Water Treatment Plant Lime Sludge Lagoon – Engineering Consulting Services

Closed State & local contract opportunity Posted

Solicitation number
26-073
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

City of Aurora, Illinois is soliciting Statements of Qualifications for engineering consulting services on the Water Treatment Plant Lime Sludge Lagoon Concrete Lining project, with SOQ responses due August 26, 2026 at 11:00 a.m.—a hard deadline only five days away.

The scope encompasses environmental assessments, permitting, Portland cement concrete lagoon design, preparation of bid documents, and full-time construction observation and quality assurance services for three clay-lined lagoons (#1, #3, and #4) at the Aurora Water Treatment Plant, 1111 Aurora Ave., Aurora, IL 60505. Physical construction is phased: Lagoon #4 from June 1, 2027 to July 31, 2027; Lagoon #3 in 2028; and Lagoon #1 in 2029, all pending budget availability. The City will provide a 2023 topographic survey and perform any additional surveying required by the selected consultant.

This is a Qualification-Based Selection (QBS) with contract structure as Time and Material, Not to Exceed, subject to negotiation with the top-ranked consultant and City Council approval. The City may conduct interviews with the top 2–3 respondents during the first or second week of September, followed by final selection and negotiation. The selected consultant must maintain General Liability Insurance of $1 million per occurrence and $2 million general aggregate, Auto Liability Insurance of $1 million combined single limit, and Umbrella excess liability of $2 million per occurrence.

Responses must be submitted electronically through the City's OpenGov procurement portal as a single PDF not exceeding 10 pages, including cover letter, list of relevant projects, key staff resumes, technical approach, detailed schedule, and three professional references. Questions were due August 12, 2026. The City reserves the right to reject any or all SOQs and cancel the process at any time.

Opportunity text

The project is located at the Aurora Water Treatment Plant (WTP), 1111 Aurora Ave., Aurora, IL 60505, which has 5 lime sludge lagoons. The map in the attachment section shows the locations of the lagoons. Lagoons #2 and #5 east of WTP building are concrete lined Lagoons #1, #3, and #4 north and west of WTP building are clay lined o Lagoon #1 has PCC wall around the top only All sludge is removed with an onsite excavator, loaded into semis, and is land applied or disposed of at a landfill. Lagoons #3 and #4 - sludge is removed and excavated from both sides of the lagoon Lagoons #1, #2 and #5 - sludge is removed and excavated from 1 side of the lagoon Bottom and center of Lagoons #3 and #4 have a 15 wide PCC bottom with perforated drain tile running longitudinally down the center

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities