Contract_4700R_Bid_Set_Construction_Documents.pdf
PDF 24 MB Posted
- Solicitation number
- 4700R
- Issued by
- Sacramento County, San Francisco City, California
About this file
This is a construction document set for Contract 4700, a project by Sacramento County to replace walk-in refrigeration systems at the Main Jail—Hall of Justice located at 651 I Street. The project involves removing seven existing refrigeration compressors and installing three new water-cooled condenser cabinets in the basement, nine evaporators, ancillary components, interconnecting refrigeration piping, electrical connections, and a new fluid cooler on the roof with associated piping. The construction documents are dated January 31, 2026, and are provided at 100% completion level as the bid set. The project scope includes mechanical, electrical, structural, plumbing, and architectural work. Contractor personnel must successfully pass background checks before site access and comply with facility security procedures, including sign-in/sign-out requirements and ID badge protocols. The site is accessible via 6th Street and a basement ramp on the west side of the building, with no permanent parking available; contractors may temporarily park one vehicle in the garage for loading and unloading.
Key technical requirements include compliance with the 2022 California Building Code and related standards, submission of a waste management plan for construction and demolition debris (required for projects exceeding $200,000), and submittal of an Integrated Indoor Air Quality Plan (IIPP), Construction Site Water Pollution Prevention Plan (CSWP), and baseline schedule prior to pre-construction meetings. Special inspections are required for post-installed epoxy anchors, field welding, and high-strength bolting. The refrigeration system selection and sizing constitutes delegated design work to be executed by the installing mechanical contractor, requiring preliminary and final design submittals with professional engineer seals and submission to the Authority Having Jurisdiction for approval. All work must minimize facility disruption, maintain egress routes, and comply with the facility's containment and isolation procedures. The contractor is responsible for coordination among all trades, equipment substitution approvals, dust protection, noise dampening, and sealing of all penetrations. A 72-hour notice is required for utility shutdowns, and 24-hour emergency contact information must be provided.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF
WORK
CONTRACT 4700 651 I STREET
MAIN JAIL - HALL OF JUSTICE -
REPLACE WALK-IN REFRIGERATION SYSTEMS
JANUARY 31, 2026
JOSHUA McLAUGHLIN, FACILITY MANAGER DATE
DOWNTOWN DISTRICT
ADMINISTRATIVE SERVICES
LENA MONTOYA, LIEUTENANT DATE
SACRAMENTO COUNTY SHERIFF
RALEIGH MOYHER, PROJECT MANAGER DATE
ARCHITECTURAL SERVICES DIVISION
ADMINISTRATIVE SERVICES
BRYAN LOW, CHIEF DATE
ARCHITECTURAL SERVICES DIVISION
ADMINISTRATIVE SERVICES
CLAUDIA WADE, CHIEF DATE
COUNTY ENGINEERING DIVISION
COMMUNITY SERVICES
SACRAMENTO COUNTY STANDARD CONSTRUCTION SPECIFICATIONS
ADOPTING THE FOLLOWING CODES WITH AMENDMENTS:
SACRAMENTO COUNTY CODE TITLE 16 BUILDINGS AND CONSTRUCTION
ADOPTING THE FOLLOWING CODES WITH AMENDMENTS:
CALIFORNIA CODE OF REGULATIONS (C.C.R.)
INCORPORATES BY ADOPTION, A PORTION OF THE CALIFORNIA BUILDING
STANDARDS CODE, INCLUDE THE FOLLOWING PARTS WITH ALL ADOPTED
AMENDMENTS: TITLE 24
2022 CALIFORNIA ADMINISTRATIVE CODE (C.A.C.)
THE 2022 EDITION OF THE CALIFORNIA ADMINISTRATIVE CODE, TITLE 24, PART 1,
C.C.R
2022 CALIFORNIA BUILDING CODE (C.B.C)
INCORPORATES BY ADOPTION, BASED ON 2021 INTERNATIONAL BUILDING CODE,
WITH CALIFORNIA AMENDMENTS; TITLE 24, PART 2 C.C.R.
2022 CALIFORNIA ELECTRICAL CODE (C.E.C)
INCORPORATES BY ADOPTION, BASED ON 2020 EDITION OF THE NATIONAL
ELECTRIC CODE OF NATIONAL FIRE PROTECTION ASSOCIATION, WITH CALIFORNIA
AMENDMENTS; TITLE 24, PART 3 C.C.R.
2022 CALIFORNIA MECHANICAL CODE (C.M.C)
INCORPORATES BY ADOPTION, BASED ON 2021 UNIFORM MECHANICAL CODE OF
THE INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS,
WITH CALIFORNIA AMENDMENTS; TITLE 24, PART 4 C.C.R.
2022 CALIFORNIA PLUMBING CODE (C.P.C.)
INCORPORATES BY ADOPTION, BASED ON 2021 UNIFORM PLUMBING CODE OF THE
INTERNATIONAL ASSOCIATION OF PLUMBING AND MECHANICAL OFFICIALS, WITH
CALIFORNIA AMENDMENTS; TITLE 24, PART 5, C.C.R.
2022 CALIFORNIA ENERGY CODE
THE 2022 EDITION OF THE CALIFORNIA ENERGY CODE, TITLE 24 PART 6 C.C.R.
2022 CALIFORNIA FIRE CODE (C.F.C.)
INCORPORATES BY ADOPTION, BASED ON 2021 INTERNATIONAL FIRE CODE, WITH
CALIFORNIA AMENDMENTS; TITLE 24, PART 9, C.C.R.
