Village of Gurnee Public Works, UST System Replacement Project

Closed State & local contract opportunity Posted

Solicitation number
2027-1-0-2027/KP
State
Illinois
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The Village of Gurnee, Illinois is requesting bids for removal and replacement of underground storage tank systems at its Public Works Facility, with bids due July 30, 2026 at 10:00 a.m. CDT and a mandatory pre-bid meeting on July 16, 2026 at 1:00 p.m. at 1151 Kilbourne Road, Gurnee.

The scope encompasses demolition and removal of one 8,000-gallon gasoline UST system, one 6,000-gallon diesel fuel UST system, fuel island infrastructure, concrete and asphalt pavement, soil remediation, and an existing canopy structure from the south side of the facility. Installation work includes one new 12,000-gallon double-wall FRP gasoline UST system, one new 8,000-gallon double-wall FRP diesel fuel UST system, new product piping and dispensers, a raised concrete fuel island, new fuel management system, and new fuel island canopy on the north side. The work is categorized under fuel management services, automatic fueling systems, control devices, meters and dispensers, and fuel system maintenance and repair per NIGP commodity codes.

Three planholders have registered for the bid. The contract is for Fiscal Year 2027. The ITB document does not specify an estimated contract value, set-asides, preference programs, incumbent contractor, evaluation criteria weighting, or pricing terms in the available materials. Electronic plan documents are available through DemandStar.

Opportunity text

The work of this Contract will include the removal of concrete and asphalt pavement, the removal of one (1), 8,000-gallon gasoline UST system, one (1), 6,000-gallon diesel fuel UST system, all fuel island features and the fuel island, soil remediation work, demolition and removal of the existing canopy structure, and other features from the south side of the Village of Gurnee Public Works Facility. The work will also include the installation of one (1), new, 12,000-gallon double-wall FRP gasoline UST system, one (1), new, 8,000-gallon doublewall FRP diesel fuel UST system, with new product piping and dispensers, new raised concrete fuel island, new fuel management system, new fuel island canopy, and other features specified herein at the north side of the Village of Gurnee Public Works Facility.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity