Ice Abrasives for Various Roads

Closed State & local contract opportunity Posted

Solicitation number
26-27
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Evanston, Illinois is requesting bids for restroom and storage renovation at Robert Crown Center (1801 Main Street), Bid 26-27, with electronic submissions due May 19, 2026 at 2:00 p.m. via DemandStar. The City reserves the right to award to an Evanston firm if that firm's bid is within 5% of the low bid, and bidders must comply with the City of Evanston Responsible Bidder Ordinance (1-O-26), which mandates at least 15% of on-site work hours performed by Evanston residents and minimum direct performance of 25% of project services by the named bidder.

The scope includes removal and replacement of restroom partitions, plumbing fixtures, light fixtures, hand dryers, doors and frames, wall material, and outdoor drinking fountain; expansion of men's and women's restrooms through wall relocation; and new polished concrete topping in both restrooms. Plumbing and electrical work is limited to replacement of existing fixtures without load increases; no HVAC modifications are anticipated. The project also includes addition of storage closets and a walk-in freezer. Bidders must provide lump-sum pricing for the base bid plus a $15,000 allowance for general additional work.

The contract award is contingent on substantial completion by October 5, 2026 and final completion by November 6, 2026. A non-mandatory pre-bid meeting is scheduled for April 30, 2026 at 9:00 a.m. at the project site. Bidders must submit a 5% bid bond, with performance and material/labor bonds required at 100% of contract value upon award. Prevailing wage compliance under the Illinois Prevailing Wage Act is mandatory, with monthly certified payroll submissions. Contractors must carry commercial general liability insurance of at least $3 million, automobile liability of $1 million, and workers' compensation coverage. The City maintains a goal of awarding 25% of contracts to M/W/D/EBEs and requires apprenticeship training program enrollment for each construction craft.

Opportunity text

2 versions

Update #2 · Latest ·

Ice Abrasives - The County anticipates using approximately 2,500 tons of ice abrasives during the 2026-2027 winter season.

Update #1 ·

This project includes, but is not limited to the removal and replacement of existing restroom partitions, select plumbing fixtures, light fixtures, hand dryers, doors + frames, restroom wall material, and outdoor drinking fountain. It also includes the expansion of men and womens restrooms by shifting an existing wall as indicated on the drawings, and new polished concrete topping in men and womens restrooms. Plumbing and electrical scope is generally limited to the replacement of existing fixtures without increase in demand loads, and no changes to the existing HVAC system are anticipated.