UNC Charlotte
Closed State & local contract opportunity Posted
- Solicitation number
- 287-25000-CB-Rev
- State
- North Carolina
- Responses due
Opportunity facts
Opportunity details come from evp.nc.gov. Updated .
About this opportunity
UNC Charlotte is requesting sealed bids for Stormwater Master Plan Implementation Phase 1, a construction project for stormwater infrastructure improvements across the university campus, with proposals due August 17, 2026 at 2:00 p.m. The pre-bid conference is scheduled for July 20, 2026 at 3:30 p.m. at the FOPS Building, Room 123A, Charlotte, North Carolina.
The scope encompasses design and construction of stormwater control measures including a bioretention cell system (Burson SCM) located on Craver Road adjacent to the Popp-Martin Student Union with integrated hardscape plaza spaces for pedestrian use and educational purposes, along with broader campus stormwater infrastructure improvements, green infrastructure features, best management practices, permeable pavements, retention ponds, and drainage system enhancements to manage runoff and comply with regulatory requirements. Deliverables include engineering assessments, design specifications, construction plans, permitting support, construction administration, project management documentation, and site improvements addressing campus drainage, water quality, and local, state, and federal stormwater compliance.
Single Prime lump-sum bids are required. General contractors must hold an UNLIMITED BUILDING license classification under North Carolina General Statutes Chapter 87, Article 1, except that single prime contractors whose general construction does not exceed 25% of total construction value may hold licenses under Articles 2 and 4 for plumbing, mechanical, or electrical trades. A bid deposit of at least 5% of the proposal amount (cash, certified check, or bid bond executed by a North Carolina-licensed surety) and performance and payment bonds each equal to 100% of contract price are required. All bids are good for ninety days and may not be withdrawn for thirty days after closing. Sealed proposals are delivered to UNC Charlotte Facilities Management at 9151 Cameron Boulevard, Charlotte, NC 28223. Digital plans and specifications are available from McAdams Company and through Construct Connect, Dodge Data & Analytics, and the Metrolina Minority Contractors Association. Payment is ninety-five percent of monthly estimates with final payment upon completion and acceptance.
Opportunity text
Stormwater Master Plan Implementation Phase 1 - Revised
Files
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity