About this opportunity

Millcreek City is requesting sealed bids for Scott Avenue South Sidewalk Improvements (ENG 25-09-02) along Scott Avenue between 700 East and 900 East in Millcreek, Utah, with bids due August 5, 2026. This is a public works project subject to the 2017 Edition Utah APWA Manual of Standard Specifications and Millcreek's Standard Plans for Public Works Construction.

The scope includes installation of 600 linear feet of Type A curb and gutter, 3,000 square feet of 4-inch concrete sidewalk, 1,100 square feet of sidewalk with P curb, 280 linear feet of flare driveway approaches, 1,250 square feet of 6-inch concrete flatwork for driveways, and 680 linear feet of asphalt tie-in, along with relocation and replacement of existing fences, mailboxes, landscaping, and driveway approaches. Work totals 23 line items. Contract time for substantial completion is 60 calendar days from Notice to Proceed, with a punch list period of 30 calendar days after final inspection. Liquidated damages are set at $1,000 per calendar day for late completion.

Bids must be submitted on a unit price basis with bid security of at least 5 percent of the total bid amount as a bid bond or cashier's check. Bidders are not required to be pre-qualified. Award will be made to the lowest qualified, responsible, and responsive bidder. The successful bidder must execute the agreement and submit performance and payment bonds within 10 days of the notice of intent to award. The owner retains 5 percent retainage during construction with discretion to reduce as work nears completion. Design consultant Talisman Civil Consultants is prohibited from serving as a subcontractor.

No pre-bid conference is scheduled. No specific wage-rate payments or payroll submittal is required. Complete bid documents and 100% construction drawings are attached.

Opportunity text

Installation of pedestrian sidewalk, curb and gutter, and relocation and replacement of existing fences, mailboxes, landscaping, driveway approaches, and asphalt tie-ins as show on the plans. Work is located at Scott Avenue between 700 East and 900 East in Millcreek, Utah.