- Salt Lake County is requesting bids on construction of the Hunter Park Trail Connection, a new concrete trail with site preparation, grading, hardscape installation, and irrigation adjustments at Hunter Park, 3500 S 5905 W, West Valley City, Utah, with bids due July 22, 2026. Bidders must hold Utah State Department of Commerce licensing: a minimum B-100, E-100, or S330 general contractor license, plus S330 landscape contractor and S260 general concrete contractor licenses. All first-tier...
- The City of West Jordan, Utah Public Works Department is requesting bids for the Center Park Drive – 6200 South Trail Construction project (WJPW26070801), with electronic bids due August 6, 2026 at 2:00 p.m. Mountain Time through the Utah Public Procurement Place (U3P). Bidders must hold a Utah General Contractor License classification S260 or S400 at the time of bid submission. No mandatory pre-bid conference or site visit is required, though independent site visits are encouraged. The scope...
- The City of Bountiful, Utah is procuring services for three major infrastructure projects: street improvements, hiking trail construction, and water line replacement. The 2026 Miscellaneous Concrete project involves removal and replacement of existing street improvements including sidewalks, curbs, gutters, drive approaches, waterways, and storm drain facilities at random locations throughout Bountiful City, with an estimated project cost of $1,008,811.35 and substantial completion required by...
- West Valley City, Utah is requesting proposals for the Centennial Park and Sports Complex East Hard Court Improvement Project with proposals due August 12, 2026 at 10:00 a.m. local time, with questions due August 6, 2026. The City offers a 1% preference to bidders physically located within City limits and an additional 1% preference to bidders meeting all criteria including active veteran hiring programs, safety training programs, drug testing protocols, job training programs, health insurance...
- Salt Lake County Facilities Management Division is soliciting bids for post-tension concrete deck surface repair and pit surround metal treatment at the Salt Lake Valley Transfer Station (502 West 3300 South, Salt Lake City, Utah), with bids due July 15, 2026. The Work encompasses all divisions (01 through 33) under a single prime contract. The scope includes repair of the post-tension concrete deck surface and replacement and repair of the pit surround with metal treatment. The Architect is HHY...
- Summit County Lands and Natural Resources in Utah is requesting proposals to rehabilitate an existing rail car bridge crossing East Canyon Creek near Big Bear Hollow along East Canyon Road, with proposals due July 18, 2026, and a mandatory site visit on July 8, 2026 from 9:00 a.m. to 11:00 a.m. (24-hour advance RSVP required). The scope includes railing upgrades, bridge deck replacement using Alaskan Yellow Cedar glulam planks, bearing seat upgrades, concrete abutment backwall modifications,...
- Stansbury Park Service Agency is requesting sealed bids for construction of the SR-36 Sound Wall Trail project in Stansbury Park, Utah, under IFB NS26-166, with bids due July 29, 2026 at 4:00 p.m. A non-mandatory pre-bid conference and site visit will be held July 15, 2026 at 3:00 p.m. at the Service Agency office, 1 Country Club Drive, Suite 1, Stansbury Park. The scope encompasses a 10-foot-wide asphalt trail section (250 feet) extending from Country Club Drive to Village Boulevard,...
- The State of Utah Division of Facilities Construction and Management (DFCM) is requesting bids on a Stage II construction project at the Matheson Courthouse in Salt Lake City to remove existing landscape and construct an ADA handicap parking area on 500 South, with bids due July 30, 2026 at 3:00 p.m. via the U3P website. Only contractors prequalified under DFCM's Stage I Prequalification for Contractors program and currently listed on the DFCM Prequalified Contractors list as of the solicitation...
- The State of Utah Division of Purchasing is requesting bids for reclamation construction at the Sowbelly Gulch Project in Carbon County, Utah, with bids due July 21, 2026 and a mandatory pre-bid meeting and site visit on July 15, 2026 at 10:00 a.m. at Spring Canyon Trailhead in Helper, Utah. Attendance at the entire pre-bid meeting is required for bid eligibility; failure to attend results in bid rejection. Work must commence upon notice to proceed and be completed within 14 calendar days...
Salt Lake County Parks and Recreation Division is requesting bids on construction of a new concrete trail connection at Hunter Park in West Valley, Utah, with bids due July 22, 2026. The contractor must hold Utah State licenses as an E100 General Engineering Contractor or B100 General Building Contractor, S330 Landscape Contractor, and S260 General Concrete Contractor — mandatory qualifications that filter eligibility. The scope encompasses site preparation, grading, and installation of associated hardscape elements including concrete walkways, curb and gutter, asphalt patching, irrigation systems, planting, and sodding. The project includes a Base Bid and three bid alternates: Alternate 1 (concrete walkway), Alternate 2 (concrete walkway with planting), and Alternate 3 (concrete walkway, ADA-compliant ramp, and stairs). All disturbed areas, including landscaping, surfaces, and finishes, must be patched and repaired to match existing conditions. The contractor is responsible for site engineering, construction staking, survey work, permits, utility coordination, and all labor, materials, equipment, and incidentals. The contract begins in May 2026 with completion required by August 28, 2026. Liquidated damages apply for failure to meet the completion deadline. The contractor must attend a pre-construction conference with Salt Lake County Parks and Recreation Division before work commences and shall provide a one-year warranty period following substantial completion, including responsibility for establishing and maintaining all trees and plants during the establishment period. Payment applications must comply with AIA Documents G702 and G703, with a Schedule of Values due within 10 days of the effective contract date. All submittals require approval before fabrication or installation. Site visit is required prior to bidding to determine scope requirements.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
Hunter Park Trail Connection.pdf | 2MB | 7/8/26 |