2022 CALIFORNIA EXISTING BUILDING CODE
INCORPORATES BY ADOPTION, BASED ON 2021 INTERNATIONAL EXISTING
BUILDING CODE, WITH CALIFORNIA AMENDMENTS; TITLE 24, PART 8, 10 & 12, C.C.R.
2022 CALIFORNIA GREEN BUILDING STANDARDS CODE
THE 2022 EDITION OF THE CALIFORNIA GREEN BUILDING STANDARDS CODE, TITLE
24 PART 11 C.C.R.
1. ALL WORK, MATERIALS, ETC..., SHALL CONFORM TO THE COUNTY OF
SACRAMENTO STANDARD CONSTRUCTION SPECIFICATIONS DATED JANUARY 1,
2017, UNLESS NOTED OTHERWISE IN THESE PLANS, CONTRACT DOCUMENTS
OR TECHNICAL SPECIFICATIONS.
2. CONTRACTOR SHALL FOLLOW ALL LOCAL AND STATE LAWS PERTAINING TO
THE CONSTRUCTION OF THIS PROJECT.
3. ANY OTHER APPLICABLE LOCAL, STATE AND FEDERAL CODES, LAWS AND
REGULATIONS. THE MOST RESTRICTIVE REQUIREMENTS SHALL APPLY.
NOTHING IN THESE PLANS AND SPECIFICATIONS SHALL BE CONSTRUED TO
PERMIT WORK NOT CONFORMING TO THESE CODES OR OTHER CODES
APPLICABLE TO THIS PROJECT.
WASTE MANAGEMENT PLAN APPROVAL
CALGREEN PROJECTS (CHS 16.34 AND 6.20 OF COUNTY CODE). ALL NEW
BUILDINGS, FULL DEMOLITIONS, AND ALTERATIONS / REMODELS $200K AND OVER
IN VALUE ARE REQUIRED TO HAVE AN APPROVED WASTE MANAGEMENT PLAN
(WMP) FOR CONSTRUCTION AND DEMOLITION DEBRIS. THE FORM CAN BE FOUND
AT: WWW.WMR.SACCOUNTY.NET/PAGES/CONSTRUCTION-DEMOLITION.ASPX
REQUIREMENTS TO BE MET PRIOR TO SIGN-OFF: WMP SUBMITTED TO
WASTELOG@SACCOUNTY.NET AND APPROVED WHOM CAN SIGN-OFF: BRETT
NICHOLS (CMID); DAVE GHIRARDELLI (DWMR); BUILDING INSPECTION
SUPERVISORS AS NECESSARY OWNING AGENCY: SACRAMENTO COUNTY DWMR
OWNING AGENCY CONTACT INFO: DAVE GHIRARDELLI 875-4049,
WASTELOG@SACCOUNTY.NET
CALGREEN RECYCLING COMPLIANCE (FINAL HOLD)
CALGREEN PROJECTS (CHS 16.34 AND 6.20 OF COUNTY CODE). ALL NEW
BUILDINGS, FULL DEMOLITIONS, AND ALTERATIONS / REMODELS $200K AND OVER
IN VALUE ARE REQUIRED TO HAVE AN APPROVED WASTE MANAGEMENT PLAN
(WMP) FOR CONSTRUCTION AND DEMOLITION DEBRIS. THE FORM CAN BE FOUND
AT: WWW.WMR.SACCOUNTY.NET/PAGES/CONSTRUCTION-DEMOLITION.ASPX
REQUIREMENTS TO BE MET PRIOR TO SIGN-OFF: WMP SUBMITTED TO
WASTELOG@SACCOUNTY.NET AND APPROVED WHOM CAN SIGN-OFF: BRETT
NICHOLS (CMID); DAVE GHIRARDELLI (DWMR); BUILDING INSPECTION
SUPERVISORS AS NECESSARY OWNING AGENCY: SACRAMENTO COUNTY DWMR
OWNING AGENCY CONTACT INFO: DAVE GHIRARDELLI 875-4049,
WASTELOG@SACCOUNTY.NET
SEE SPECIAL PROVISION, DIVISION 01, SECTION 7-8.01 "ALLOWABLE TIMES AND
HOURS OF WORK"
SUCCESSFULLY PASS A BACKGROUND CHECK. ALL CONTRACTOR PERSONNEL
SHALL "SIGN IN" AND "SIGN OUT" AT THE SECURITY CONTROL STATION AND CARRY
AN ID PASS AT ALL TIMES WHILE ON SITE.
THE PROJECT WILL REPLACE THE SEVEN (7) REFRIGERATION COMPRESSORS
LOCATED IN THE RACK WITH (3) NEW WATER COOLED CONDENSER CABINETS
LOCATED IN THE BASEMENT, NINE (9) EVAPORATORS, ANCILLARY COMPONENTS
AND INTERCONNECTING REFRIGERATION PIPING AND ELECTRICAL CONNECTIONS.
ADDITIONALLY, A NEW FLUID COOLER WILL BE INSTALLED ON A LOW ROOF WITH
NEW PIPING TO SERVE THE NEW CONDENSER SECTIONS.
