38447_Aug_12_26_solicitation_doc.pdf
PDF 15 KB Posted
- Solicitation number
- 38447
- Issued by
- Hartford County, Connecticut
About this file
This is a solicitation document issued by the Town of Suffield, Connecticut for the construction of new sidewalks along Mapleton Avenue. The project involves approximately 2,200 feet of concrete sidewalk construction, drainage improvements, and two retaining walls. Sidewalk work includes driveway paving in areas disturbed by construction. Drainage improvements consist of one catch basin installation, one pipe end, and 50 feet of storm drain pipe. Retaining wall work includes constructing an approximately 150 feet long by 2.5 feet high retaining wall with chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround at 400 Mapleton Avenue. The invitation to bid opened on August 11, 2026 at 9:30 AM EDT and closes on September 8, 2026 at 10:00 AM EDT. The solicitation is open to all vendors.
The bid documents include the Mapleton Ave Sidewalk Bid Documents Final 8-11-2026.pdf and Mapleton Ave Sidewalks Plans Final.pdf. Delivery terms are Free On Board Destination, and payment terms are vendor specified. No estimated total value is stated in the solicitation. The primary contact for the project is Bill Hawkins at the Town of Suffield, located at 83 Mountain Road, Suffield CT 06078, reachable at 860-668-3848 or bhawkins@suffieldct.gov. The solicitation contains no line items and indicates no vendor questions have been submitted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Mapleton Ave Sidewalk Bid Documents Final 8-11-2026.pdf | ||
| Mapleton Ave Sidewalks Plans Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Number: 38447
Town of Suffield - New Sidewalk along Mapleton Avenue
Invitation to Bid (ITB)
Suffield, Town of
August 11, 2026 - September 08, 2026
Page:2
General Header Information
This bid has no questions defined.
38447
No. 38447 Title: Town of Suffield - New Sidewalk along Mapleton Avenue Start Date: August 11, 2026 at 9:30:00 AM EDT End Date: September 08, 2026 at 10:00:00 AM EDT Vendor Q&A Start Date:
Vendor Q&A End Date:
Estimated Total Value:
Who can respond to this bid? : All Vendors Description: The project involves the construction of approximately 2,200 feet of concrete sidewalks along with drainage improvements and two retaining walls. Sidewalk construction includes: driveway paving as required for areas disturbed by work. Drainage work includes: installation of one catch basin, 1 pipe end and 50 feet of storm drain pipe. Retaining wall includes an approximately 150 feet long by 2.5 feet high retaining wall with a chain link fence within the right of way and removal and replacement of a retaining wall for a driveway turnaround on property of 400 Mapleton Avenue.
Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: Suffield, Town of
Bill Hawkins 83 Mountain Road Suffield CT, 06078 United States Tel: 860-668-3848 Fax:
bhawkins@suffieldct.gov
Contact Details: If you have any questions, please contact:
Bill Hawkins 83 Mountain Road Suffield CT, 06078 United States Tel: 860-668-3848 Fax:
bhawkins@suffieldct.gov
Selected Categories:
Page:3
Documents:
Mapleton Ave Sidewalk Bid Documents Final 8-11-2026.pdf
Mapleton Ave Sidewalks Plans Final.pdf
Page:4
Item Specifications Solicitation has been designated as having no line items.
Page:5
File details come from the government source that posted it. Updated .