Sacramento County is requesting sealed bids on the replacement of the walk-in refrigeration system at the Main Jail - Hall of Justice located at 651 I Street, with bids due August 27, 2026 at 2:00 PM through the Sacramento County Electronic Bidding Portal. Attendance at a mandatory pre-bid meeting on August 6, 2026 at 1:00 PM is required; bids from contractors who do not attend will be deemed non-responsive.
The scope includes removal of existing compressors and installation of three new water-cooled condenser cabinets, nine evaporators, refrigeration piping, electrical connections, and a roof-mounted fluid cooler. The contractor must furnish temporary walk-in facilities during construction and handle all ancillary work to maintain facility operations. Contractors must hold valid California licenses in General Building (Class B), Low Voltage Systems (C-7), Electrical (C-10), Warm-Air Heating, Ventilating and Air-Conditioning (C-20), and Refrigeration (C-38) classifications. All personnel require background clearance from the Sacramento Sheriff's Department and must comply with facility security protocols, COVID-19 vaccination requirements, and Prison Rape Elimination Act training. Delegated design work for the refrigeration system requires professional engineer seals and Authority Having Jurisdiction approval.
The estimated construction cost is $2,191,818. The contract term is 270 calendar days from commencement, with liquidated damages set at $1,077 per calendar day. Contractors must provide a bid guarantee equal to not less than 10 percent of the aggregate bid amount, and the successful bidder must provide Material and Labor Payment Bonds and a Performance Bond each equal to 100 percent of the contract price. General Aggregate Liability insurance of $4 million is required.
This is an alteration project subject to California prevailing wage requirements under Labor Code section 1771.5 and Title VI non-discrimination provisions. Contractors operating vehicles with a gross vehicle weight rating greater than 8,500 pounds must comply with the California Air Resources Board Advanced Clean Fleets Regulation; the apparent low bidder must submit compliance certificates by 4:00 PM on the Monday following bid opening. Pre-bid questions are due August 13, 2026 by 5:00 PM. Award is expected within 90 calendar days of bid opening.
Opportunity text
The Project includes, without limitation, furnishing all necessary labor, materials, equipment and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in specifications. This Work will be performed in strict conformance with the specifications, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the County.