UNLESS NOTED OTHERWISE

QUANTITIES &

MISCELLANEOUS

POST, STEEL, 3 LB

(10 FEET)

(MAX.)

5'-3"

37"

DETAILS

EXISTING GROUND

42" (MIN.)

2'-2"

INSIDE EDGE OF

BRIDGE RAIL OR

TRAVEL WAY

CARSONITE

TOP OF

STRUCTURE/

GRND

6'-0"

2'-2"

1'-4"

BEGIN/END

TOP OF ROAD

2'-0"

SHEET 10 OF

STEEL POST SIGN DETAIL

SCALE: NTS

OBJECT MARKER

SCALE: NTS

U28-02592

SUMMARY OF PROJECT QUANTITIES

ITEM NO. DESCRIPTION UNITS QUANTITY

15101 MOBILIZATION LPSM 1

15201 CONSTRUCTION SURVEY AND STAKING, METHOD 1, TOLERANCE CLASS C LPSM 1

15702 SILT SOCK LNFT 180

15711 CHECK DAMS EACH 5

20102 CLEARING AND GRUBBING, DISPOSAL METHOD A ACRE 0.01

20304 REMOVAL OF OLD STRUCTURE, DISPOSAL METHOD A LPSM 1

20401 ROADWAY EXCAVATION, COMPACTION METHOD B CUYD 25

20411 EMBANKMENT, CIP CUYD 8

20801 STRUCTURE EXCAVATION CUYD 105

20803 STRUCTURAL BACKFILL CUYD 58

25101 RIPRAP, CLASS 0, MACHINE PLACED CUYD 5

25101.1 RIPRAP, CLASS II, MACHINE PLACED CUYD 23

25116 GEOTEXTILE, TYPE III, CLASS I SQYD 26

30103 AGGREGATE BASE, GRADING D, COMPACTION METHOD B CUYD 38

55704 TREATED STRUCTURAL TIMBER, SUPERSTRUCTURE LPSM 1

55706 TREATED STRUCTURAL TIMBER, SUBSTRUCTURE LPSM 1

62403 PLACING CONSERVED TOPSOIL, 3-INCH SQYD 139

62503 SEEDING, DRY METHOD LPSM 1

62901 ROLLED EROSION CONTROL PRODUCT, TYPE 2.D WITH NATURAL NETTING SQYD 139

63301 SIGNS, TYPE III SHEETING SQFT 3

63306 POST, STEEL, 3 LB LNFT 20

63307 OBJECT MARKERS, CARSONITE, HIGH INTENSITY REFLECTIVITY EACH 4

63501 TEMPORARY TRAFFIC CONTROL LPSM 1

United States Department of Agriculture Forest Service
PROJECT SITE
PROJECT LOCATION
DESIGN DATA:
HYDRAULIC DATA:
GENERAL NOTES:
GENERAL NOTES:
SPECIFICATIONS:
CONSTRUCTION NOTES:
EASTERN REGION
GUNFLINT
C.SMITH
J.ALLEN
G.JUNTTILA
U28-02592
1
2
EASTERN REGION
GUNFLINT
TRAFFIC CONTROL PLAN KEY
DETOUR NOTES:
C.SMITH
J.ALLEN
G.JUNTTILA
U28-02592
EXISTING TYPICAL SECTION (STA 9+20 - STA 9+90)
EXISTING BRIDGE SECTION
EASTERN REGION
EXISTING TYPICAL SECTION (STA 10+10 - STA 11+00)
PROPOSED BRIDGE SECTION
RANGER DISTRICT
PROPOSED TYPICAL SECTION (STA 9+20 - STA 9+85.25)
C.SMITH
J.ALLEN
G.JUNTTILA
PROPOSED TYPICAL SECTION (STA 10+14.75 - STA 11+00)
PROPOSED CHECK DAM DETAIL
U28-02592
GSOC
EASTERN REGION
GUNFLINT
SOIL EROSION CONTROL REQUIREMENTS
GENERAL NOTES:
GENERAL PLAN OF SITE
C.SMITH
J.ALLEN
G.JUNTTILA
U28-02592
EASTERN REGION
GUNFLINT
GENERAL PROFILE
C.SMITH
J.ALLEN
G.JUNTTILA
U28-02592
A
B
EASTERN REGION
GUNFLINT
BRIDGE PLAN
C.SMITH
J.ALLEN
G.JUNTTILA
BRIDGE ELEVATION
U28-02592
EASTERN REGION
TIMBER CRIBBING ABUTMENT PLAN
TIMBER CRIBBING ABUTMENT SECTION A-A
GUNFLINT
A
A

TIMBER CRIBBING ABUTMENT ELEVATION

NOTES:
C.SMITH
J.ALLEN
G.JUNTTILA
U28-02592
EASTERN REGION
SECTION THRU DECK AT ABUTMENT
A
SECTION THRU DECK AT SPREADER BEAM
GUNFLINT
SECTION AT CURB
SHIMMING DETAIL
CURB & SCUPPER ASSEMBLY (A-A)
C.SMITH
J.ALLEN
G.JUNTTILA
BRIDGE PLAN
U28-02592
EASTERN REGION
GUNFLINT
C.SMITH
J.ALLEN
G.JUNTTILA
STEEL POST SIGN DETAIL
OBJECT MARKER
TITLE SHEET:
DESIGN DATA GENERAL NOTES:
TEMPORARY TRAIL CLOSURE:
TYPICAL SECTIONS:
PLAN OF SITE:
PROFILE OF SITE:
PLAN OF STRUCTURE:
ABUTMENT PLAN AND ELEVATION:
STRUCTURE DETAILS:
RIPRAP RUBBLE GABIONS:
SILT SOCK:
FILTERS AND DETAINS RUNOFF:
undefined:
10:
undefined_2:
DESCRIPTION:
MOBILIZATION:
SILT SOCK_2:
CHECK DAMS:
CLEARING AND GRUBBING DISPOSAL METHOD A:
ROADWAY EXCAVATION COMPACTION METHOD B:
EMBANKMENT CIP:
STRUCTURE EXCAVATION:
STRUCTURAL BACKFILL:
RIPRAP CLASS 0 MACHINE PLACED:
RIPRAP CLASS II MACHINE PLACED:
GEOTEXTILE TYPE III CLASS I:
TREATED STRUCTURAL TIMBER SUBSTRUCTURE:
PLACING CONSERVED TOPSOIL 3INCH:
SEEDING DRY METHOD:
SIGNS TYPE III SHEETING:
POST STEEL 3 LB:
TEMPORARY TRAFFIC CONTROL:
undefined_3:
undefined_4:
undefined_5:
Date3_af_date:
2023-06-06T16:13:35-0500
THOMAS HALL
2023-06-07T12:46:30-0500
R9 Regional Office
Jeff Dulka
I am approving this document
2023-06-07T13:59:02-0500
JOSIAH KIM

File details come from the government source that posted it. Updated .