This is a bid quote form for the Office of Business and Procurement Services of the City of Chicago (Illinois) for Bid #MWJ2605, a roof replacement project at the South Chicago Learning Center of Olive-Harvey College. The project requires bidders to submit a base bid for roof replacement work with a construction start date assumed for May 10, 2027, along with a preliminary project schedule indicating the base bid duration in calendar days. Bidders must also submit an alternate bid option for providing a Cold-Applied Hybrid TPO-SBS Roofing System in lieu of the Hot-Applied Hybrid TPO-SBS Roofing System, with associated calendar day adjustments. The bid due date is October 7, 2026, and bidders must submit two versions of the completed form: one Excel file and one signed PDF file via the EUNA/Bonfire platform.
The bid quote form requires a lump sum base bid with a 10 percent unforeseen conditions allowance and a $10,000 permit cost allowance. Bidders must provide a detailed Schedule of Values breaking down labor and material costs across multiple work categories including general requirements, existing conditions, concrete repair, metals, wood and composites, thermal and moisture protection systems, plumbing, HVAC, and electrical work. The qualification statement section requires submission of company information, insurance and bonding documentation, a five-year project history for roof replacement projects exceeding $3,000,000, yearly dollar volume of related contracting work for the past three years, disclosure of any penalties or work stoppages in the past five years, and staffing information including the names and experience of proposed job superintendents. Bidders must also acknowledge receipt of any addenda issued for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| OFFICE OF BUSINESS AND PROCUREMENT SERVICES | |||
| BID #MWJ2605 - ROOF REPLACEMENT FOR SOUTH CHICAGO LEARNING CENTER (OLIVE-HARVEY COLLEGE) | |||
| 00500 - BID QUOTE FORM | BID DUE DATE: OCTOBER 7, 2026 | ||
| (Upload in EUNA/Bonfire two(2) versions of this form: one (1) Excel file and one (1) signed pdf file) | |||
| BIDDING COMPANY'S NAME | |||
| SIGNER'S NAME AND TITLE (Print) | |||
| SIGNER'S SIGNATURE AND DATE | Date: | ||
| 5.01 - BASE BID | |||
| Base Bid Duration Period in calendar days: Attach a preliminary project schedule, assume 5/10/2027 construction start date. | |||
| Base Bid Total | $ - 0 | ||
| 10% Unforseen Conditions Allowance | $ - 0 | ||
| $10,000 allowable items (Permit costs) | $ 10,000.00 | ||
| GRAND TOTAL | $10,000.00 | ||
| 5.01 ALTERNATES | |||
| Alternate 1 - Add/ Deduct calendar days: Days added/ deducted from Base Bid construction duration | |||
| Alternate 1 Bid - Lump Sum Provide Cold-Applied Hybrid TPO - SBS Roofing System in lieu of Hot-Applied Hybrid TPO – SBS Roofing System | $ - 0 | ||
| 5.01 - TOTAL BID | |||
| Base Bid - Lump Sum | |||
| Alternate 1 - Lump Sum | |||
| 10% (Base Bid) Unforseen Conditions Allowance | $ - 0 | ||
| Permit allowance | $ 10,000.00 | ||
| GRAND TOTAL | $10,000.00 | ||
| SCHEDULE OF VALUES: Bidder shall submit a detailed Schedule of Values for the Base Bid Scope of Work. As a minimum, these schedules shall include the following: | |||
| BASE BID (LABOR) | BASE BID (MATERIAL) | ||
| 010000 - General Requirements | $ - 0 | $ - 0 | |
| 020000 - Existing Conditions | $ - 0 | $ - 0 | |
| 030000 - Concrete Repair | $ - 0 | $ - 0 | |
| 050000 - Metals | $ - 0 | $ - 0 | |
| 060000 - Wood, Plastics, and Composites | $ - 0 | $ - 0 | |
| 070000 - Thermal & Moisture Protection System | $ - 0 | $ - 0 | |
| 220000 - Plumbing | $ - 0 | $ - 0 | |
| 230000 - HVAC | $ - 0 | $ - 0 | |
| 26000 - Electrical | $ - 0 | $ - 0 | |
| SUBTOTAL | $ - 0 | $ - 0 | |
| General Conditions/Bond/Insurance | |||
| Contractor's fees | |||
| Total Estimated Construction Costs (does not include alternate, unforeseen conditions, or permit cost allowance) | $ - 0 | $ - 0 | |
| 5.02 - Contractor's Qualification Statement | |||
| A. Company Information | |||
| Name of Company | |||
| Type of Company | |||
| Name of Principles of Company | |||
| Name of Parent Company, if any | |||
| Number of years in business | |||
| Number of years in the related field | |||
| City of Chicago License (please attach a copy) | |||
| B. Insurance & Bonding | |||
| Insurance Carrier (Attach a copy of Certificate of Insurance} | |||
| Bidder acknowledges compliance with Insurance requirements | |||
| Bonding company's name | |||
| C. Experience | |||
| Briefly describe your company's history: | |||
| List related roof replacement projects in past 5 (five) years over $3,000,000 | |||
| Project Description | Cost | Contact Person | |
| List related fields of general contracting contracts of the type being requested at the present time or within the last five (5) years: | |||
| Project Description | Company | Date Performed | |
| D. Work Volume - State yearly dollar volume of relaed field contracting work during the past three (3) years: | |||
| Year | Dollar Volume | ||
| E. Penalties, Damages & Work Stoppages | |||
| List any assessed penalties or liquidated damages which occurred in the past five (5) years. Include contract terminations: | |||
| List any project in the past five (5) years during which work was halted by the Owner, Architect, Consultant or Authority having Jurisdiction. State project name, date and reason for shutdown | |||
| Project Name | Date | Reason for Shutdown | |
| F. Staffing | |||
| Total number of full-time company employees. Name(s) of proposed Job Superintendent(s) and years of related field experience | |||
| Total # of full-time employees: | |||
| Job Supertindent Name(s) | Years of Experience | ||
| 5.03 Acknowledgement of Addenda - Bidder acknowledges receipt of the following addenda: | Date(s) | ||
| Addendum No. 1 | |||
| Addendum No. 2 | |||
| Addendum No. 3 | |||
| Addendum No. 4 | |||
| Addendum No. 5 |