25-046 Power Conduit & Underground 12KV Primary Cable Install
Closed State & local contract opportunity Posted
- Solicitation number
- PE-64750-NONST-2025-000000100
- State
- Georgia
- Responses due
Opportunity facts
- Jurisdiction
- NIGP code
- UNSPSC codes
- Point of contact
-
- Joshua Williams jswilliams@albanyga.gov (229) 431-3211
Opportunity details come from ssl.doas.state.ga.us. Updated .
About this opportunity
The City of Albany, Georgia, is seeking a contractor for Bid #25-046 to provide labor-only services for installing high voltage power conduit and 12KV underground primary cable, replacing existing direct buried cable through directional bore methods. The procurement is specifically for infrastructure replacement, with the City furnishing all power conduit, wire, and termination materials while the contractor will be responsible for installation according to city specifications. The project involves installing approximately 9,800 linear feet of conduit and cable, with work to be completed within a one-year contract term. A mandatory pre-bid conference and site visit is scheduled for February 10, 2025, at 10:00 a.m. at 222 Pine Avenue in Albany, with sealed bids due by March 4, 2025, at 2:30 p.m. Evaluation criteria will focus on the lowest responsive and responsible bidder, with a required 5% bid bond submitted with the bid and 100% performance and payment bonds required from the successful contractor.
The City strongly encourages small business participation and will provide bid preference to local bidders within Albany city limits in the event of tied bids. Contractors must demonstrate capabilities to provide $1 million in general liability insurance, $1 million in auto liability insurance, and $100,000 in workers' compensation coverage. No specific set-aside designations for disadvantaged enterprises are explicitly mentioned, though the emphasis on small business participation suggests openness to diverse bidders. The project requires technical expertise in underground power infrastructure installation, with specific requirements for cable connections, fault indicators, cable tagging, and grounding. While no specific budget range is provided, the comprehensive technical specifications in the addendum documents suggest a significant infrastructure investment focused on modernizing and replacing existing power distribution infrastructure in the Albany area.
Opportunity text
Sealed Bids will be received by the City of Albany, Procurement Division, 222 Pine Avenue, Suite 260, Albany, Georgia 31701, until 2:30 p.m. on March 4, 2025, from a contractor to provide labor only to install high voltage, primary power conduit and 12KV underground primary cable to replace existing direct buried cable. Work will be completed via directional bore method to City of Albany specifications. City of Albany will furnish all power conduit, wire and termination materials that will be installed as per drawings, specifications and work scope.
Files
| File | Type | Posted |
|---|---|---|
| 25_046 Primary Conduit Signed.pdf | ||
| 25_046 Addendum 1.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity