About this opportunity

The City of Inglewood Public Works Department is requesting bids on the Queen Park Improvement Project (Invitation #CB 26-18), with bids due June 24, 2026 at 11:00 a.m. PDT and a mandatory pre-bid meeting on June 3, 2026 at 2:30 p.m. PDT at 652 E Queen Street, Inglewood, California.

Contractors must hold either a Class A or Class B license to be eligible. The scope includes constructing a rubberized walking track, installing new irrigation systems, benches, gazebos, and trees, and renovating existing restrooms at One Manchester Boulevard, Inglewood, California 90301. The project will be awarded as a lump-sum contract to a single contractor.

The estimated bid value is $950,000. Bid, payment, and performance bonds are each required at 10 percent of the bid amount. The bid valid period is 750 days.

Questions must be submitted through an online Q&A process with a deadline of June 17, 2026 at 4:00 p.m. PDT. Bids are to be submitted to the City Clerk's Office through the PlanetBids Vendor Portal. Contact Kenrick Sanderlin at 310-412-5685 or ksanderlin@cityofinglewood.org for additional information.

Opportunity text

6 versions

Update #6 · Latest ·

The City of Beaumont requests written responses to a Request for Proposal for Fourth of July Fireworks Display Services from qualified and licensed fireworks display contractors to provide a professionally choreographed, electronically fired, music-synchronized aerial fireworks display as the signature finale of the City's annual Fourth of July Celebration / Freedom Festival. The selected contractor will be one that has demonstrated knowledge and experience to provide the Services and proper state contractors licensing: California State Fire Marshal Public Display Operator License.

Update #5 ·

The Work generally consists of removing the existing mobile generator receptacle, constructing generator concrete pad, installing generator and appurtenances including automatic transfer switch, associated conduits and wiring and modifications to the existing main service switchboard and motor control center as necessary for the new generator.

Update #4 ·

The SGVCOG in cooperation with the City of Pomona has obtained funding through the States Active Transportation Program (ATP) for additional pedestrian- and bicycle-related safety improvements, crossing and intersection improvements, and vehicular roadway traffic calming improvements along Main Street and Palomares Street in the City of Pomona. The SGVCOG has identified potential Active Transportation Program improvements along Main Street and Palomares Street, including at the Union Pacific Railroad crossings within the City of Pomona. SGVCOG desires to retain a Consultant to provide outreach and engineering design services for the improvements described above. The proposed ATP improvements are along Main St. and Palomares St. in the city of Pomona as shown in the attached Appendix E-1. The At-Grade Crossing improvements are also located along Main Street and Palomares Street at the intersection of the Union Pacific Railroad (UPRR) right-of-way and the tracks of UPRR's Alhambra and Los Angeles Subdivisions.

Update #3 ·

The City of Palm Springs is requesting Bids from qualified firms to provide the City with on-call general contractor services for building repairs and renovations.

Update #2 ·

The proposed work shall be performed in accordance with the contract documents, including but not limited to the general conditions, special conditions, technical specifications, contract drawings, permits, and all other reference documents. In general, the work includes, but is not limited to: Complete signalization and installation of new traffic signals at the intersection of Palm Avenue and Oak Valley Parkway; including new signal poles, mast arms, traffic lights, controllers, cabinets, batter back-up system, EVP system, SCE service, traffic loops, and all other associated work as provided in the contract bid docs. Work also includes traffic striping, paving, signage, and modifications to the existing medians and landscaping. Construction coordination will be needed with Edison, Verizon, Spectrum, and Frontier, to remove overhead utilities and SCE poles. The work to be completed is located is at the intersection of Oak Valley Parkway and Palm Avenue in the city of Beaumont, CA.

Update #1 ·

Construct rubberized walking track, install new irrigation, benches, gazebo's, install trees, renovate existing restrooms.