SHEET # SHEET TITLE
G-001 SHEET INDEX, SCOPE OF WORK, SITE PLAN & NOTES
G-002 CALGREEN MANDATORY MEASURES CHECKLIST
SHEET # ARCHITECTURAL DRAWINGS
A-001 ARCHITECTURAL NOTES & ABBREVIATIONS
A-101 OVERALL BASEMENT FLOOR PLAN
A-102 ENLARGED BASEMENT FLOOR PLAN
A-103 ENLARGED BASEMENT FLOOR PLAN
A-201 DETAILS
A-301 DOOR SCHEDULES
SHEET # PLUMBING DRAWINGS
M-001 MECHANICAL LEGEND AND GENERAL NOTES
M-002 MECHANICAL SCHEDULES
M-003 MECHANICAL SCHEDULES
M-100 OVERALL BASEMENT MECHANICAL DEMOLITION PLAN
M-200 OVERALL BASEMENT MECHANICAL PLAN
M-201 ENLARGED BASEMENT MECHANICAL PLAN
M-202 ENLARGED BASEMENT MECHANICAL PLAN
M-203 OVERALL GROUND FLOOR MECHANICAL PLAN
M-204 ENLARGED SECOND FLOOR & ROOF MECHANICAL PLANS
M-205 PARTIAL 10TH FLOOR PLAN MECHANICAL DEMOLITION PLAN
M-401 MECHANICAL SCHEMATICS
M-501 MECHANICAL CONTROLS
M-601 MECHANICAL DETAILS
M-602 MECHANICAL DETAILS
M-603 MECHANICAL DETAILS
M-604 MECHANICAL DETAILS
SHEET # STRUCTURAL DRAWINGS
S-001 GENERAL NOTES
S-002 SYMBOLS AND ABBREVIATIONS
S-202 ENLARGED ROOF PLAN
S-400 STRUCTURAL DETAILS
SHEET # ELECTRICAL DRAWINGS
E-001 ELECTRICAL SHEET INDEX, SYMBOL LIST, ABBREVIATIONS AND NOTES
E-100 BASEMENT FLOOR PLAN - DEMOLITION - ELECTRICAL
E-200 PARTIAL ENLARGED PLANS - REMODEL - ELECTRICAL
E-201 PARTIAL 1ST FLOOR TEMP REFRIGERATOR & FREEZER PLANS
E-501 PARTIAL ONE-LINE POWER DIAGRAMS
E-502 PARTIAL ONE-LINE POWER DIAGRAMS
E-503 (E) MCC-EP1 PARTIAL ON-LINE DIAGRAM, LOAD CALCS & SCHEDULE
E-601 PANEL SCHEDULES AND LOAD CALCULATIONS
E-602 PANEL SCHEDULES AND LOAD CALCULATIONS
1. SITE ACCESS AND PARKING: THE SITE IS ACCESSIBLE THROUGH 6TH STREET
AND A RAMP FROM THE WEST SIDE OF THE BUILDING INTO THE BASEMENT
GARAGE. THERE IS NO PERMANENT PARKING IN THE FACILITY, PARKING MUST
BE SECURED BY THE CONTRACTOR. THE CONTRACTOR MAY TEMPORARILY
PARK ONE VEHICLE IN THE GARAGE FOR LOADING AND UNLOADING TOOLS,
MATERIALS AND EQUIPMENT. CONTRACTOR VEHICLE MUST BE MOVED OUT OF
THE GARAGE ONCE LOADING/UNLOADING IS COMPLETE.
2. SECURITY BACKGROUND CHECKS: THE JAIL BUILDING IS A SECURED FACILITY.
EACH WORKER SHALL SUCCESSFULLY PASS A BACKGROUND CHECK. BEFORE
BEING ALLOWED INTO THE FACILITY. ALL CONTRACTOR PERSONNEL SHALL
"SIGN IN" AND "SIGN OUT" AT THE SECURITY CONTROL STATION AND CARRY AN
ID PASS AT ALL TIMES WHILE ON SITE.
3. ALL PERSONNEL AND VEHICLES ACCESSING THE SITE WILL BE SUBJECT TO
SEARCH. THE CONTRACTOR SHALL MAINTAIN AN INVENTORY OF ALL TOOLS
BROUGHT ONTO SITE AND SHALL KEEP THE TOOLS AND MATERIALS SECURED.
4. CONTRACTORS SHALL NOT WEAR COLOR TEES OR OTHER ARTICLES OF
CLOTHING THAT MATCH INMATES APPAREL. HOODIES AND BALL CAPS SHALL
NOT BE WORN WHILE ON SITE.
5. CONTRACTOR SHALL ONLY TAKE DIRECTION, VERBALLY OR WRITTEN, FROM
COUNTY OF SACRAMENTO, CONSTRUCTION MANAGEMENT AND INSPECTION
DIVISION (CMID) CONSTRUCTION MANAGER, RESIDENT ENGINEER, AND
PROJECT INSPECTOR.
6. ALL CORRESPONDENCES (RFI, SUBMITTAL, CORRESPONDENCE) SUBMITTED TO
CMID. CMID WILL DESIGNATE CONTACT PERSON AT PRE-CONSTRUCTION
MEETING.
7. IIPP, CSWP, CSSP, TSSP, AND 24 HOUR EMERGENCY LIST MUST BE SUBMITTED
AND APPROVED BEFORE CONTRACTOR CAN MOBILIZE ON SITE.
8. BASELINE SCHEDULE SHALL BE SUBMITTED BEFORE PRE-CONSTRUCTION
MEETING CAN BE SCHEDULED.
9. 72 HOUR NOTICE IS REQUIRED FOR ALL UTILITY SHUTDOWNS. 72 HOUR NOTICE
TEMPLATE WILL BE SUBMITTED TO CONTRACTOR AT THE PRE-CONSTRUCTION
MEETING.
N
SCALE:
N
- R&A ENGINEERING SOLUTION, INC.
MECHANICAL ENGINEERING (PRIME)
HAROLD HOUGHAM,
MECHANICAL ENGINEER
TEL: (916) 920-5965
601 UNIVERSITY AVE., SUITE 255
SACRAMENTO, CA. 95825
ELECTRICAL ENGINEERING CONSULTANT
YVETTE VAN ZANTEN,
ELECTRICAL ENGINEER
TEL: (916) 923-4400
100 HOWE AVE.
SACRAMENTO, CA. 95825
- M. NEILS ENGINEERING INC.
STRUCTURAL ENGINEERING CONSULTANT
DEVON LUMBARD,
STRUCTURAL ENGINEER
3001 E STREET
SACRAMENTO, CA 95816
TEL: (916) 418-9100
3001 E STREET.
SACRAMENTO, CA 95816
- DEGENKOLB ENGINEERS
NONE
NONE
APPLICABLE CODES DRAWING INDEX APPROVALS
PROJECT LOGISTICS
SECURITY BACKGROUND CHECKS
WORKING HOURS - RESTRICTIONS
PROJECT LOCATION MAP
PROJECT VICINITY MAP
PROJECT SCOPE
SCALE:
CONSULTANTS
WASTE MANAGEMENT SUBMITTAL
FOR PROJECT OVER $200,000 ONLY
1. THE WORK MUST BE PERFORMED AND COMPLETED ACCORDING TO THE
CONTRACT DOCUMENTS. THE CONTRACT DOCUMENTS PROVIDE THE DETAILS
FOR COMPLETING THE WORK IN ACCORDANCE WITH THE TERMS OF THE
CONTRACT.
2. THE CONTRACTOR MUST DO ALL OF THE WORK AND FURNISH ALL LABOR,
MATERIALS, TOOLS, EQUIPMENT, AND APPLIANCES, NECESSARY OR PROPER,
FOR PERFORMING AND COMPLETING THE WORK, INCLUDING CHANGE ORDER
AND DISPUTED WORK DIRECTED BY THE AGENCY IN CONFORMITY WITH THE
TRUE MEANING AND INTENT OF THE CONTRACT.
3. THE CONTRACT DOCUMENTS ARE COMPLEMENTARY, AND WHAT IS REQUIRED
BY ANY ONE SHALL BE AS BINDING AS IF REQUIRED BY ALL. THE INTENT OF
THE CONTRACT DOCUMENTS IS TO INCLUDE ALL ITEMS NECESSARY FOR THE
PROPER EXECUTION AND COMPLETION OF THE WORK. WORK NOT COVERED
IN THE CONTRACT DOCUMENTS WILL NOT BE REQUIRED UNLESS IT IS
CONSISTENT THEREWITH OR IS REASONABLY INFERABLE WHEREFROM AS
BEING NECESSARY TO PRODUCE THE INTENDED RESULTS. WORDS AND
ABBREVIATIONS WHICH HAVE WELL-KNOWN TECHNICAL OR TRADE MEANINGS
ARE USED IN THE CONTRACT DOCUMENTS IN ACCORDANCE WITH SUCH
RECOGNIZED MEANINGS UNLESS OTHERWISE SPECIFICALLY DEFINED
HEREIN.
4. THE ORGANIZATION OF THE SPECIFICATIONS INTO DIVISION, SECTIONS AND
ARTICLES, AND THE ARRANGEMENT OF THE DRAWINGS SHALL NOT CONTROL
THE CONTRACTOR IN DIVIDING THE WORK AMONG SUBCONTRACTORS OR IN
ESTABLISHING THE EXTENT OF WORK TO BE PERFORMED BY ANY TRADE.
5. IF ANY PORTION OF THE CONTRACT DOCUMENTS SHALL BE IN CONFLICT WITH
ANY OTHER PORTION, THE VARIOUS DOCUMENTS COMPRISING THE
CONTRACT DOCUMENTS SHALL GOVERN IN THE ORDER OF PRECEDENCE AS
HEREIN SET FORTH ACCORDING TO THEIR LATEST DATE OF EXECUTION;
A. WRITTEN AMENDMENT TO THE CONTRACT AGREEMENT, THE CONTRACT
AGREEMENT AND ADDENDA;
B. THE SPECIFICATION TAKE PRECEDENCE OVER DRAWINGS FOR THE
SPECIFIC TYPE OR QUALITY OF MATERIALS OR THE QUALITY OF
INSTALLATION;
C. THE DRAWINGS TAKE PRECEDENCE OVER THE SPECIFICATIONS WITH
REGARD TO QUANTITIES, LOCATIONS OR DETAIL OF INSTALLATION;
D. AS BETWEEN SCHEDULES AND GENERAL NOTES GIVEN ON DRAWINGS,
THE GENERAL NOTES SHALL TAKE PRECEDENCE;
E. AS BETWEEN GENERAL NOTES GIVEN ON DRAWINGS AND SPECIFIC,
DETAILED NOTES, THE LATTER SHALL TAKE PRECEDENCE;
F. AS BETWEEN LARGE-SCALE DRAWINGS AND SMALL-SCALE DRAWINGS,
THE LARGER SCALE SHALL TAKE PRECEDENCE.
G. SPECIFICATIONS HAVING GREATER DETAIL OR SPECIFICITY; AND DETAILS
TAKE PRECEDENCE OVER GENERAL DRAWINGS.
6. ANY MATERIAL OR OPERATION SPECIFIED BY REFERENCE TO PUBLISHED
SPECIFICATIONS OF A MANUFACTURER, A SOCIETY, AN ASSOCIATION, A
CODE, OR OTHER PUBLISHED STANDARD, SHALL COMPLY WITH
REQUIREMENTS OF THE LISTED DOCUMENT WHICH IS CURRENT ON DATE OF
RECEIPT OF BIDS. IN CASE OF A CONFLICT BETWEEN REFERENCED
DOCUMENT AND PROJECT SPECIFICATIONS, PROJECT SPECIFICATIONS SHALL
GOVERN. IN CASE OF A CONFLICT BETWEEN REFERENCED DOCUMENTS, THE
ONE HAVING MORE STRINGENT REQUIREMENTS SHALL GOVERN. NO EXTRA
COMPENSATION WILL BE ALLOWED FOR ANYTHING OMITTED BUT
REASONABLY AND FAIRLY IMPLIED.
7. DURING THE COURSE OF THE WORK, IF THE CONTRACTOR DISCOVERS
DISCREPANCIES, ERRORS, OR OMISSIONS BETWEEN THE CONTRACT
DRAWINGS AND CONDITIONS IN THE FIELD, OR ERRORS OR OMISSIONS IN THE
CONTRACT DRAWINGS, THE SPECIFICATIONS THE CONTRACTOR MUST
INFORM THE AGENCY IMMEDIATELY, AND THE AGENCY WILL PROMPTLY
VERIFY THE SAME. WORK DONE AFTER DISCOVERY, UNTIL AUTHORIZED BY
THE AGENCY, IS DONE AT THE CONTRACTOR'S RISK.
1. THE CONTRACTOR MUST FURNISH ALL WORKING DRAWINGS, PLANS,
SPECIFICATIONS, DESCRIPTIVE DATA, CERTIFICATES, SAMPLES,
TESTS, METHODS, SCHEDULES, AND MANUFACTURER'S
INSTRUCTIONS REQUIRED BY THE CONTRACT, AND ANY OTHER
INFORMATION NECESSARY TO DEMONSTRATE THAT THE MATERIALS
AND EQUIPMENT TO BE FURNISHED AND THE METHODS OF WORK
COMPLY WITH THE PROVISIONS AND INTENT OF THESE CONTRACT
DOCUMENTS. UNLESS NOTED OTHERWISE, SUBMITTALS MUST BE
SUBMITTED IN A TIMELY MANNER THAT ALLOWS FOR ADEQUATE
REVIEW TIME. SUBMITTALS MUST BE ACCOMPANIED BY A SUBMITTAL
TRANSMITTAL FORM.
2. SUBMITTALS FOR SYSTEMS MUST BE IN ONE PDF AND MUST INCLUDE
ALL INFORMATION FOR THE SYSTEM.
3. UNLESS OTHERWISE NOTED, THE CONTRACTOR MUST FURNISH
ELECTRONIC COPIES OF ALL SUBMITTALS. THE CONTRACTOR MUST
FURNISH, 4 SAMPLES WHERE COLOR, PATTERN, TEXTURE OR SIMILAR
CHARACTERISTICS ARE REQUIRED TO BE SELECTED FROM THE
MANUFACTURER'S PRODUCT LINE OF WHICH THE COUNTY WILL
RETURN 1 COPY WITH OPTION SELECTED.
4. IF THE INFORMATION FURNISHED IN A SUBMITTAL SHOWS ANY
DEVIATION FROM THE CONTRACT REQUIREMENTS, THE CONTRACTOR
MUST, BY A STATEMENT IN WRITING ACCOMPANYING THE
INFORMATION, ADVISE THE COUNTY OF THE DEVIATION AND STATE
THE REASONS. IF THE CONTRACTOR FAILS TO PROVIDE A STATEMENT
CLEARLY IDENTIFYING DEVIATIONS FROM THE CONTRACT, THE
COUNTY MAY VOID THE ENTIRE SUBMITTAL, AND THE COST OF ANY
ACTION TAKEN BY THE COUNTY AS A RESULT OF THE CONTRACTOR
FAILING TO CLEARLY IDENTIFY AND JUSTIFY DEVIATIONS WILL BE
BORNE BY THE CONTRACTOR.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THERE IS NO
CONFLICT WITH OTHER SUBMITTALS AND TO NOTIFY THE COUNTY IF
THE CONTRACTOR'S SUBMITTAL MAY CONCERN WORK BY ANOTHER
CONTRACTOR(S) OR THE COUNTY. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR COORDINATION OF SUBMITTALS AMONG ALL
CRAFTS AND SUBCONTRACTORS PERFORMING THE WORK. THE
CONTRACTOR MUST VERIFY THAT ITS SUBCONTRACTORS'
SUBMITTALS ARE COMPLETE IN EVERY WAY AND MEET THE
REQUIREMENTS OF THE CONTRACT.
6. THE COUNTY APPROVAL OF THE CONTRACTOR'S SUBMITTALS DOES
NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITY FOR ERRORS OR
OBLIGATION FOR ACCURACY OF DIMENSIONS AND DETAILS,
AGREEMENT WITH AND CONFORMITY TO THE CONTRACT, OR
COMPLETING THE CONTRACT AS PRESCRIBED, NOR WILL APPROVAL
BE CONSIDERED APPROVAL OF A DEVIATION OR CONFLICT UNLESS
THE COUNTY HAS BEEN EXPRESSLY ADVISED OF, AND HAS
EXPRESSLY APPROVED, THE DEVIATION OR CONFLICT.
7. THE CONTRACTOR MUST NOT MAKE CHANGES TO A SUBMITTAL
AFTER IT HAS BEEN APPROVED, AND THE EQUIPMENT OR MATERIALS
MUST NOT DEVIATE EXCEPT WITH WRITTEN APPROVAL BY THE
COUNTY. FABRICATION OR OTHER WORK PERFORMED IN ADVANCE
OF APPROVAL, UNLESS DIRECTED BY THE COUNTY IN WRITING, IS AT
THE CONTRACTOR'S RISK.
PRECEDENCE OF DRAWINGS SUBMITTALS REQUIREMENTS
SPECIAL INSPECTION REQUIRED
POST INSTALLED EPOXY ANCHORS, FIELD WELDING,
HIGH STRENGTH BOLTING. REFER TO STRUCTURAL
DRAWINGS AND SUPPLEMENTAL ST-16 FORM
NO GRADING PROPOSED
NO GRADING PROPOSED WITH BUILDING PERMIT -
IMPORT/EXPORT FILL IS NOT ALLOWED WITH THIS
PERMIT.
DELEGATED DESIGN / DEFERRED
APPROVAL
REFRIGERATION SYSTEM SELECTION AND SIZING
IS A DELEGATED DESIGN TO BE EXECUTED BY THE
INSTALLING MECHANICAL CONTRACTOR. WORK
OUTLINED IN THESE DOCUMENTS REFLECT THE
DESIGN INTENT. REFER TO SHEET M001 FOR THE
DELEGATED DESIGN PROCEDURES.
BUILDING DEPARTMENT APPROVAL
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
G-001
SHEET INDEX,
SCOPE OF WORK,
SITE PLAN & NOTES
MATT OWENS, DEPUTY CHIEF
RE 651 I STREETCONTRACT 4700 651 I STREETRE 651 I STREET
RECONTRACT 4700RE
6/3/2026
CLAUDIA WADE, P.E.
COUNTY ENGINEER
Docusign Envelope ID: 5C24F9EF-2FFC-826C-80A5-877463F79609
6/16/2026
6/16/2026
6/16/2026
6/16/2026
6/16/2026
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
G-002
CALGREEN MANDATORY
MEASURES CHECKLIST
CONTRACT 4700RE
6/3/2026
Docusign Envelope ID: 5C24F9EF-2FFC-826C-80A5-877463F79609
MECHANICAL LEGEND
ABBREVIATIONS
PIPING
PIPES
RL
RS
CONTROLS
GENERAL
AC ABOVE CEILING
AD ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ARCH ARCHITECT
BHP BRAKE HORSEPOWER
BOP BOTTOM OF PIPE
BTUH BRITISH THERMAL UNIT PER HOUR
BV BUTTERFLY VALVE
CA COMPRESSED AIR
CD CONDENSATE DRAIN
CFM CUBIC FEET PER MINUTE
CU CONDENSING UNIT
DET DETAIL
DIA DIAMETER
DN DOWN
DWG DRAWING
(E) EXISTING
(ER) EXISTING RELOCATED
EAT ENTERING AIR TEMPERATURE
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
FA FROM ABOVE
FB FROM BELOW
FCU FAN COIL UNIT
FLR FLOOR
FPM FEET PER MINUTE
FS FLOW SWITCH
FT FEET
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
HP HORSEPOWER
HVAC HEATING VENTILATION & AIR
CONDITIONING
IWC INCHES OF WATER COLUMN
KW KILOWATTS
LAT LEAVING AIR TEMPERATURE
LBS POUNDS
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH 1,000 BRITISH THERMAL UNITS PER
HOUR
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
(N) NEW
NC NORMALLY CLOSED
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NIC NOT IN CONTRACT
NO NORMALLY OPEN
NO NORMALLY OPEN
NPW NON-POTABLE WATER
NTS NOT TO SCALE
OC ON CENTER
PH PHASE
PLBG PLUMBING
POC POINT OF CONNECTION
POD POINT OF DISCONNECT
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH
GAUGE
RH RELATIVE HUMIDITY
RL REFRIGERANT LIQUID
RM ROOM
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTS REFER TO SPECIFICATIONS
SCH SCHEDULE
SHT SHEET
SM SHEET METAL
SQ FT SQUARE FOOT
SS, SST STAINLESS STEEL
TA TO ABOVE
TB TO BELOW
TSTAT THERMOSTAT
TH THERMOMETER
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UF UNDER FLOOR
UON UNLESS OTHERWISE NOTED
V VOLTS
WB WET BULB TEMPERATURE
W/ WITH
W/O WITHOUT
WT WEIGHT
NEW PIPE
EXISTING PIPE
PIPE TO BE DEMOLISHED
CONDENSER WATER RETURN
CONDENSER WATER SUPPLY
REFRIGERANT LIQUID
REFRIGERANT SUCTION
FLOW DIRECTION
DOMESTIC COLD WATER - DCW
VENT - V
SANITARY WASTE - W
DIFFERENTIAL
PRESSURE SWITCH
PRESSURE GAUGE
THERMOMETER
VARIABLE
FREQUENCY DRIVE
PRESSURE SWITCH
TEMPERATURE
SENSOR
MOTORIZED VALVE
PIPE FITTINGS
VALVES CONTINUED
PIPE RISE/ELBOW UP
PIPE DROP/ELBOW DOWN
PIPE RISE/DROP TOP
CONNECTION
PIPE RISE/DROP BOTTOM
CONNECTION
FLANGE CONNECTION
UNION CONNECTION
CAPPED PIPE
REDUCER
CONTROL VALVE 2-WAY
CONTROL VALVE 3-WAY
CHECK VALVE, DIRECTION
CIRCUIT SETTER VALVE
PETE'S PLUG
PRESSURE REDUCING VALVE
SHUT-OFF VALVE
STRAINER / WITH DRAIN VALVE
AND HOSE END CONNECTION
VFD
DPS
PS
T1
VALVES
AIR VENT (AUTOMATIC / MANUAL)
AUTOMATIC MOTORIZED VALVE
BACKFLOW PREVENTOR
BALANCING VALVE
BALL VALVE
BELLOWS FLEX CONNECTOR
BRAIDED FLEX CONNECTOR
BUTTERFLY VALVE
NEW WORK SHEET NOTE
DEMOLITION SHEET NOTE
PHOTO SHEET NOTE
REVISION DELTA
EQUIPMENT TYPE
EQUIPMENT NUMBER
DETAIL NUMBER
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
NORTH ARROW
N
EQ
M1
M1
CWR
CWS
1. CONTRACTOR SHALL VISIT SITE TO REVIEW SCOPE OF WORK PRIOR TO SUBMISSION OF BID.
2. DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED TO DETERMINE EXACT PLACEMENT OF NEW WORK. VERIFY ALL DIMENSIONS AND CONDITIONS IN THE FIELD BEFORE PROCEEDING WITH WORK.
