The Town of Suffield, Connecticut is requesting bids for construction of new sidewalks along Mapleton Avenue, with bids due September 8, 2026 at 10:00 a.m. EDT. The solicitation is open to all vendors with no set-asides or preferences stated.

The scope encompasses approximately 2,200 linear feet of concrete sidewalk construction, driveway paving in areas disturbed by work, and drainage improvements consisting of one catch basin installation, one pipe end, and 50 linear feet of storm drain pipe. The project also requires construction of an approximately 150-foot-long by 2.5-foot-high retaining wall with chain link fencing within the right-of-way and removal and replacement of an existing retaining wall for a driveway turnaround at 400 Mapleton Avenue. Detailed technical specifications and construction details are provided in the bid documents prepared by Town Engineer Dana Steele, PE, and dated March 15, 2023.

No estimated contract value is stated. Payment terms are vendor-specified, with delivery on a Free On Board Destination basis. The primary contact is Bill Hawkins, Town of Suffield, 83 Mountain Road, Suffield CT 06078, 860-668-3848 or bhawkins@suffieldct.gov. The invitation to bid opened August 11, 2026 at 9:30 a.m. EDT.

Opportunity text

The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.