25_046 Addendum 1.pdf

PDF 2 MB Posted

Attached to
25-046 Power Conduit & Underground 12KV Primary Cable Install
Solicitation number
PE-64750-NONST-2025-000000100
Issued by
Dekalb County, Georgia

About this file

This is an addendum to bid #25-046 issued by the City of Albany, Georgia for Power Conduit & Underground 12KV Primary Cable Installation. The addendum adds drawings and plans to the bid documents, which include detailed site maps showing underground cable routing and connection details at Westgate Drive and Emily Street locations. The bid opening is scheduled for March 4, 2025 at 2:30 p.m., and the work involves labor-only installation of high voltage primary power conduit and 12KV underground primary cable to replace existing direct buried cable. The technical drawings show single phase padmounted transformer connection details and include specifications for concentric neutral connections, fault indicators, cable tags, and grounding requirements.

The plans include detailed construction assembly specifications labeled as UG6 and UG7, showing proper installation methods for the underground power infrastructure. Technical drawings indicate both primary and secondary connection details, service neutral arrangements, and specific requirements for cable installation. Questions regarding the addendum can be directed to the procurement manager at (229) 431-3211. All other terms and conditions of the original bid remain unchanged.

View the file

Other files

File Type Posted
25_046 Primary Conduit Signed.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .