11-004 Specifications 26001797.pdf
PDF 278 KB Posted
- Solicitation number
- 26001797
- Issued by
- Mason County, Texas
About this file
This is a specifications document for contract 26001797 regarding Paul Davis and T-Bar Well Fields Maintenance services in Texas. The contract encompasses maintenance and installation services for up to 6-inch Boreline and fittings at the T-Bar and Clearwater well fields. Key service requirements include the ability to provide, service, and install Boreline equipment; installation of stainless steel check valves with knockouts on all Boreline wells; use of double-jacketed Boreline wiring; on-site spooling and reeling of Boreline hose; installation of stainless steel pumps for all new T-Bar Clearwater well installations; camera surveying of all pulled wells with jetting upon request; and disinfection of all wells in accordance with AWWA Standards prior to reinstallation.
The specifications contain a critical exclusionary provision prohibiting all vendors from using Franklin pumps or motors for any well field installation. Vendors must sign and include the specifications form with their bid documents; failure to do so will result in the bid being deemed non-responsive and rejected. The document includes fields for vendor contact information, company name, delivery date, phone, fax, e-mail address, date, and authorized signature. No pricing terms, set-asides, incumbent information, award dates, contract term, or renewal options are specified in this document.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor Name:________________
Specifications
For 26001797 Paul Davis and T-Bar Well Fields Maintenance
1. Vendor must be able to provide, service and install up to 6” Boreline & fittings at the T-bar/Clearwater wells
2. All Boreline wells require stainless steel check valves with Knockouts
3. Boreline Wiring must be double Jacketed
4. Vendor must have the ability to spool and reel Boreline hose onsite
5. T-Bar Clearwater wells require any and all new installs must be Stainless pumps
6. All pulled wells are required to be camera surveyed or and upon request if jetted.
7. All wells to be disinfected in accordance with AWWA Standards prior to reinstalling
8. NOTICE: ALL vendors are excluded from the use of Franklin pumps or motors for any well field install.
If this form is not signed and included with your bid documents your bid will be considered non-responsive and will be rejected.
Delivery Date
E-mail Address
Company Name
Date
Authorized Signature
Phone
Print Above Name Fax
File details come from the government source that posted it. Updated .