Woodmoor Water & Sanitation District No. 1 (WWSD) in El Paso County, Colorado is requesting sealed bids for the North Outfall Rehabilitation project, with bids due September 3, 2026 at 11:30 a.m. local time at WWSD's office in Monument, Colorado.
The scope includes demolition of existing steel pipe supports, protection of existing ductile iron pipe, installation of new concrete pipe saddles, and coating of exposed pipe. The manhole rehabilitation component encompasses installation of a precast concrete eccentric cone, fiber-reinforced shotcrete placement, concrete surface preparation, and protection of existing pipe penetration and boot. Bids must be submitted on a lump-sum basis. Each bidder must file bid security in the form of a cashier's check, certified check, or bidder's bond. The awarded contractor will be required to furnish a performance bond guaranteeing faithful performance and a labor and material payment bond guaranteeing payment of all debts arising from the work. The contractor assumes sole responsibility for coordinating execution schedules, equipment, and working spaces between onsite contractors, with all project impacts and delays at no additional cost to WWSD.
A non-mandatory pre-bid conference is scheduled for August 13, 2026 at 1:30 p.m. local time at WWSD's office. A notice to proceed is anticipated in September 2026. No bid may be withdrawn for 60 days after the bid opening date. Sealed bids will be opened and read publicly immediately following the deadline. All inquiries must be directed in writing to Kelsey Traxinger at JVA, Incorporated, (303) 951-1035 or ktraxinger@jvajva.com. Bidding documents are available from the Engineer, JVA, Inc.
Opportunity text
The Work will include all necessary labor, supervision, equipment, tools, and materials for the demolition of existing steel pipe supports, protection of the existing ductile iron pipe, installation of new concrete pipe saddles, and coating of exposed pipe, as well as rehabilitation of an existing sanitary sewer manhole. The manhole rehabilitation includes installation of a new precast concrete eccentric cone, fiber-reinforced shotcrete placement, concrete surface preparation, and protection of the existing pipe penetration and boot.