25_046 Addendum 1.pdf
PDF 2 MB Posted
- Solicitation number
- PE-64750-NONST-2025-000000100
- Issued by
- Dekalb County, Georgia
About this file
This is an addendum to bid #25-046 issued by the City of Albany, Georgia for Power Conduit & Underground 12KV Primary Cable Installation. The addendum adds drawings and plans to the bid documents, which include detailed site maps showing underground cable routing and connection details at Westgate Drive and Emily Street locations. The bid opening is scheduled for March 4, 2025 at 2:30 p.m., and the work involves labor-only installation of high voltage primary power conduit and 12KV underground primary cable to replace existing direct buried cable. The technical drawings show single phase padmounted transformer connection details and include specifications for concentric neutral connections, fault indicators, cable tags, and grounding requirements.
The plans include detailed construction assembly specifications labeled as UG6 and UG7, showing proper installation methods for the underground power infrastructure. Technical drawings indicate both primary and secondary connection details, service neutral arrangements, and specific requirements for cable installation. Questions regarding the addendum can be directed to the procurement manager at (229) 431-3211. All other terms and conditions of the original bid remain unchanged.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 25_046 Primary Conduit Signed.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .