Mapleton Ave Sidewalks Plans Final.pdf

PDF 3 MB Posted

Attached to
Town of Suffield - New Sidewalk along Mapleton Avenue
Solicitation number
38447
Issued by
Hartford County, Connecticut

About this file

This is a bid document set for the Town of Suffield, Connecticut, detailing plans and specifications for the Mapleton Avenue and Thompsonville Road Sidewalk Project (State Project #0170-3513). The project encompasses the construction of approximately 2,200 feet of concrete sidewalks with associated drainage improvements and two retaining walls. The scope includes driveway paving for areas disturbed by construction work, installation of one catch basin, one pipe end, and 50 feet of storm drain pipe, as well as an approximately 150-foot-long by 2.5-foot-high retaining wall with chain link fencing within the right of way. Additionally, the project requires removal and replacement of a retaining wall for a driveway turnaround at 400 Mapleton Avenue. The bid documents are organized into eight sheets, including a location plan and index, existing conditions plans, proposed conditions plans, and notes and details, prepared by Town Engineer Dana Steele, PE, and dated March 15, 2023.

The document set provides comprehensive technical specifications and construction details necessary for bidders to prepare accurate proposals. No specific response deadlines, due dates, bidders' conferences, site visit requirements, award dates, contract terms, pricing information, set-asides, or funding source details are specified within the provided plan sheets. Interested contractors should refer to the accompanying bid advertisement and contract specifications for these administrative and financial requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID DOCUMENTS FOR

MAPLETON AVENUE AND THOMPSONVILLE ROAD SIDEWALK PROJECT

STATE PROJECT # 0170-3513

CONNECTICUT ROUTE 190

SUFFIELD, CONNECTICUT

MARCH 15, 2023

2 AND 3

4 AND 5

6, 7 AND 8

LOCATION PLAN AND INDEX

EXISTING CONDITIONS

PROPOSED CONDITIONS

NOTES AND DETAILS

TOWN OF SUFFIELD, CONNECTICUT

MAPLETON AVENUE AND THOMPSONVILLE

ROAD SIDEWALK PROJECT

STATE PROJECT # 0170-3513

LOCATION PLAN AND INDEX

SHEET 1

TOWN ENGINEER

DANA STEELE, PE

TOWN OF SUFFIELD, CONNECTICUT

MAPLETON AVENUE AND THOMPSONVILLE

ROAD SIDEWALK PROJECT

STATE PROJECT # 0170-3513

EXISTING CONDITIONS

SHEET 2

SHEET 3

MAPLETON AVENUE AND THOMPSONVILLE

ROAD SIDEWALK PROJECT

STATE PROJECT # 0170-3513

EXISTING CONDITIONS

MAPLETON AVENUE AND THOMPSONVILLE

ROAD SIDEWALK PROJECT

STATE PROJECT # 0170-3513

PROPOSED CONDITIONS

SHEET 4

SHEET 5

MAPLETON AVENUE AND THOMPSONVILLE

ROAD SIDEWALK PROJECT

PROPOSED CONDITIONS

SHEET 6

MAPLETON AVENUE AND THOMPSONVILLE

ROAD SIDEWALK PROJECT

NOTES AND DETAILS

SHEET 8

MAPLETON AVENUE AND THOMPSONVILLE

ROAD SIDEWALK PROJECT

STATE PROJECT # 0170-3513

NOTES AND DETAILS

D-401

File details come from the government source that posted it. Updated .