SMART Overlay, Bridge Latex Overlay, ADA Improvements, HMA Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- 80D33
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
- Point of contact
-
- IDOT Contracts Office dot.de-contracts@illinois.gov (217) 782-7806
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
The Illinois Department of Transportation (IDOT) District 1 is soliciting bids for a SMART overlay, bridge latex overlay, and ADA improvement project on Illinois Route 83 (Sibley Boulevard) and Illinois Route 1 (Halsted Street) in Cook County, with electronic bids due by 12:00 p.m. on September 18, 2026 through the iCX-Integrated Contractors Exchange system.
The project spans 3.44 miles across Harvey, Dolton, South Holland, and Dixmoor. Scope includes hot-mix asphalt removal, patching, and resurfacing; drainage structure adjustment and cleaning; pavement markings and raised reflective markers; ADA ramps, sidewalk and curb replacement; pedestrian signals and detector loops; hydroscarification; and bridge deck work comprising diamond grinding, joint replacement with strip seals, diaphragm replacement, approach slab repair, and concrete sealing. A stream gauge and relief joint cleaning and sealing are also required. Both routes remain open to traffic during construction. Lane closures on arterial roadways are prohibited during peak traffic hours (6:00 a.m. to 8:30 a.m. and 4:30 p.m. to 6:00 p.m., Monday through Friday); liquidated damages apply for violations.
A Project Labor Agreement is required. Hot-mix asphalt work mandates Performance Graded Asphalt Binder (SBS PG 76-28 or 76-22 depending on application), and all traffic signal work must be performed by personnel holding current IMSA/IPSI Traffic Signal Technician Level II certification. A qualified Hot-Mix Asphalt Level II Quality Control Manager is required. Contractors must coordinate with concurrent IDOT Contracts 80B33 and 62V55 and contact JULIE or DIGGER prior to excavation. Electric facilities must be located at least 72 hours in advance.
The contract is awarded to the lowest responsive and responsible bidder. Contract completion is October 31, 2027, with five working days allowed for cleanup and punch list items. The project is funded entirely with federal-aid funds under the National Highway Performance Program (NHPP) and Surface Transportation Program (STP), designated as Project NHPP-STP-VRJ8(487).
Opportunity text
This is a SMART overlay, bridge latex overlay, and ADA improvement project in which the work to be performed under the contract includes hot-mix asphalt removal, pavement patching, resurfacing with hot-mix asphalt, drainage structure adjustment and cleaning, placement of pavement markings, installation of raised reflective markers, ADA ramps, sidewalk replacement, curb and gutter replacement, pedestrian signals, detector loops, hydroscarification, deck slab repair, diamond grinding, joint replacement with strip seals, replace diaphragms, approach slab repair, concrete sealer, asphalt butt joints, relief joint cleaning sealing, stream gauge, and all incidental and collateral work necessary to complete the project as shown on the plans and described therein. IL 83 and IL 1 will remain open for the duration of the project. Location: Illinois Route 83 (Sibley Boulevard) is a four-lane principal arterial located in the City of Harvey, Village of Dolton, Village of South Holland, Cook County. The west terminus is Oakley Avenue. The east terminus is SN 016-0955. Illinois Route 1 (Halsted Street) is a four-lane principal arterial located in the City of Harvey, Cook County. The south terminus is 149th Street. The north terminus is 146th Street. The project has a gross length of 18,179 ft (3.44 mi) and a net length of 17,424 ft (3.30 mi). The IL 83 and IL 1 corridors are under the jurisdiction of District 1 of the Illinois Department of Transportation (IDOT)