UNCC StormwaterMasterPlanImplementation-Phase 1_25000-CB-Rev.pdf

PDF 182 KB Posted

Attached to
UNC Charlotte
Solicitation number
287-25000-CB-Rev
Issued by
North Carolina

About this file

Summary: UNCC Stormwater Master Plan Implementation Phase 1

This is a Stormwater Master Plan Implementation document for UNC Charlotte in North Carolina. The project focuses on developing and implementing comprehensive stormwater management solutions across the university campus to address environmental compliance, water quality, and campus infrastructure needs. The plan establishes a phased approach to stormwater improvements, with Phase 1 representing the initial implementation phase that addresses priority stormwater management infrastructure, erosion control measures, and drainage system enhancements. The document outlines specific project areas, required improvements, and technical specifications necessary to achieve the university's stormwater management objectives and regulatory compliance requirements.

The document details the scope of work, project deliverables, and implementation requirements for Phase 1 of the stormwater master plan. It includes engineering assessments, design specifications, construction standards, and regulatory compliance measures required for effective stormwater management. The plan identifies funding sources and budget allocations necessary to support the implementation of recommended improvements. The phased approach allows for systematic implementation of stormwater solutions while managing costs and campus operations disruptions. This foundational phase establishes the framework for subsequent implementation phases and demonstrates the university's commitment to environmental stewardship and infrastructure improvements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .