This document is a general specifications guide for the NBIP (Neighborhood Building Improvement Program) administered by Housing Stability in Salt Lake City, Utah, detailing construction standards and requirements for residential property improvements. The specifications establish comprehensive requirements for concrete work, roofing, exterior finishes, electrical installations, lighting, and signage across multiple work categories. Key project requirements include concrete flatwork with minimum 4-inch thickness and 2% drainage slope, shingle roof tear-offs with 30-year architectural shingles, TPO roofing systems with 60-mil membrane and 15-year warranties, fiber cement or vinyl siding installation, stucco application with three-coat systems, and steel railing installation. All work must comply with current Utah State Construction Codes, Salt Lake City ordinances, International Building Code standards, and EPA regulations. Contractors must schedule work between 8:00 AM and 6:00 PM Monday through Friday, provide 12-hour notice before arrival, obtain all necessary permits, and coordinate inspections with the Building Official. The specifications address specific work items including foundation re-plastering, brick repointing, exterior painting with proper surface preparation, window and door installations to AAMA standards, rain gutter systems, electrical outlet replacements and new installations, and exterior lighting fixtures.

The specifications emphasize material quality and workmanship standards, requiring all materials to be new and installed per manufacturer specifications. Concrete pours require notification 24 hours in advance for Division inspection, with specific ready-mix concrete classes specified based on seasonal requirements (Class 4000 with 6.5-bag or 7.5-bag mixes depending on season). Roofing work requires manufacturer certification for TPO installations and includes provisions for ice and water shields, proper flashing, and debris cleanup. Exterior paint work requires Division notification before second coat application, with provisions for additional coats if needed to eliminate bleed-through at owner expense if paint colors are incompatible. Windows must be double-paned insulated glass with screens included, installed per AAMA standards with proper shimming, leveling, and sealing. All exterior improvements include landscape restoration requirements limited to filling, raking, reseeding, and reinstallation of soft landscaping. The project budget is $63,589.00 or less, located at 734 W 1355 S, Salt Lake City, Utah 84104, with work consisting of building a new entryway with ramp, deck and trellis, replacing the entry door, removing and replacing a window with a sliding glass door, and installing signage.

View the file

Other files

File Type Posted
2-Aztec plan final.pdf PDF
3-Project Manual - NBIP FY26 Aztek Auto - HND26052.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NBIP General Specifications

Housing Stability 451 South State Street, Room 445, Salt Lake City, UT 84114 Page 1 of 13

Requirements All materials supplied by the Contractor shall be new and shall be installed in full accordance with the manufacturer's specifications. The Contractor is responsible for determining the quantities needed to complete the specified work.

Where specified, the Owner shall select finish, colors, styles and types of materials from a Contractor-provided selection of pre-mixed, in stock, readily available options which meet the General

Specifications. The Contractor shall obtain the Owner’s choice in writing and shall provide a copy of these written choices to the Division if requested.

Contractors and their Subcontractors shall schedule working hours between 8:00am and 6:00pm

Monday through Friday. Requests to work on weekends and before or after these hours must be approved by the Owner. The Contractor shall give a minimum 12-hour notice to the Owner before arriving for work.

All work shall comply with all applicable codes and regulations. These include the current adopted Utah

State Construction and Fire Codes, the current Salt Lake City Ordinances Title 18 - Building and

Construction, the EPA’s Renovation, Repair and Painting Program, and other applicable codes and regulations. The Contractor shall obtain all permits for the work, schedule the inspections, and make any corrections required by the Building Official.

All work shall comply with the current adopted International Building Code (IBC), International Existing

Building Code (IEBC), International Energy Conservation Code (IECC), Utah State Construction Codes, and local ordinances.

The Contractor is responsible for repairing any property that is damaged in the work area as a result of the work, unless the Contractor could not have foreseen causing the damage.

Performance Requirements Façade systems shall meet structural wind load requirements per ASCE 7, include continuous weather-resistant barriers, and comply with applicable fire resistance requirements.

Landscape Restoration [For use with any exterior work that could affect a landscape. Model after the HomeServe Terms and

Conditions for sewer line replacement:] After the line is repaired or replaced, provide for basic site restoration to the area disturbed by the repair in a neat and professional manner to the standard of care of a plumber who regularly performs residential sewer line repairs. Such restoration is limited to filling, raking, and reseeding of grass, reinstallation of existing soft landscaping and shrubbery and patching of

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 2 of 13 paved surfaces. We cannot guarantee the survival of any living materials disturbed as a result of the repair and will not be responsible for the replacement of any decorative paving, pathways or landscaping features.

CONCRETE

Sub-Grade Prep Demolish and/or haul away the existing concrete or dirt of the new project area specified. Properly excavate and grade for new concrete. All vegetation and plant matter shall be removed from the pour area to 6 inches below sub-grade. Soft, wet, or unstable areas within the pour area shall be removed to

12 inches below sub-grade and filled with granular material and mechanically compacted. Mechanically compact the entire new pour area before pouring. Proper drainage must be maintained away from the building with the same slope for sub-grade as for finished concrete surface.

Gravel Sub-Grade Excavate and remove 4 inches of sub-grade material from the pour area. Additional areas within the sub-grade area that are soft, wet, or unstable shall be removed. The excavated area shall be graded for proper drainage away from all buildings and structural components such as post footings and columns.

The sub-graded area shall be filled with 4 inches of ¾ minus gravel or road-base and be mechanically compacted before placing any reinforcing steel or concrete.

Ready-Mix Concrete The ready-mix concrete shall be Class 4000, APWA Section 03 30 04. This is the same mix required by

Salt Lake City Engineering for public way concrete work (City Mix). The 6.5 bag City Mix [AKA 5200 PSI

AA (AE) UDOT S concrete on a Ready-Mix Concrete delivery ticket] shall be used from March 1st through

October 1st, and the 7.5 bag City Mix shall be used from October 1st through March 1st. Concrete will not be poured between October 1st and March 1st unless approved by the Division and the Owner. The

Contractor shall be responsible to see that the concrete used meets this specification and shall provide copies of the delivery tickets to the Division.

Exterior Flatwork The new concrete shall be a minimum of 4 inches thick. Proper drainage must be maintained away from the building with a minimum slope of 2% (1/4 inch per foot). A landing outside a door or at the foot of a stairway shall have a maximum slope of 2% (1/4 inch per foot).

Expansion board shall be placed against abutting concrete and tooled or saw-cut control joints shall be placed no more than 8 feet apart. For pours less than 8 feet in width, place control joints the same distance apart as the width of the pour. Control joint depth shall be no less than 25% of the slab thickness.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 3 of 13

The finish shall be smooth with a light broom texture.

Contractor shall be responsible for the removal of all forms after the pour, and for the cleanup of the site from concrete spillage, splash, wash out and other construction debris. The form voids around the edges of the newly poured concrete shall be filled with soil and blended into the existing landscape. All existing sprinkler lines or heads that might have been damaged or dislodged as a result of the work shall be repaired or reset. Any damage from the concrete truck or other equipment shall be repaired by the

Contractor.

Concrete shall not be poured in adverse weather conditions. Apply to the surface of the newly poured and finished concrete ChemMasters SilenCure, WR Meadows CS309, US Spec APS-25, or an approved alternate [It appears that low-VOC types (water-based) are being pushed, so solvent-based may soon be unavailable. WW 13Sep2016] acrylic curing and sealing compound. Notify the Division of the scheduled pour time 24 hours in advance so that an inspection of the forming and grading may be made, and an alternate sealant can be approved.

The Contractor is responsible for the protection of the concrete from vandalism or accidental imprints until work has been completed on the day of the pour.

Concrete Porch, Cap and Steps New work shall meet existing adjacent walking surfaces to provide a means of egress per current code.

The horizontal surfaces shall shed water away from the building with a maximum slope of 2% (1/4 inch per foot) without pooling.

Footings for porch and steps shall be reinforced with rebar and approved in a footing inspection by the

Building Official.

A porch foundation wall shall be 6 inches thick, reinforced with rebar, and doweled to the footing and house foundation.

Steps shall be reinforced with rebar and doweled to the porch foundation wall.

Any cavity under the porch or the steps shall be completely filled with compactable granular material.

A porch cap shall be 5 ¼ inches thick, overhang the foundation wall by 1 ½ inches, and be dowelled to the foundation wall or the house foundation.

A weather step shall replace an existing in the same configuration.

Notify the Division of the scheduled pour time 24 hours in advance so that an inspection of the grading and forming may be made, and the sealant can be approved before the pour. Concrete shall not be poured in adverse weather conditions.

The formwork shall be stable and secure during the pour. Forms that do not stay in place may result in the rejection of the pour by the Division.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 4 of 13

Finish the horizontal surfaces smooth with a light broom texture. Apply foundation plaster to the vertical, above-grade surfaces.

Apply to the surface of the newly poured and finished concrete ChemMasters SilenCure, WR Meadows

CS309, US Spec APS-25, or an approved alternate solvent-based acrylic curing and sealing compound.

The Contractor is responsible for the protection of the concrete from vandalism or accidental imprints until work has been completed on the day of the pour.

Remove forms after the pour, and clean from the site concrete spillage, splash, wash out and other construction debris. The form voids around the edges of the newly poured concrete shall be filled with soil and blended into the existing landscape. Any damage from the work, such as dislodged sprinklers or tire tracks in the yard, shall be repaired to the condition existing prior to the work.

ROOFING

Shingle Roof Tear Off Protect the building and plant material as well as possible from damage caused by removal of the existing roofing. Contractor will walk the property with the Owner to identify anything that is sensitive that could be damaged. Remove and dispose of any and all shingle layers down to the decking. Remove or set any and all nails in the decking. The Contractor shall inspect the decking and replace any decking whose structural integrity has been compromised with wood of similar size and dimension. If the decking is skip sheathing than the Contractor shall provide and install 7/16" OSB or approved equal to the entire roof. This shall be nailed on the rafter lines. The roof shall be dried in according to current code requirements. If any rain gutters are removed or disturbed in this process than the Contractor shall have them reinstalled to drain and function properly.

Install a baked enamel preformed 90-degree drip edge on the entire perimeter of the roof that is being reroofed. Provide and install a 30-year architectural shingle that is listed and meets the current applicable codes for residential roofing. Install Grace, Tamko Moisture Guard, GAF Stormguard, or

CertainTeed Winterguard ice and water shield before installing synthetic or 15-pound tar paper. Install

30-year Tamko Heritage 30, GAF Timberline 30, or CertainTeed Landmark 30 shingles with five nails per full shingle. Install all new pipe flashings that are galvanized or galvanized "no caulk" flashings. This includes pipe flashings at the power mast and flues but not the power mast. Turtle vents shall be aluminum or galvanized and installed on the back side of the roof. The vents shall provide openings that have a net area in accordance with the current applicable codes.

There shall be proper cementation around all chimneys, plumbing vent, pipes, flue vent pipes, TV antennas and any other protrusion on the roof. All valleys shall be ledgered, cut, or woven. All hip ridges shall be capped. Caps shall be cut square with no unevenness, the same color as the roof, and set to a line.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 5 of 13

Where a sloped portion of the roof is intercepted by a chimney (24"or greater), where there is not a saddle or cricket existing, the Contractor shall provide and install a cricket so as to divert the water way from the chimney base. The cricket shall have a 6/12 pitch and shall be as wide as the chimney at the base of the chimney.

Base flashing against a vertical sidewall or chimney shall be step flashing. Install a kickout flashing at the bottom of a run of step flashing. Base flashing against a vertical front wall shall be 4” x 4” “L” flashing.

Where there is an appropriate siding type on a vertical wall, tuck the base flashing under the siding.

Where the base flashing cannot be tucked under the siding, install counter flashing. Caulk shall be 50-year Dow Corning caulk, clear or a matching color.

The roof shall be swept down, and the rain gutters cleaned out. Any and all roofing debris shall be cleaned up and hauled away. The driveway and walkways shall be swept and clean. There will be NO nails found on the premises. All left over supplies shall be removed from the roof and the property.

TPO Roof Protect the building and plant material as well as possible from damage caused by removal of the existing roofing. Remove and dispose of any and all roofing layers down to the decking. Remove or set any and all nails in the decking. The Contractor shall inspect the decking and replace any decking whose structural integrity has been compromised with wood of similar size and dimension. If installing foam board substrate, install a wood nailer the same dimension around the perimeter of the roof. (WW June

28. 2016) If any rain gutters are removed or disturbed in this process the Contractor shall have them reinstalled to drain and function properly.

The TPO roofing shall be 60 mil, meet ASTM D6878, "Standard Specification for Thermoplastic Polyolefin

Based Sheet Roofing", and carry at least a 15-year manufacture's written warranty that is supplied to the

Owner prior to any payment being made. The Contractor shall be certified by the manufacturer to install that specific brand of TPO roofing.

The Owner shall be responsible for all scheduled maintenance on the roof based on the manufacturer's maintenance schedule that shall be supplied to them by the roofing Contractor. Any and all metal drip edge, pipe flashings, and vents shall be TPO coated and approved by the manufacture and shall carry the same 20-year manufacturer's warranty.

The roof shall be swept down, and the rain gutters cleaned out. Any and all roofing debris shall be cleaned up and hauled away. The driveway and walkways shall be swept and clean. There will be NO nails found on the premises. All left over supplies shall be removed from the roof and the property.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 6 of 13

EXTERIORS

Foundation Re-Plaster Remove all loose and hollow plaster from the foundation and concrete porches and steps. Infill voided areas and re-coat entire area specified using commercially available pre-mixed foundation plaster per manufacturer's instructions.

Foundation Plaster Patch Remove all loose and hollow plaster from the foundation and concrete porches and steps. Re-plaster voided areas using commercially available pre-mixed foundation plaster per manufacturer's instructions.

Finish texture and color shall match and blend into the existing adjacent area as well as possible. The

Contractor shall apply a sample in an inconspicuous location for approval of the color by the Owner.

Repoint Brick Repoint exterior brick walls in all spots where there is a gap in the mortar greater than ¼" x ½" or where there is a crack along the mortar longer than 2". Cut out defective joints and rake them to a depth of ¾ inches. Regrout them with mortar using a 1:1:6 mix of Portland cement, lime, and sand. SpecMix #PL-04, or other proprietary Type N mix that contains lime may be used instead. The new mortar shall match the existing as closely as possible. The Contractor shall apply a sample of the mortar in an inconspicuous location for approval of the color by the Owner. The surface to be repointed shall be wet immediately before application. Finish with an appropriate tool or method to match the tooling of the existing mortar as closely as possible. Clean the affected masonry areas to leave them in a condition normally accepted in the trade.

Exterior Paint Properly prepare and repaint all exterior wood surfaces on the structure. These surfaces must be thoroughly cleaned, allowed to dry, and scraped to remove all loose or peeling paint to obtain a sound working surface before new paint is applied. Work includes removing loose caulk and removing and cleaning removable items attached to the structure. Holes, cracks, open joints, and other defects will be caulked smooth.

Unless otherwise specified, prep work does not include re-nailing or replacing broken, loose, or missing wood members.

Owner understands that the texture of the scraped paint may show through to the newly painted surface.

If the surface is unfinished, or unpainted, or bare wood, or a repaired or patched surface, a primer coat will be applied before the two finish coats of paint. The Contractor will wait at least 4 hours between applications. Notify the Division of the scheduled 2nd coat application time 24 hours in advance so that an inspection may be made.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 7 of 13

The Division may require at no additional expense to the Owner additional coats of paint to eliminate bleed-through of background material, unless the Owner chooses a paint that is incompatible with the existing color. It is up to the Contractor to inform the Division in writing of any conflict that may arise over more than two coats of paint, and the Contractor must wait until the Division settles the matter before painting the house. If more than two coats are needed to cover incompatible paint, the Owner will pay the additional costs on the incompatible paint.

There will be clean painting cuts in all corners, around all trim, and where two colors join. The Owner will verify in writing with the Contractor which windows are not operable before painting and the

Contractor will not be responsible for making those windows operable. All windows that were freely operable before painting will be operable after painting.

Windows (This Specification may also apply to doors instead of windows.)

Frame Construction, Material: Extruded aluminum, commonly 6063T5 or T6 alloy for strength and durability. Commercial aluminum window frame wall thickness typically ranges from 0.063" to 0.125"

Frame Depth: Typically 1.75" to 5" depending on system type (storefront, fixed, operable).

Thermal Break: Polyamide or polyurethane thermal breaks for improved energy performance (e.g., Poly-Aluminized™, StructLink-™).

Finish Options, AAMA 2603 baked enamel, AAMA 2604/2605 highperformance Kynar coatings, Clear or bronze anodized finishes.

Standard Glass:1", insulated glass units (IGUs), Laminated glass (9/16" or 13/16" laminated IGU for impact systems)

Available Glazing Types: LowE coatings, Tinted glass, Impactresistant glazing (hurricane, blast, ballistic)

Commercial aluminum windows must meet AAMA and ASTM performance standards:

AAMA/NWWDA 101/I.S.297

ASTM Testing Requirements, ASTM E283: Air infiltration, ASTM E330: Structural load resistance, ASTM

E547: Water penetration, ASTM F588: Forced entry resistance

Design Pressure (DP)Typical commercial DP ratings: +90 / -120 PSF for impact storefront systems.

Installation Requirements:

Install per the manufacturer’s shop drawings and local codes. Protect aluminum from dissimilar materials (use pads or coatings). Ensure weep systems are open and functional. Shim and brace before anchoring.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 8 of 13

All windows shall be insulated glass (double paned) and at least ¾" overall. Screens shall be included on all operable windows. All screens shall be tubular construction with the ability to rescreen the frame.

Installation:

All remodel windows shall be installed according to AAMA 2410-03, and all new construction windows shall be installed according to AAMA 2400-10. The new window shall fit the existing jamb and or opening with a maximum of ¼" variance within the opening. The window shall be installed straight, plumb, and level, without twisting and securely anchored in place, in accordance with manufacture's published recommendations and the AAMA 2410-03 and AAMA 2400-10 standards. The sill shall be adequately supported along its entire length. At least three sides of the window will be foamed with

Great Stuff Pro low expansion foam (from Dow) or approved equal. A non-hardening sealant compatible with vinyl shall be installed in sufficient quantity to provide a watertight seal between the window and the surrounding construction on the interior and the exterior. Dow 795 or 1199 silicone, or approved equal, shall be used on the exterior and a latex caulk on the inside. Remove and dispose of the existing specified window sashes. Replace any removed & broken wooden stop with new stop that matches the existing. The new stop shall be primed and painted to match the existing jambs.

If there are any gaps bigger than a ¼" the installer shall use backer rod before caulking in the window.

The use of vinyl flat trim (same color as the windows) shall be used if there are any gaps bigger than

3/8".

Exterior Door’s Commercial Commercial aluminum front doors are architectural entrance systems designed for high traffic commercial environments. They are available as fully glazed doors or solid aluminum panel doors depending on security, privacy, and aesthetic needs.

Aluminum Alloy: 6063T5 or T6 architectural aluminum, corrosionresistant and suitable for commercial storefront systems.

Stile & Rail Profiles: Commercial doors are categorized by stile width: Narrow stile: 21/8" face — light commercial traffic: Medium stile: 31/2" face — heavy commercial traffic: Wide stile: 5" face — abusive or very hightraffic applications All typically 13/4" depth.

Glazing & Panel Options for Doors WITH Glass 1/4" tempered clear glass, 1" insulated LowE glass for energy efficiency

Doors WITHOUT Glass, Aluminum insulated panels (commonly 1" thick), Solid aluminum sheet panels.

Thermally broken insulated panels for energy efficient buildings These panels fit into the same glazing pockets used for glass.

Energy Efficiency: Insulated glass or insulated panels improve thermal performance. Thermally broken storefront systems help regulate indoor temperature. LowE glass reduces heat gain/loss.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 9 of 13

Standard Hardware: Grade 1 commercial hardware, Push/pull handles, Locking hardware, Thresholds

ADA Accessibility: Low resistance operation, ADA Compliant thresholds and hardware when specified, Required clear opening widths and maneuvering clearances

Finish Options: Clear anodized, Bronze/black anodized.

Fiber Cement Siding Use James Hardie Hardieplank ®, Certainteed WeatherBoards ®, or approved equal fiber cement as defined by the 2006 IBC. Prepare surface by removing nails, repairing sheathing, and applying house-wrap strictly to manufacturer's specifications. Install 1" x 8 ¼" fiber cement lap siding to the surface per manufacturer's instructions.

Vinyl Siding Provide and install vinyl siding per manufacturer's instructions in the specified areas. Existing siding will not be removed. The installation shall include rigid foam insulation backer as per manufacturer's instructions, corner moldings at corners, J channel at openings, and J-boxes at fixtures and vents. The siding material shall be minimum 0.044 inches thick, and shall have a written, 30-year non-prorated warranty from the manufacturer against color fading, peeling, flaking, and cracking. The Owner shall be offered a choice of styles and colors.

Stucco

Put up sheathing materials. You may stucco over any rigid material attached to your support studs. Make sure to follow Salt Lake City building codes while installing the sheathing material.

Cover the sub-straight with 2 layers of "Grade D" building paper or an equivalent water-resistant barrier.

You may also use 15 lb. per 100 square foot roofing felt (6.8 kg per 9.3 square meters) or some types of house wrap, but do not use a plastic house wrap not intended for stucco. Overlap the paper by at least 4 inches (10 cm) and fasten with roofing nails.

Start at the bottom and overlap the paper or felt as you work your way up.

While not required by most codes, an air gap between the 2 layers is highly recommended to prevent wall rot. A 3D plastic drainage mat between the 2 barriers is one way to accomplish this.

Install casing bead as a plaster stop at the corners of doors and windows. Install weep screed at the base of the wall for better drainage.

Attach metal lath. The metal lath should nail or staple the lath to the studs (not the sheathing) at no less than 7-inch (18 cm) intervals. Overlap the lath by at least ½ inch (1.25 cm) along the long side and 1 inch

(2.5 cm) at the end, but not much more.

Be sure to use only galvanized roofing nails or staples designed for use with stucco. Otherwise, your nails or staples will rust and pull loose.

In all exterior stucco applications, you must use G-60 hot-dipped galvanized lath.

Lath shall be at least ¼ inch furring or make up for non-furred lath using furring strips or furring nails.

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 10 of 13

Install control joints to reduce cracking. Divide the wall into rectangular panels using control joints.

Controls joins shall be no more than 18 ft apart. Also install control joints wherever 2 dissimilar walls meet. If the lath is expanded metal (rather than stucco mesh), cut it behind each control joint to fully separate this rigid material into panels.

Panels shall be as close to square as possible, and no larger than 144 ft2

Mix the scratch coat from 1 part cement material and 2¼ to 4 parts plaster sand. If you are using Type I

Portland cement instead of plastic cement, you'll need to add your own hydrated lime; count the final cement and lime mixture as the "1 part cement.

Make sure to use cool water when mixing your stucco, especially if your hose has been sitting in the sun.

If the water is hot or warm, it will cause your stucco to dry too quickly.

The aggregate in the cement should be clean and well graded.

Apply the scratch coat with a square trowel at a 45º angle, firmly pushing it into the lath. This layer should be ⅜ inch thick.

The first scratch coat should be thick enough to cover your wire grid.

Score the scratch coat lightly to ensure a good bond with the next coat.

Wet cure the scratch coat. The thick scratch coat must be allowed to cure for 48 hours. Protect the stucco from drying out. Mist or fog the stucco twice daily unless the relative humidity is above 70%.

Protect the wall with a windscreen or sunshade if necessary.

Mix another batch using 1 part cement and 3 to 5 parts sand. Apply another ⅜ inch layer of stucco and screed to an even thickness, for a total thickness so far of ¾ inch. Once the brown coat loses its sheen, float it smooth.

Wet cure for at least 7 days.

Cover with the finish coat with a ⅛ inch layer. Apply and float using 1 part cement to 1½ to 3 parts sands.

Rain Gutters Commercial rain gutters are engineered roof drainage assemblies designed to collect, channel, and discharge stormwater from large commercial roof areas. They must handle higher runoff volumes, larger roof spans, and greater structural loads than residential systems.

Commercial gutters are commonly fabricated from: Aluminum (most common for corrosion resistance)

K-Style Gutters: Common commercial sizes: 6inch — small to medium commercial buildings, 7inch — larger rooflines, 8inch — industrial or high volume drainage needs

Commercial-grade aluminum gutters are typically fabricated in the following thicknesses: 0.040" aluminum (standard commercial): 0.050" aluminum (heavy-duty commercial): 0.063" aluminum

(industrial or high load applications)

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 11 of 13

Gutter Size Downspout

Size

6" 3×4" or 4×5"

7" 4×5" or 5×6"

8"+ Custom sizes

Steel Railing Provide and install steel railing (“ironwork”), handrail or guardrail as specified, in the area specified. The handrail (or top of a guardrail that also serves as a handrail) channel iron dimension shall be 1 ½" x ¾”.

Unless otherwise specified, the rails will be powder coated. The 1-year Work Guarantee will cover rust on the railing, unless the rust was caused by damage in use. The Owner shall have a choice of colors.

Hand Rails

The top of a handrail must be parallel to the stairway and mounted at a height between 34 and 38 inches above the front edge of the stair treads. The railing must be continuous for the length of the stairway. In a public building, the handrail must extend at least 12 inches beyond the top and bottom treads.

The railing and mounting hardware must be capable of supporting a weight of 200 pounds applied in any direction at any point. The maximum gap allowed between brackets supporting the handrail is eight feet.

Dimensions

A railing attached to a wall must be at least 1¼ inch and no more than 2 inches thick. The support brackets must hold the railing at a distance of at least 1½ inches from the wall and project a maximum of 3½ inches from the wall. The surface of a railing must be smooth, with no sharp corners.

ELECTRICAL

Electrical – General Requirements The electrical work items will be outlined in the electrical permit. All materials shall be new and shall be

UL approved and/or National Electrical Code rated. All drilling, cutting, and fastening shall be neat and true. All electrical equipment abandoned due to the specified work shall be removed. Any areas that

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 12 of 13 may show when any previous panels, boxes, conduits, or raceways are removed as a result of the specified work shall be patched and painted to match the surrounding surface as closely as possible.

Replace Electrical Outlet Receptacle Replace the existing outlet receptacle with a new duplex outlet receptacle. The new receptacle shall be

GFCI protected if located where GFCI protection is required by current code. If the existing circuit is not grounded, the new GFCI receptacle may be left ungrounded.

New Electrical Outlet Receptacle Provide and install a new, grounded, duplex outlet receptacle and required distribution. If installed on a framed wall, fish wire, and repair tear out. If installed on a masonry wall, use residential, surface mounted raceway and a surface-mounted receptacle. If installed in a garage, use metal raceway and a surface mounted receptacle. The new receptacle shall be GFCI protected if located where GFCI protection is required by the Utah UBC.

EXTERIOR LIGHTING

Lighting – General Requirements

Exterior commercial lighting requires durable, high-output fixtures designed for safety and efficiency, with 4000K–5000K color temperatures.

IP Rating: Minimum IP65 (dust-tight, water-resistant) is required for outdoor durability, with IP66 offering stronger protection

Material: Die-cast aluminum housings with industrial-grade powder coating.

Lens: Shatter-resistant polycarbonate or tempered glass.

4000K: Ideal for walkways, building perimeters, and general commercial use.

5000K: Used for security areas and parking lots.

Wall Packs: 4000K–5000K for entrances, perimeter security, and loading bays

451 South State Street, Room 445, Salt Lake City, UT 84114 Page 13 of 13

SIGNAGE

Signs – General Requirements

Commercial exterior building signs require durable materials to withstand weather, with common options including aluminum, aluminum composite material (ACM), and high-density plastics. Letter height should be at least 1 inch for every 10 feet of viewing distance for maximum readability.

Aluminum Panels (.040" - .063"): Lightweight, sturdy, and ideal for long-term outdoor use.

Aluminum Composite Material (ACM): Typically 3mm thick, consisting of two aluminum sheets bonded to a polyethylene core, offering superior rigidity for large signs.

Corrugated Plastic (4 Mil - 10 Mil): Used for temporary, construction, or real estate signage.

Finish: Matte or gloss finish with UV-printed or vinyl graphics for weather resistance.

Requirements
Performance Requirements
Landscape Restoration
CONCRETE
Sub-Grade Prep
Gravel Sub-Grade
Ready-Mix Concrete
Exterior Flatwork
Concrete Porch, Cap and Steps
ROOFING
Shingle Roof Tear Off
TPO Roof
EXTERIORS
Foundation Re-Plaster
Foundation Plaster Patch
Repoint Brick
Exterior Paint
Windows
Exterior Door’s Commercial
Fiber Cement Siding
Vinyl Siding
Rain Gutters
Steel Railing
ELECTRICAL
Electrical – General Requirements
Replace Electrical Outlet Receptacle
New Electrical Outlet Receptacle
EXTERIOR LIGHTING
Lighting – General Requirements
SIGNAGE
Signs – General Requirements