1 Contractor Technical Certification.pdf
PDF 196 KB Posted
- Attached to
- Rental of Two (2) Complete Chill Water Systems
- Solicitation number
- N4215823RS007
About this file
This document contains two technical certification forms for chill water system rentals at Norfolk Naval Shipyard. The first form is for a system with one 30-ton chiller and one 60-ton chiller from July 2023 to July 2024, with two one-year option periods. It requires air-cooled chillers, pumps to provide 30-500 GPM at 250 feet of head pressure, manifolds with specific connection quantities, a 250-gallon reservoir, bypass line, and other specifications. The second form is for a system with one 30-ton chiller and two 60-ton chillers from April 2023 to April 2024, potentially extending month-to-month for six months. It has similar but updated requirements, such as pumps providing 30-500 GPM at 300 feet of head pressure and manifolds with different connection quantities. Both forms require the vendor to certify their equipment meets all specifications and to provide technical data.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Technical Certification
Vendor must certify that equipment being quoted meets the capabilities listed below. Furthermore, vendor must provide technical specification data in Tables A for the equipment that will be provided. In order to be considered for award, this must be completed and submitted with the vendor quote.
PURPOSE OF REQUEST: Service rental for one complete Chill Water System consisting of one 30 Ton chiller and one 60 Ton Chiller
LOCATION: Norfolk Naval Shipyard (NNSY), Portsmouth, VA 23709
PERIOD OF PERFORMANCE: 24 July 2023 through 23 July 2024 with two (2) twelve month options periods.
Chiller
P
P
P
Tank
Bypass Line
Chiller
Figure (1) – Line Diagram of Proposed System
Note 1: Final system may consist of different quantities of Chillers and Pumps (P) than shown in Figure (1) as long as the requirements above are met.
Note 2: Final system may change the order of components as long as the requirements above are met.
Note 3: Freeze protection is not shown in Figure (1). A Freeze protection method must be included for the system in the event there is no colling load on the system.
Note 4: Figure does not represent the correct amount of supply and discharge manifold connections. See Paragraph 6 for the required amount of connections.
Table A
TECHNICAL CAPABILITIES STATEMENT
General Specification for One complete Chill Water System consisting of one 30-Ton chillers and one 60-Ton Chiller
Must be provided with the following capabilities, features and specifications: YES NO
Only fresh water will be circulated through the cooling system described above and shown in Figure (1).
Chill Water System must consist of at least three chillers. System must be able to support varying capacity from 30 to 90 tons of cooling capacity. System shall consist of one 30 Ton chiller and one 60 Ton Chiller.
System shall be able to allow isolation of each chiller separately to support varying chill water laods shipboard.
Must be air cooled.
Must be provided with the following capabilities, features and specifications: (Continued) YES NO
Must have a pumping system, consisting of at least two pumps. System must able to provide a variable supply of 30 to 500 GPM. Each pumping apparatus must be capable of maintaining 250 feet of head supply pressure, at all GPM ranges, at the contractor provided supply manifold. At a minimum, the pumping system shall have a minimum of 100 GPM at 100 feet of head pressure of redundant capacity. The expansion tank shall supply water directly to the pumps as shown in Figure (1). Additional pumps downsteam of the chiller unit(s) may be utilized to raise supply pressure to meet the required 250 feet of head pressure requirement at the contractor supplied supply manifold.
Must have suction and discharge manifolds with a quantity of ten (10) 2-1/2” MNPT supply connection and a quantity of ten (10) 2-1/2” MNPT discharge connections. All manifold connections shall have isolation globe valves installed. Manifolds shall include isolations valves to isolate the manifolds from the rest of the supplied chill water system.
Within the cooling loop there must be a reservoir capable of holding at least 250 gallons of cooling water or as required to support system design. Reservoir is required to account for small leaks.
Reservoir must be transparent in order to visibly verify the water level within the tank. Tank shall have a constant vent on the top or be open to the atmosphere to aid in bleeding air out of the chill water system.
System shall include a bypass line in order to flow water when no services are connected to the contractor supplied supply and discharge manifolds. This bypass line shall include globe valves so the flow can be throttled as required to suit ship’s demands and to keep the chiller units running under low flow/pressure conditions.
Desired output water temperature range is 55o - 65oF.
Must be operable on a single 460/480(V), 400 Amp Breaker (maximum).
Must be provided with a male 500 mcm Camlock electrical connection.
System must have necessary equipment to prevent freezing recurculating water with no cooling load at 0 O F.
CRITICAL SYSTEM SUPPORT: Unit must be capable of operating 24 Hours a day Seven
(7) Days a Week.
Must be operable at flow rates of as little as 30 GPM without needing to recirculate flow.
Contractor is to provide all equipment from the return manifold to the supply manifold. System shall be a complete unit. If pumps or tanks are separate, vendor will provide all piping/valves/fittings as required to couple pumps to the Chill Water Units. Vendor is to provide Extra fittings and hoses to support installation. If the system requies assembly, the system shall be assembled in such a way that it does not cause tripping hazards by minimizing the lengths of hoses between components. If lengths of hoses are longer than needed, it should be able to be coiled and put somewhere out of the way of normal foot traffic. Hoses shall be routed in a way that does not cause the hose to kink and reduce flowrate.
Provided hoses and manifold shall have insulation installed around them to reduce temperature losses in the chill water and to reduce the amount of condensation on the outside of the hoses when istalled shipboard.
Chiller Unit(s) must be capable of operating in an industrial environment where dust, dirt, and sea air are present.
Chiller Unit(s) to be equipped with operational Inlet and Outlet Temperature Gages.
Chiller Unit(s) to be equipped with operational Outlet Pressure Gage.
System is to include operational pressure gages on the contractor provided supply and discharge manifold.
Unit shall have an electronic monitoring system that monitors inlet and outlet temperature, pressure, and flow rate. The system shall be able to notify NNSY personnel when the monitored parameters fall outside of a set range.
If chiller system holds 55 gallons or more of fuel or oil or similar fluid, provide an environmental catch capable of holding at least 110% of the capacity of the fuel, oil, and other fluids required to operate the rental unit.
Evaporator must be capable of delivering a leaving temp of less than 65O F.
Condenser must be capable of operating in a wide ambient temperature range (0-125 O F)
Unit must be affixed with a metal tag designating the supplying company, a POC responsible for repairs and maintenance, and a phone number of the POC who is responsible for repairs and maintenance.
Contractor to adhere to the rigging requirements as outlined in Attachment B for contractor equipment at Norfolk Naval Shipyard.
The gross weight of the unit shall be clearly marked on the outside of the unit as outlined in Attachment B. If the unit is not a complete unit, the gross weight of each component shall be clearly marked on each component.
TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION
Vendor hereby certifies that vendor’s service meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. ___________ (initials)
Signature Printed Name
Title Date
Vendor must certify that equipment being quoted meets the capabilities listed below. Furthermore, vendor must provide technical specification data in Table B for the equipment that will be provided. In order to be considered for award, this must be completed and submitted with the vendor quote.
PURPOSE OF REQUEST: Service rental for one complete Chill Water System consisting of one 30-Ton chiller and two 60-Ton Chillers.
LOCATION: Norfolk Naval Shipyard (NNSY), Portsmouth, VA 23709
PERIOD OF PERFORMANCE: 24 April 2023 to 23 April 2024 with clause to extend month to month for 6 months if needed.
Chiller
Chiller
P
P
P
Tank
Bypass Line
Chiller
Figure (2) – Line Diagram of Proposed System
Note 1: Final system may consist of different quantities of Chillers and Pumps (P) than shown in Figure (2) as long as the requirements above are met.
Note 2: Final system may change the order of components as long as the requirements above are met.
Note 3: Freeze protection is not shown in Figure (2). A Freeze protection method must be included for the system in the event there is no colling load on the system.
Note 4: Figure does not represent the correct amount of supply and discharge manifold connections. See Paragraph 6 for the required amount of connections.
Table B
TECHNICAL CAPABILITIES STATEMENT
General Specification for One complete Chill Water System consisting of one 30 Ton chiller and two 60 Ton Chillers.
Must be provided with the following capabilities, features and specifications: YES NO
Only fresh water will be circuletated through the cooling system described in the SOW and shown in Figure (2).
Chill Water System must consist of at least three chillers. System must be able to support varying capacity from 30 to 150 tons of cooling capacity. System shall consist of one 30 Ton chiller and two 60 Ton Chillers.
System shall be able to allow isolation of each chiller separately to support varying chill water laods shipboard.
Must be air cooled.
Must have a pumping system, consisting of at least two pumps. System must able to provide a varaiable supply of 30 to 500 GPM. Each pumping apparatus must be capable of maintaining 300 feet of head supply pressure, at all GPM ranges, at the contractor provided supply manifold. At a minimum, the pumping system shall have a minimum of 300 GPM at 200 feet of head pressure of redundant capacity. The expansion tank shall supply water directly to the pumps as shown in Figure (1). Additional pumps downsteam of the chiller unit(s) may be utilized to raise supply pressure to meet the required 300 feet of head pressure requirement at the contractor supplied supply manifold.
Must have suction and discharge manifolds with a quantity of eight (8) 2-1/2” MNPT supply connection and a quantity of eight (8) 2-1/2” MNPT discharge connections. All manifold connections shall have isolation globe valves installed. Manifolds shall include isolations valves to isolate the manifolds from the rest of the supplied chill water system.
Within the cooling loop there must be a reservoir capable of holding at least 250 gallons of cooling water or as required to support system design. Reservoir is required to account for small leaks.
Reservoir must be transparent in order to visibly verify the water level within the tank. Tank shall have a constant vent on the top or be open to the atmosphere to aid in bleeing air out of the chill water system.
System shall include a bypass line in order to flow water when no services are connected to the contractor supplied supply and discharge manifolds. This bypass line shall include globe valves so the flow can be throttled as required to suit ship’s demands and to keep the chiller units running under low flow/pressure conditions.
Desired output water temperature range is 50o - 65oF.
Must be operable on a single 460/480(V), 400 Amp Breaker (maximum).
Must be provided with a male 500 mcm Camlock electrical connection.
Must be operable at flow rates of as little as 30 GPM without needing to recirculate flow.
CRITICAL SYSTEM SUPPORT: Unit must be capable of operating 24 Hours a day Seven
(7) Days a Week.
Must be operable at flow rates of as little as 30 GPM without needing to recirculate flow.
Contractor is to provide all equipment from the return manifold to the supply manifold. System shall be a complete unit. If pumps or tanks are separate, vendor will provide all piping/valves/fittings as required to couple pumps to the Chill Water Units. Vendor is to provide Extra fittings and hoses to support installation. If the system requies assembly, the system shall be assembled in such a way that it does not cause tripping hazards by minimizing the lengths of hoses between components. If lengths of hoses are longer than needed, it should be able to be coiled and put somewhere out of the way of normal foot traffic. Hoses shall be routed in a way that does not cause the hose to kink and reduce flowrate.
Provided hoses and manifold shall have insulation installed around them to reduce temperature losses in the chill water and to reduce the amount of condensation on the outside of the hoses when installed shipboard.
Chiller Unit(s) to be equipped with operational Inlet and Outlet Temperature Gages.
Chiller Unit(s) to be equipped with operational Outlet Pressure Gage.
Unit shall have an electronic monitoring system that monitors inlet and outlet temperature, pressure, and flow rate. The system shall be able to notify NNSY personnel when the monitored parameters fall outside of a set range.
If chiller system holds 55 gallons or more of fuel or oil or similar fluid, provide an environmental catch capable of holding at least 110% of the capacity of the fuel, oil, and other fluids required to operate the rental unit.
Evaporator must be capable of delivering a leaving temp of less than 65O F.
Condenser must be capable of operating in a wide ambient temperature range (0-125 O F)
Unit must be affixed with a metal tag designating the supplying company, a POC responsible for repairs and maintenance, and a phone number of the POC who is responsible for repairs and maintenance.
Contractor to adhere to the rigging requirements as outlined in Attachment B for contractor equipment at Norfolk Naval Shipyard.
The gross weight of the unit shall be clearly marked on the outside of the unit as outlined in Attachment B. If the unit is not a complete unit, the gross weight of each component shall be clearly marked on each component.
TECHNICAL CAPABILITY/CONTRACTOR RESPONSIBILITY CERTIFICATION
Vendor hereby certifies that vendor’s service meets or exceeds all specifications and contractor responsibilities stated in this solicitation, in their entirety, with no exceptions. ___________ (initials)
Signature Printed Name
Title Date
File details come from the government source that posted it. Updated .