This is a response document to building permit comments submitted by the City of DeBary regarding construction of the City of DeBary Public Safety Complex located at 16 Colomba Road, DeBary, Florida. The document, dated November 3, 2014, provides detailed responses to 18 general comments and 15 access floor system comments from the Building Official. Key responses address accessibility compliance revisions, including modification of entrance slopes from 2 inches to 1 inch to meet Florida Building Code standards, relocation of shower controls in accordance with FBC accessibility requirements, and clarification of restroom door swing specifications. The document confirms that the General Contractor will submit truss shop drawings, manufacturing instructions for spray-applied insulation, security window specifications, and security partition details once the bidder is selected prior to obtaining the building permit. Additional clarifications include roof sheathing specifications (5/8" rather than 3/4"), window laminate thickness requirements (7/16"), waterproofing details for split-face block, and structural load specifications for various building areas.
The Engineer's Estimated Cost of the project is $1,100,000. Sealed proposals were scheduled to be received by the City of DeBary on Monday, November 10, 2014, at 10:00 AM, with a mandatory pre-bid conference held on Wednesday, October 29, 2014, at 10:00 AM at City Hall. Each proposal requires an acceptable Proposal Guaranty equal to at least five percent of the proposal amount, with the successful bidder required to execute the contract, provide certificates of insurance, and file Performance and Payment Bonds within ten days after contract award. The City of DeBary reserves the right to reject any or all proposals and waive any formality or technicality in the interest of the City.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 5-2014.11.7_-_Addendum_2_-_Specifications.pdf | ||
| Arch_Plans_-_Bid_Set.pdf | ||
| 00-2014.11.7_-_Addendum_2.pdf | ||
| 4-2014.11.7_-_Addendum_2_-_A&E_SHEETS.pdf | ||
| Project_Manual_-_Bid_Set.pdf | ||
| 2-D8518_FDOT_SET.pdf | ||
| 3-D8518_CONSTRUCTION_DOCUMENTS_SET.pdf | ||
| Civil_Plans_-_Bid_Set.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
November 03, 2014
City of DeBary 16 Colomba Road DeBary, FL 32713
RE : DeBary Public Safety Complex , DeBary, FL Conformed Documents Submittal (Revisions to Building Permit Application)
The following is in response to the Building Official City of DeBary, November 03,2014
Comment # 1: Provide Geotech Report Response: Comment Noted. Geotech Report attached.
Comment # 2: Mezzanine (delete) all sheets not a mezzanine Response: Comment Noted. The second floor is a mechanical platform.
Refer to Sheet A101 and other sheets in set.
Comment # 3: Accessible showers (relocate controls in accordance to FBC (A) 608.5.1 Response: Comment Noted. Shower controls and nozzle will be installed on the wall opposite the shower seat. Refer to Sheet A602, note 16. The shower controls shall be within 16” between the shower nozzle and the shower curtain.
Comment # 4: Rest rooms door swing FBC (A) 603.2.3 Response: Per the Florida Accessibility Code 603.2.3; exception #2 - the door may swing into the clear floor space of a fixture if there is a clear floor space of 30” x 48” beyond the arc of the door swing.
Comment # 5: Sheet A100 (2” slope) accessible route. Entrances 404(206.4.2 – 206.4.0) slope not to exceed 1:48 FBC (A) 404.2.4.4 Response: Comment Noted. Slope at employee entrance and vestibule entrance shall be modified to 1”. Refer to Sheet A100 and S101.
Comment # 6: Energy Calculations Response: Comment Noted. Please see attached.
Comment # 7: Window Specifications Response: Please see attached Specification Section 08570. CGI Windows with laminated glass is called out as a basis of design. This manufacturer’s factory laminated glass is two lights of 3/16” glass laminated together for a total of 7/16”.
Plan references will be updated to correspond.
Comment # 8: Truss profiles & layout Response: Comment Noted. General Contractor shall submit Truss Shop Drawings of Roof Framing Plan & Truss Profiles by Florida P.E. once bidder has been selected prior to obtaining the building permit.
500 West Fulton Street Sanford, Florida 32771
Phone: 407.322.6841
AA2600926
www.cphcorp.com
Comment # 9: 9/16” laminate windows…. Submittal indicates 7/16 laminate Response: Refer to revised sheet A100, A200 and A201 (note #2). Laminated glazing in windows shall not be any less than 7/16” thick.
Comment # 10: Clarify size of roof sheathing 5/8” or 3/4” on A200 / A301.
Response: Roof sheathing shall be 5/8” not 3/4”. Refer to revised sheet A301.
Comment # 11: Check water proofing behind split face block Response: Refer to revised sheets A200, A201 and A400. Split face block shall be primed and painted with water proof paint. Refer to revised Specification Section 09900; Part 2.03 Paint Systems Exterior; E.
Comment # 12: A701 stucco behind plaster details 1 & 2 Response: Comment noted. Refer to revised sheet A701.
Comment # 13: Lights in holding cells - move location?
Response: These fixtures are corner mounted. The placement was chosen so that they are less likely to be damaged or vandalized.
Comment # 14: Recommend bodine lights for emergency Response: : Twin head emergency fixtures with battery back-up are more cost effective than emergency inverter ballast to stay within the designated project budget
Comment # 15: Sheet A102 provide description of ceiling & soffit Response: Refer to revised Sheet A102 for description of vinyl soffit.
Comment # 16: Sheet A103 show drip on appropriate eave details Response: Comment Noted. Eave detail updated on A103
Comment # 17: .032 al. drip not allowed Response: Comment Noted. Detail updated on A103 and note #4 on A200 and A201.
Comment # 18: .024 minimum for aluminum drip per FBC T1503.2 Response: Comment Noted. Detail updated on A103 and note #4 on A200 and A201.
ACCESS FLOOR SYSTEM
Comment # 1: Provide manufacturing instructions for spray applied open-cell insulation R-20 Response: General Contractor shall submit cut sheets & manufacturer’s installation instructions once bidder has been selected prior to obtaining the building permit.
Comment # 2: Sheet A401 describe insulation stop Response: Refer to revised sheet A401
Comment # 3: Provide Manufacturing instruction for Amico Secura Lath or approved equal.
Response: General Contractor shall submit once bidder has been selected prior to obtaining the building permit.
Comment # 4: Provide sheet A403 (noted on A402) Response: Note should read A402 not A403 see revised sheet.
Comment # 5: Provide Manufacturing instructions for transaction window Response: General Contractor shall submit manufacturer’s installation instructions once bidder has been selected prior to obtaining the building permit.
Comment # 6: Provide Manufacturing instruction for High Security Sliding partition.
Response: General Contractor shall submit manufacturer’s installation instructions once bidder has been selected prior to obtaining the building permit.
Comment # 7: Sheet A601 – redefine note 8 Response: Refer to A601; Holding Area Key Notes – Notes 7 & 8 not used.
Comment # 8: Sheet A601 sliding mesh partition in restrooms?
Response: Clarification: Note #5 on A601 refers to Holding Area, not restrooms
Comment # 9: Sheet A601 redefine note 6 (plumbing chase) Response: Comments Noted. Note 6 should be note 10.
Comment # 10: Holding cells camera & surface mounted light fixture?
Response: Cameras and fixtures are corner mounted so that they are less likely to be damaged or vandalized. The final placement of cameras will be per Volusia County’s vendor.
Comment # 11: Lobby & corridor live load 100 PSF Response: Refer to revised sheet S001
Comment # 12: Provide design load for mechanical room (floor load) Response: Refer to revised sheet S001
Comment # 13: Sheet S101 slab on grade A – Clarify thickness Response: Final thickness was changed to 4”.
B - Clarify vapor barrier thickness Response: Vapor barrier thickness should be 10 mils. Already changed in drawings.
C – Access floor system Response: No access floor system.
D – Exterior slopes Response: Changed to 1” for staff and cell areas.
E – Clarify typical foundation section Response: Typical foundation section for columns – Refer to S101
F – Clarify location of “S” notes Response: Refer to revised Plan S102
Comment # 14: Clarify discrepancies sheets S101 & S 102
a) Sheet S201 provide location of beam CBI – identify MBI location Response: CB1 is been shown on S201. MB1 was already located on S201.
Refer to S201 for discrepancies clarifications.
b) Sheet S202 provide spacing requirement for flat straps & blocking Response: spacing specified. Refer to S202
c) Sheet S301 ring shank nails for roof sheathing required Response: Ring Shank Nails specified. Refer to Sheet S301
d) M101 locate/label AHU #5 Response: Please see AHU #5 label added in IT room on Sheet M101
e) P001 add water heater and add chair carriers to fixture schedule Response: Please see sheet P001 for added water heater. WC-2 does not require a chair carrier. The unit rests on the floor and bolts to the wall. Please see attached installation instructions sheet.
f) Sheet P002 missing from submittal Response: This sheet has been eliminated from the set
g) Sheet E401 clarify 1 phase or 3 phase – clarify panels RP-1 vs PP-1
Response: Service is 208Y120V-3 phase 4 wire. Panel name shall be RP-1
Comment # 15: Provide:
a) Photo Metric plan for exterior lighting Response: Parking lot lighting design and photometrics will be provided by DUKE Energy.
b) Parking lot lighting Response: Parking lot lighting design and photometrics will be provided by DUKE Energy.
c) Surge arrestor(s) Response: SPD’s appear in specification section 16289, updated on E401
d) Wiring schematic for ATS Response: See attached.
e) Sheet E601 (missing) Response: This sheet has been eliminated from the set
f) Location of fire alarms, pull stations, strobes, etc FACP
Response: Refer to new sheets F100 and F101
Please feel free to contact us at 407-322-6841 if additional information is needed for your review process.
Sincerely, CPH, Inc.
Vic Tan, AIA, NCARB Vice President/ Associate
Xc: Gail Cleavenger, AIA /CPH,Inc.
Jeremy Owens, P.E. /CPH, Inc.
Jose Otiz, P.E. /CPH, Inc.
Dennis Matula, P.E. /CPH, Inc.
Randy Taylor, / CPH, Inc.