1-SQPD for Architects - CHHS RHS Building Addition.pdf
PDF 186 KB Posted
- Solicitation number
- 27KP01Q
- Issued by
- Salt Lake County, Utah
About this file
This is a Statement of Qualifications (SOQ) form for architectural design services issued by Jordan School District in Utah. The district is soliciting design services for building additions at Copper Hills High School and Riverton High School, both located in the West Jordan and Riverton areas. The project requires architectural firms to provide comprehensive design services for two separate but similar 3,000 square foot additions to accommodate wrestling programs at each facility. The scope of work includes electrical, mechanical, and structural design, with potential civil and landscape design components, and may include remodel and installation of dance floors in existing spaces at one or both facilities. The design and bidding timeline runs from October 2026 to February 2027, with construction scheduled from March 2027 to August 2027. Interested firms must submit complete SOQ forms with all required sections and attachments, including references from similar K-12 public school projects located in Utah, to be considered for selection.
The total construction budget for this project is $2.8 million. The SOQ form requires firms to provide detailed company information including all Utah office locations and the principal place of business, average number of employees in Utah for the past five years, and three reference projects of similar scope. For each reference project, firms must provide comprehensive cost analysis, schedule analysis in days, and a breakdown of final construction costs by change order. Qualifications will be evaluated based on relevant experience with comparable K-12 public school construction projects in Utah. Any sections left blank or incomplete on the SOQ form may result in rejection of the submittal. This procurement is being conducted by Jordan School District Board of Education to secure design services for both high school facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-27KP01Q Building Additions.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Building Additions - CHHS & RHS
City State Zip Code
Phone Fax Internet Web Page
Contact Name Contact Email
Age of Firm
Address City State Zip Code
Address City State Zip Code
Category:
7905 S. Redwood Road West Jordan, Utah 84088
SQPD FORM FOR ARCHITECTURAL SERVICES
Company Name:
Firms must complete all sections of this form and submit all required attachments to be selected for design services. Any section left blank or incomplete may result in a rejection of your submittal. References should be similar scope of design for K-12 Public School projects located in Utah.
Company Information: Provide the location of all the firm's offices located in Utah, specifically indicating the principal place of business.
Average # of employees for the past five years located in Utah
Additional Place of Business (if applicable)
Additional Place of Business (if applicable)
Address
Client Name: Project Title:
Contact Individual: Phone: Email:
Project Description
Owner's Contractor Final Project Budget Bid Amount Construction Cost
Owner Architect-Engineer Contractor
Schematic Design Contract Documents Bid Construction
Client Name: Project Title:
Contact Individual: Phone: Email:
Project Description
Owner's Contractor Final Project Budget Bid Amount Construction Cost
Owner Architect-Engineer Contractor
Schematic Design Contract Documents Bid Construction
Client Name: Project Title:
Contact Individual: Phone: Email:
Project Description
Owner's Contractor Final Project Budget Bid Amount Construction Cost
Owner Architect-Engineer Contractor
Schematic Design Contract Documents Bid Construction
Finish Date (mm/dd/yy)
Finish Date (mm/dd/yy)Project Start Date (mm/dd/yy)
REFERENCE PROJECT #1
COST ANALYSIS
SCHEDULE ANALYSIS (# OF DAYS)
REFERENCE PROJECT #2
Break out of Final Construction Costs by Change Order Requestor:
Project Start Date (mm/dd/yy)
COST ANALYSIS
SCHEDULE ANALYSIS (# OF DAYS)
Break out of Final Construction Costs by Change Order Requestor:
REFERENCE PROJECT #3
Project Start Date (mm/dd/yy) Finish Date (mm/dd/yy)
COST ANALYSIS
SCHEDULE ANALYSIS (# OF DAYS)
Break out of Final Construction Costs by Change Order Requestor:
Sheet1
| Category: |
| Phone: |
| Fax: |
| Internet Web Page: |
| Contact Name: |
| Contact Email: |
| Individual: |
| Phone_2: |
| Email: |
| Description: |
| Project Start Date mmddyy: |
| Finish Date mmddyy: |
| Project Budget: |
| Bid Amount: |
| Construction Cost: |
| Owner: |
| ArchitectEngineer: |
| Contractor: |
| Individual_2: |
| Phone_3: |
| Email_2: |
| Description_2: |
| Project Start Date mmddyy_2: |
| Finish Date mmddyy_2: |
| Project Budget_2: |
| Bid Amount_2: |
| Construction Cost_2: |
| Owner_2: |
| ArchitectEngineer_2: |
| Contractor_2: |
| Individual_3: |
| Phone_4: |
| Email_3: |
| Description_3: |
| Project Start Date mmddyy_3: |
| Finish Date mmddyy_3: |
| Project Budget_3: |
| Bid Amount_3: |
| Construction Cost_3: |
| Owner_3: |
| ArchitectEngineer_3: |
| Contractor_3: |
| Company Name: |
| Address: |
| City: |
| State: |
| Zip: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Years: |
| Text9: |
| Text10: |
| Text11: |
| Text12: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text13: |
| Text14: |
| Text13-2: |
| Text14-2: |
| Text13-3: |
| Text14-3: |
| Text15-2: |
| Text16-2: |
| Text17-2: |
| Text18-2: |
| Text19-2: |
| Text15-3: |
| Text16-3: |
| Text17-3: |
| Text18-3: |
| Text19-3: |
| # Employees: |
File details come from the government source that posted it. Updated .