county of ogle ice abrasives 26-27.pdf
PDF 2 MB Posted
- Attached to
- Ice Abrasives for Various Roads
- Solicitation number
- 26-27
- Issued by
- Cook County, Illinois
About this file
This is a Material Proposal form for ice abrasives submitted by the Ogle County Highway Department in Illinois for the 2026-2027 winter season. The County is soliciting bids for approximately 2,500 tons of ice abrasives to be delivered to the County Yard in Oregon, Illinois. Material must be available for delivery by November 13, 2026, with each delivery comprising no less than 500 tons. Sealed proposals were due at 2:00 PM on September 4, 2026, at the office of the County Engineer located at 1989 South IL Route 2, Oregon, IL 61061. The contract is for local funds and will be awarded by the Ogle County Board. The County reserves the right to order only such quantities of material as required during the season, making the final amount variable based on actual winter conditions and usage needs.
Bidders must submit unit prices and total prices for ice abrasives with delivery to the County Yard, with pricing evaluated on a total bid basis per group. A proposal guaranty check, made payable to the Treasurer of Ogle County, is required in accordance with the BLRS Special Provisions for Bidding Requirements and Conditions for Material Proposals; bid bonds are not allowed. The successful bidder's proposal guaranty check will be held in lieu of a contract bond for the full award amount. The ice abrasives must be comparable to C.A. 15 and C.A. 16 specifications, with specific gradation requirements: percent passing the #16 sieve shall not exceed 4 percent and percent passing the #200 sieve shall not exceed 2.5 percent. Sieve analysis results from stockpiles must be provided one week prior to material delivery commencement, with additional results required for every 1,000 tons delivered. The County Engineer retains final approval authority over gradation specifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| city of evanston BID 26-27 Robert Crown Storage Room Final.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Local Public Agency Material Proposal or Deliver & Install Proposal
Page 1 of 3 BLR 12240 (Rev. 01/19/23)Printed 07/09/26
Material proposal Deliver and Install Proposal Plans
Local Public Agency
Ogle County Highway Department
County
Ogle
Section Number
Proposal Submitted By:
Contractor's Name
Contractor's Address City State Zip Code
STATE OF ILLINOIS
Street Name/Road Name
Various Roads
Type of Funds
Local
For a County and Road District Project
Submitted/Approved
Highway Commissioner Signature & Date
Submitted/Approved
County Engineer/Superintendent of Highways Signature & Date
For a Municipal Project
Submitted/Approved/Passed
Signature & Date
Official Title
Department of Transportation
Released for bid based on limited review
Regional Engineer Signature & Date
Note: All proposal documents, including Proposal Guaranty Checks or Proposal Bid Bonds, should be stapled together to prevent loss when bids are processed.
Jeremy Ciesiel Digitally signed by Jeremy Ciesiel Date: 2026.07.09 07:35:19 -05'00'
Ice Abrasives 26-27
BLR 12240 (Rev. 01/19/23)Page 2 of 3Printed 07/09/26
Local Public Agency
Ogle County Highway Department
County
Ogle
Section Number
NOTICE TO BIDDERS
1. Plans and proposal forms will be available in the office of
The Ogle County Engineer 1989 South IL Route 2, Oregon, IL 61061
2. Prequalification
By Order of
Awarding Authority
The Ogle County Board
County Engineer/Superintendent of Highways/ Municipal Clerk
Material Proposal or Deliver & Install Proposal To
Awarding Authority
The Ogle County Board
If this bid is accepted within 45 days from the date of opening, the undersigned agrees to furnish or to deliver & install any or all of the materials, at the quoted unit prices, subject to the following:
the "Supplemental Specifications and Recurring Special Provisions", adopted Transportation, shall govern insofar as they may be applied and insofar as they do not conflict with the special provision and supplemental specifications attached hereto.
, prepared by the Department of
2. It is understood that quantities listed are approximate only and that they may be increased or decrease as may be needed to properly complete the improvement within its present limits or extensions thereto, at the unit prices stated and that bids will be compared on the basis of total price bid for each group.
3. Delivery in total or partial shipments as ordered shall be made within the time specified in the special provisions or by the acceptance at the point and in the manner specified in the "Schedule of Prices". If delivery on the job site is specified, it shall mean any place or paces on the road designed by the awarding authority or its authorized representative.
4. The contractor and/or local public agency performing the actual material placement operations shall be responsible for providing work zone traffic control, unless otherwise specified in this proposal. Such devices shall meet the requirements of and be installed in accordance with applicable provisions of the "Illinois Manual on Uniform Traffic Control Devices" and any referenced Illinois Highway Standards.
01/01/22
01/01/26
Sealed proposals for the project described below will be received at the office of Name of Office the County Engineer
Address
1989 South IL Route 2, Oregon, IL 61061 until Time
2:00 PM on Date
09/04/26 .
If checked, the 2 low bidders must file within 24 hours after the letting an "Affidavit of Availability" (Form BC 57) in duplicate, showing all uncompleted contracts awarded to them and all low bids pending award for Federal, State, County, Municipal and private work.
One original shall be filed with the Awarding Authority and one original with the IDOT District Office.
3. The Awarding Authority reserves the right to waive technicalities and to reject any or all proposals as provided in BLRS Special Provision for Bidding Requirements and Conditions for Material/Deliver and Install Proposals.
4. A proposal guaranty in the proper amount, as specified in the BLRS Special Provision for Bidding Requirements and Conditions for Material/Deliver and Install Proposals, will be required. See the attached Special Provisions for specific instructions for proposal guaranty for this proposal packet.
5. The successful bidder at the time of execution of the contract will be required to deposit a contract bond or proposal guaranty as provided for in the special provisions. Failure on the part of the contractor to deliver the material within the time specified or to do the work specified herein will be considered just cause to forfeit his surety as provided in Article 108.10 of the Standard Specifications.
6. Proposals shall be submitted on forms furnished by the Awarding Authority and shall be enclosed in an envelope endorsed "Material
Date
1. It is understood and agreed that the "Standard Specifications for Road and Bridge Construction", adopted and
Awarding Authority Address
1989 South IL Route 2
City
Oregon
State
IL
Zip Code
61061
Proposal, Section
BLR 12240 (Rev. 01/19/23)Page 3 of 3Printed 07/09/26
Local Public Agency
Ogle County Highway Department
County
Ogle
Section Number
5. Each pay item should have a unit price and a total price. If no total price is shown or if there is a discrepancy between the product of the unit price multiplied by the quantity, the unit price shall govern. If a unit price is omitted, the total price will be divided by the quantity in order to establish a unit price. A bid will be declared unacceptable if neither a unit price nor a total price is shown.
6. A proposal guaranty in the proper amount, as specified in BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals, will be required. The proposal guaranty as specified in the special provisions is attached.
If a bid bond is allowed or required, Department form BLR 12230 or a proposal guaranty check, complying with the specifications, Treasurer of Ogle CountyCounty
The amount of the check is ( ).
.made payable to:
Attach Cashier's Check or Certified Check Here
In the event that one proposal guaranty check is intended to cover two or more bid proposals, the amount must be equal to the sum of the proposal guaranties which would be required for each individual bid proposal. If the proposal guaranty check is place in another bid proposal, state below where it may be found.
The proposal guaranty check will be found in the bid proposal for: Section Number ).
Discounts will be allowed for payment as follows: calendar days calendar days
Discounts will not be considered in determining the low bidder
Bidder
By Title
City State Zip CodeAddress
Material Proposal Schedule of Prices
BLR 12241 (Rev. 01/19/23)Page 1 of 1Printed 07/09/26
Local Public Agency
Ogle County Highway Department
County
Ogle
Section Number
Material Proposal Schedule of Prices
Group No. Item(s) Delivery Unit Quantity Unit Price Total
1 Ice Abrasives County Yard Ton 2500
Oregon, IL
Additional Tons (if different)
The undersigned firm certifies that it has not been convicted of bribery or attempting to bribe an officer or employee of the State of Illinois, nor has the firm made an admission of guilt of such conduct which is a matter of record, nor has an official, agent, or employee of the firm committed bribery or attempted bribery on behalf of the firm and pursuant to the direction or authorization of a responsible official of the firm. The undersigned firm further certifies that it is not barred from contracting with any unit of State or local government as a result of a violation of State laws prohibiting bid-rigging or bid rotating.
Bidder Signature & Date
Address City State Zip Code
Special Provisions
Page 1 of 1Printed 07/09/26 BLR 11310 (Rev. 10/04/17)
Local Public Agency
Ogle County Highway Department
County
Ogle
Section Number
Ice Abrasives
The following Special Provision supplement the "Standard Specifications for Road and Bridge Construction", adopted
January 1, 2022 , the latest edition of the "Manual on Uniform Traffic Control Devices for Streets and Highways", and the "Manual of Test Procedures of Materials" in effect on the date of invitation of bids, and the Supplemental Specification and Recurring Special Provisions indicated on the Check Sheet included here in which apply to and govern the construction of the above named section, and in case of conflict with any parts, or parts of said Specifications, the said Special Provisions shall take precedence and shall govern.
ICE ABRASIVES
A proposal guaranty in the proper amount, as specified in BLRS Special Provisions for Bidding Requirements and Conditions for Material Proposals (LRS7), will be required. Bid bonds will not be allowed as a proposal guaranty
The successful bidder at the time of execution of the contract will not be required to deposit a contract bond for the full amount of the award. Instead the proposal guaranty check will be held in lieu there of. Failure on the part of the contractor to deliver the material within the time specified or to do the work specified herein will be considered just cause to forfeit their surety as provided in Article 108.10 of the Standard Specifications.
The Aggregate shall be comparable to C.A. 15 and C.A. 16 as specified in the Standard Specifications.
Percent passing the #16 sieve shall not exceed 4%, and percent passing the #200 sieve shall not exceed 2.5%. Results from sieve analyses performed on samples from the stockpiles to be hauled from shall be provided to the Ogle County Highway Department one (1) week prior to the start of material delivery.
Additional sieve analysis results shall be provided for every 1000 tons of material delivered. Quality assurance samples may also be taken by the Highway Department to confirm results. Final approval of gradation shall be by the County Engineer.
The County anticipates using approximately 2,500 tons of ice abrasives during the 2026-2027 winter season. Vendors are hereby notified that the County reserves the right to order only such quantities of material as may be required during the season. Material shall be available for delivery to the County Yard by November 13, 2026. All materials shall be delivered as requested by the County Engineer. Each delivery shall be not less than 500 tons.
26-27
File details come from the government source that posted it. Updated .