Orangegate Park Phase 1 Site Improvements

Open State & local contract opportunity Posted

Solicitation number
2026-MPW-241
State
Washington
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from procurement.opengov.com. Updated .

About this opportunity

Pierce County, Washington is requesting bids on Orangegate Park Phase 1 Site Improvements, a 40-acre park development project in the Summit-Waller community north of 84th Street East, with bids due November 4, 2026 at 1:00 p.m. via the OpenGov Procurement Portal. This is a public works project subject to prevailing wage and apprenticeship requirements: a minimum of 15% of labor hours must be performed by apprentices under RCW 39.04.320.

The scope encompasses site demolition, parking lot, ADA nature playground, bioswales and wetland areas, off-leash dog park, park shelters, restroom/maintenance building, soft-surface hiking trails, a safe pedestrian crossing of 84th Street East, and connections to Orangegate Park South and the Pipeline Trail. The contract includes electrical systems with Level 2 EV charging equipment, concrete, asphalt paving, fencing, landscape work, and utility installations for water, sanitary sewer, and storm drainage. Archaeological monitoring is required during clearing, grading, and demolition within a 30-meter buffer zone around site 45PI1615. The bid form requires separate lump-sum pricing for base bid work and six optional items (substitutive alternate picnic shelter and five additive alternates including loop trail, clearing, split rail fencing, and signage). Unit pricing is required for unsuitable soil removal and replacement.

The project estimate is $6 million to $6.7 million, excluding Washington State Sales Tax, which Pierce County will add to payments. The contractor must achieve substantial completion within 310 calendar days of Notice to Proceed and final completion within an additional 30 calendar days. Liquidated damages are $3,529 per calendar day of default. A 5% bid bond and 100% performance and payment bond are required. Awards will be made to the lowest responsive, responsible bidder for the base bid, with Pierce County retaining discretion to award all, some, or none of the alternates. The optional pre-bid walkthrough is October 13, 2026 at 10:00 a.m. at Pipeline Trailhead parking lot (4526 84th St E, Tacoma, WA 98446). Questions are due October 21, 2026 at 4:00 p.m. Bid opening occurs via Zoom 30 minutes after the bid due time.

Opportunity text

Orangegate Park is an approximately 150-acre property that is located in the Summit-Waller community at the intersection of 84th Street East and 46th Avenue East. Pierce County acquired the property from Washington Department of Natural Resources in 1998. The property is split by the Tacoma Water Pipeline and Pipeline Trail as well as 84th Street East. The portion of Orangegate Park south of 84th St East is open to the public and features trailhead parking and walking/equestrian trails.

The focus of this project is to develop the 40 acres north of 84th Street East (Orangegate Park North) utilizing the documents enclosed in the bid package. The northern 40-acres is currently undeveloped forest with user created trails throughout the parcel. When complete, the northern 40-acre parcel will feature elements including but not limited to: ADA nature playground, parking, bioswales and wetland areas, off-lease dog park, park shelters, restroom/maintenance building, soft-surface hiking. Additionally, the project will include a safe pedestrian crossing of 84th Street East and a connection through Orangegate South to the Pipeline Trail.

The work of this project will require close coordination with authorities having jurisdiction as well as with Pierce County, including the Natural Lands team. See the 'background section' for further details on this coordination.