Re-Epoxying Apparatus Bay Floor
Closed State & local contract opportunity Posted
- Solicitation number
- 2026-01-0-2026/MG
- State
- Illinois
- Responses due
Opportunity facts
- Jurisdiction
Opportunity details come from constructionbidsource.com. Updated .
About this opportunity
Palos Fire Protection District is requesting proposals for re-epoxying the apparatus bay floor and hallways at its Palos Park facility (8815 W. 123rd Street), with proposals due August 15, 2026 at 4:00 p.m. CDT. The project area totals approximately 2,353 square feet, comprising 2,210 square feet in the engine and ambulance bay and 143 square feet in two hallways.
The scope requires surface preparation via mechanical grinding or shot blasting, removal of contaminants and coatings, crack and joint repair, moisture testing of the concrete substrate, and installation of a multi-layer epoxy system including primer, base coat, optional decorative aggregate or flakes, topcoat or clear protective coat, and slip-resistant additives where specified. The contractor shall provide all labor, materials, tools, equipment, and supervision.
The installed system must resist chemicals, oil, and fuel; provide slip resistance; remain easy to clean and maintain; and meet manufacturer specifications for thickness and curing time. Contractors are responsible for verifying all field dimensions. No set-asides, preferences, prequalification certifications, or incumbent information is specified. No contract value, contract term, pre-bid meeting, or site visit is identified. Eight planholders have registered for bid documents through ConstructConnect, Dodge Data, and ePlan. No bid bond is required.
Opportunity text
1. Project Overview Palos Fire Protection District is seeking proposals from qualified contractors to provide labor, materials, and equipment necessary to install an epoxy flooring system at the facility located at: Project Location: 8815 W. 123rd St. Palos Park, IL 60464 The intent of this project is to install a durable, slip-resistant, high-performance epoxy flooring system designed for heavy traffic, chemical resistance, and long-term durability. 2. Project Scope of Work The contractor shall provide all labor, materials, tools, equipment, and supervision required to complete the epoxy flooring installation, including, but not limited to: Surface Preparation Mechanical grinding or shot blasting of existing concrete surface Removal of contaminants, coatings, grease, or debris Crack and joint repair where necessary Moisture testing of concrete substrate Epoxy Flooring Installation Application of epoxy primer Application of base coat Optional broadcast of aggregate or decorative flakes (if specified) Application of topcoat or clear protective coat Installation of slip-resistant additives where required 3. Performance Requirements The installed flooring system must: Be resistant to chemicals, oil, and fuel Provide slip resistance for safety Be easy to clean and maintain Meet manufacturer specifications for thickness and curing time 4. Project Area Approximate flooring area: Total Square Footage: Existing Surface: Epoxy Areas Included: o Engine/Ambulance Bay- 2,210 sqft o Two Hallways- 143 sqft o Total 2,353 sqft Contractor is responsible for verifying all field dimensions.