- Adams County Finance Department Purchasing Division is requesting proposals for removal and replacement of approximately 12 feet by 68 feet of non-compliant ADA sidewalks at the Adams County Justice Center in Brighton, Colorado, with proposals due July 31, 2026 at 2:00 p.m. MST and a mandatory pre-proposal meeting and site walk on July 15, 2026 at 10:00 a.m. MST. The scope includes concrete removal, ADA-compliant sidewalk installation, landscaping repairs, sprinkler head relocation and repair,...
- Salt Lake County Parks and Recreation Division is requesting bids on construction of a new concrete trail connection at Hunter Park in West Valley, Utah, with bids due July 22, 2026. The contractor must hold Utah State licenses as an E100 General Engineering Contractor or B100 General Building Contractor, S330 Landscape Contractor, and S260 General Concrete Contractor — mandatory qualifications that filter eligibility. The scope encompasses site preparation, grading, and installation of...
- Millcreek City is requesting sealed bids for Scott Avenue South Sidewalk Improvements (ENG 25-09-02) along Scott Avenue between 700 East and 900 East in Millcreek, Utah, with bids due August 5, 2026. This is a public works project subject to the 2017 Edition Utah APWA Manual of Standard Specifications and Millcreek's Standard Plans for Public Works Construction. The scope includes installation of 600 linear feet of Type A curb and gutter, 3,000 square feet of 4-inch concrete sidewalk, 1,100...
- Summit County, Utah is soliciting competitive sealed bids for the McLeod Creek Bridge Replacement Project, a pedestrian bridge removal and replacement undertaking, with bids due August 5, 2026 and a mandatory pre-bid meeting on July 22, 2026 at 1:00 p.m. The scope encompasses removal and replacement of two existing pedestrian bridges, construction of bridge foundations and associated structural improvements, installation of owner-furnished prefabricated bridge structures, pathway tie-ins,...
- The State of Utah Division of Facilities Construction and Management (DFCM) is soliciting competitive sealed bids for construction of a new Department of Alcoholic Beverage Services (DABS) liquor store in the Quinns Junction area of Park City, Summit County, with bids due August 11, 2026, and a mandatory pre-bid meeting on July 21, 2026. The procurement is restricted to six pre-selected contractors: Big-D, Paulsen, R&O, Sirq, VDS, and Wadman. The project involves construction of...
- The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids on a Stage II construction project at the Matheson Courthouse in Salt Lake City to remove existing landscape and construct an ADA handicap parking area on 500 South, with bids due July 30, 2026 at 3:00 p.m. via the U3P website. Only contractors prequalified under DFCM's Stage I Prequalification for Contractors program and currently listed on the DFCM Prequalified Contractors list as of the solicitation...
- Wasatch County is requesting bids on a 2026 traffic marking paint project involving pavement markings and message painting across multiple locations in Wasatch County, Utah, under ITB NS27-5, with bids due August 11, 2026 at 1:30 p.m. MST and questions due August 10, 2026 at 5:00 p.m. MST through the Utah Procurement Place (U3P-Bonfire) platform. The scope encompasses four bid items: mobilization and demobilization (lump sum), traffic control (lump sum), pavement message paint for directional...
Summit County, Utah is requesting sealed bids on the Trailside Sidewalk Project, an ADA-compliant concrete sidewalk construction in the Snyderville Basin area, with bids due July 30, 2026 at 1:00 p.m. at the Summit County Engineering Office in Coalville. Addendum No. 1, issued July 17, 2026, corrects omitted plan detail sheets (2.C and 2.D); all bidders must acknowledge this addendum in writing and submit the signed acknowledgment with their proposal, or the bid will be rejected. The scope includes excavation, 4-inch colored concrete flatwork (5,941 square feet), colored park-strip sections, curb and gutter (Type M1), ADA-compliant curb ramps per APWA standards 236.2 and 236.3, stamped reinforced concrete crossings (8-inch thick), approximately 180 to 150 linear feet of 12-inch high-density polyethylene storm-drain pipe with catch basins and junction boxes, pedestrian crosswalks with white striping, driveway apron replacements, relocation of driver feedback and flashing beacon signs, metal detectable warning surfaces, and all associated restoration. The bid schedule comprises 25 line items including 1,450 linear feet of curb and gutter and four Rectangular Rapid Flashing Beacon assemblies. Typical sections specify 6-inch untreated base course, 5-foot sidewalk widths with 2-percent slope, and 2.5-foot park strips. All concrete work must meet Class AA (AE) specification with contraction joints not exceeding 12 feet. Traffic control must comply with the Manual on Uniform Traffic Control Devices (MUTCD). Bidders must hold a valid Utah contractor's license and conduct site investigations prior to submission. A bid bond or certified check of at least 5 percent of total bid amount, made payable to Summit County, is required. Upon award, performance and payment bonds equal to the contract amount are required. Substantial completion is targeted for October 1, 2026, with liquidated damages of $560 per working day assessed for non-compliance. Payment is made based on actual work performed and accepted, with mobilization costs tied to project completion milestones. Compliance with UDOT 2027 Standard Specifications and Drawings and equal employment opportunity requirements is mandatory. Questions should be directed to Jacob Harris, Project Engineer, at Jaharris@summitcountyutah.gov.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
3-Trailside Sidewalk 100% Plans.pdf | 12MB | 7/17/26 | ||
2-MEMO Adendum 1.pdf | 81KB | 7/17/26 | ||
1-PW-06-26 Trailside Sidewalk Specs.pdf | 16MB | 7/17/26 |