EXACT PLACEMENT SHALL BE COORDINATED BASED ON ACTUAL FIELD MEASUREMENTS AND CONDITIONS.
3. COORDINATE REQUIREMENTS OF NEW WORK WITH OTHER TRADES AND PROVIDE ALL NECESSARY APPURTENANCES AND INCIDENTAL LABOR, INCLUDING PARTS AND ACCESSORIES, CONNECTIONS, SYSTEM START-UP AND TESTING AS REQUIRED TO ACHIEVE A COMPLETE FULLY FUNCTIONING INSTALLATION READY FOR OPERATION.
4. PRIOR TO FABRICATION, CONTRACTOR SHALL PREPARE FULLY COORDINATED DETAILED SHOP DRAWINGS (DRAWN TO SCALE) OF ALL PROJECT WORK AND SUBMIT TO THE OWNER'S REPRESENTATIVE FOR REVIEW AND APPROVAL. SHOP DRAWINGS SHALL INCLUDE DETAILED PLAN VIEW LAYOUTS (1/4" SCALE MINIMUM) SHOWING EQUIPMENT, DUCTWORK AND PIPING WITH DUCT AND PIPE SIZES AND
ELEVATIONS ABOVE FINISHED FLOOR. COORDINATE WORK WITH OTHER TRADES.
5. AVOID ROUTING PIPING ABOVE ELECTRICAL EQUIPMENT AND CABLE TRAYS. WHERE INSTALLATION OF PIPING ABOVE ELECTRICAL EQUIPMENT OR CABLE TRAYS IS UNAVOIDABLE, INSTALL PIPING WITH A MINIMUM NUMBER OF JOINTS. JOINTS, FITTINGS, VALVES OR SIMILAR COMPONENTS SHALL BE LOCATED A MINIMUM OF 36 INCHES FROM EACH SIDE OF EQUIPMENT OR TRAY. PROVIDE DRIP PAN(S) WITH
MOISTURE DETECTION ABOVE CRITICAL EQUIPMENT.
6. ALL WORK SHALL COMPLY WITH THE CALIFORNIA CODE OF REGULATIONS, TITLE 24 (2022 EDITION), INCLUDING THE CALIFORNIA BUILDING CODE (CBC), CALIFORNIA MECHANICAL CODE (CMC), CALIFORNIA PLUMBING CODE (CPC), CALIFORNIA FIRE CODE (CFC), CALIFORNIA GREEN BUILDING STANDARDS CODE, CALIFORNIA ENERGY CODE AND CALIFORNIA ELECTRICAL CODE.
7. ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THE GENERAL CONDITIONS OF THE PRIME CONTRACT.
8. CONSTRUCTION SHALL BE ORGANIZED IN SUCH A MANNER AS TO MINIMIZE DISRUPTION TO FACILITY OPERATIONS AND DISTURBANCE OF OCCUPANTS. NOTIFY OWNER'S REPRESENTATIVE IN ADVANCE OF ANY REQUIRED SYSTEM SHUTDOWNS, DISTURBANCE OF OR ENCROACHMENT INTO OCCUPIED AREAS. REFER TO COUNTY SHUTDOWN SPECIFICATIONS IN SECTION 7 OF THE SACRAMENTO COUNTY STANDARD CONSTRUCTION SPECIFICATIONS. PERFORM ACTIVITIES SUCH AS MASONRY DRILLING AND SAWCUTTING ONLY DURING DESIGNATED HOURS; DAMPEN NOISE AND VIBRATION TRANSMITTED TO OCCUPIED AREAS TO THE GREATEST EXTENT POSSIBLE. MAINTAIN EGRESS FROM OCCUPIED AREAS AT ALL TIMES. DO NOT OBSTRUCT OR OTHERWISE IMPEDE PEDESTRIAN OR VEHICULAR TRAFFICWAYS
CRITICAL TO THE ONGOING OPERATION OF THE FACILITY.
9. CONTRACTOR SHALL COMPLY WITH THE FACILITY'S POLICIES AND PROCEDURES REGARDING CONTAINMENT /ISOLATION OF CONSTRUCTION AREAS AND ACTIVITIES THROUGHOUT CONSTRUCTION OF THE PROJECT. PROVIDE DUST PROTECTION, CONSTRUCTION BARRIERS, AND /OR FILTRATION ON HVAC SYSTEM INLETS AS REQUIRED TO PROTECT OCCUPIED AREAS AND AFFECTED HVAC SYSTEMS FROM CONTAMINATION BY AIRBORNE POLLUTANTS (INCLUDING DUST, SMOKE, FUMES AND ODORS) GENERATED BY CONSTRUCTION ACTIVITIES.
10. MEANS, METHODS AND TIMING OF WORK SHALL BE COORDINATED WITH AND APPROVED BY THE OWNER'S REPRESENTATIVE INSOFAR AS THEY AFFECT FACILITY OPERATIONS. MEANS AND METHODS ARE STILL SUBJECT TO ACCEPTANCE BY THE AUTHORITY HAVING JURISDICTION AND MUST COMPLY WITH DESIGN AND CODE INTENT.
11. PIPE, DUCT AND CONDUIT GRAVITY SUPPORTS AND BRACING: NEW PIPES, DUCTS, AND CONDUIT SHALL BE SUPPORTED AND BRACED PER THE REQUIREMENTS OF THE 2022 CBC, CMC AND CPC.
12. REFER TO STRUCTURAL DRAWINGS FOR SEISMIC CRITERIA.
13. THE EQUIPMENT MANUFACTURERS AND MODELS SPECIFIED ON THE DRAWINGS SERVE AS THE BASIS OF DESIGN. NO SUBSTITUTIONS OF ANY EQUIPMENT ARE ALLOWED WITHOUT FIRST OBTAINING APPROVAL FROM THE OWNER'S REPRESENTATIVE. ANY PROPOSED SUBSTITUTIONS MUST MATCH THE PHYSICAL CONFIGURATION AND REQUIREMENTS OF THE SPECIFIED MODEL INCLUDING OVERALL DIMENSIONS, INLET AND OUTLET CONFIGURATION, REQUIRED CLEARANCES, ACCESS AND POWER REQUIREMENTS; AND MUST MEET SEISMIC CERTIFICATION REQUIREMENTS WHERE MANDATED BY THE AUTHORITY HAVING JURISDICTION. PERFORMANCE FEATURES AND CONSTRUCTION OF ANY PROPOSED SUBSTITUTION SHALL MEET OR EXCEED THOSE SPECIFIED ON THE DRAWINGS AND IN THE SPECIFICATIONS. STRUCTURAL ENGINEERING CALCULATIONS FOR EQUIPMENT SUPPORT AND ANCHORAGE SHALL BE SUBMITTED BY THE CONTRACTOR AT THE TIME OF SUBMITTAL OF ANY SUBSTITUTION FOR REVIEW BY THE COUNTY, MECHANICAL AND STRUCTURAL ENGINEERS OF RECORD. SUBSTITUTIONS REQUIRING CHANGES TO THE CONTRACT DOCUMENTS BY MEANS OF A CHANGE ORDER ARE NOT
ALLOWED.
14. WHERE EXISTING UTILITIES NOT SHOWN ON THE DRAWINGS ARE ENCOUNTERED, NOTIFY OWNER'S REPRESENTATIVE IMMEDIATELY. SUPPORT AND PROTECT UTILITIES UNTIL PROVISIONS CAN BE MADE FOR
RELOCATION OR OTHER SOLUTION.
15. CUTTING AND DEMOLITION WORK SHALL NOT COMPROMISE STRUCTURAL INTEGRITY OF THE EXISTING CONSTRUCTION OR DAMAGE PORTIONS OF EXISTING WORK TO REMAIN.
16. OWNER RESERVES THE RIGHT TO RETAIN ALL MATERIALS AND EQUIPMENT REMOVED FROM THE PROJECT. ANY ITEMS OR MATERIALS NOT DESIRED BY THE OWNER SHALL BE REMOVED FROM THE
OWNER'S PROPERTY BY THE CONTRACTOR AT THE CONTRACTOR'S EXPENSE.
17. COORDINATE METHOD, ROUTE AND TIMING OF MATERIAL AND DEBRIS REMOVAL WITH OWNER'S REPRESENTATIVE PRIOR TO ANY REMOVAL.
18. PATCH AND REPAIR ANY DAMAGE TO WALLS, FLOORS, CEILINGS, CABINETS, HARDWARE, WINDOWS, FIXTURES, ETC. RESULTING FROM PROJECT WORK. MATCH EXISTING FINISHES AS CLOSELY AS POSSIBLE UNLESS NOTED OTHERWISE. PATCHES AND REPAIRS SHALL RESTORE FINISH TO "LIKE NEW" CONDITION.
19. SEAL AND PROTECT ALL PIPE, DUCT AND CONDUIT PENETRATIONS OF FLOORS, WALLS, CEILINGS AND ROOF. METHODS AND MATERIALS USED FOR TREATMENT OF PENETRATIONS THROUGH RATED
ASSEMBLIES SHALL BE U.L. AND FIRE MARSHAL APPROVED.
20. ALL LOCATIONS FOR CORING THROUGH CONCRETE SLAB FLOORS AND WALLS SHALL BE CONFIRMED BY A CALIFORNIA LICENSED STRUCTURAL ENGINEER. USE X-RAY IMAGING OR OTHER MEANS E.G.
RADIOGRAPHY, ETC. WHEN NECESSARY TO LOCATE STRUCTURAL SLAB REINFORCEMENT.
21. ALL NEW WASTE PIPING SHALL BE SLOPED UNIFORMLY BETWEEN THE UPPER TERMINAL OF THE WASTE SYSTEM AND/OR SITE PIPING NOT LESS THAN 14" PER FOOT, UNLESS OTHERWISE NOTED. WHERE SLOPES LESS THAN 14" PER FOOT ARE INDICATED, THE NEW PIPING SHALL BE SLOPED TO ACHIEVE THE MAXIMUM SLOPE POSSIBLE, BUT NOT LESS THAN INDICATED OR ALLOWED BY CODE.
22. BACKGROUND CHECKS WILL BE REQUIRED FOR ALL PERSONNEL THAT WILL ACCESS THE FACILITY. WORKERS WILL BE REQUIRED TO COMPLY ALL REQUIREMENTS IN THE MAIN JAIL DIVISION
CONTRACTOR/VENDOR STANDARD CLEARANCE PACKAGE.
23. WHILE IT IS NOT ANTICIPATED THAT ASBESTOS CONTAINING MATERIAL WILL BE DISTURBED DURING THIS PROJECT, THE CONTRACTOR SHALL NOTIFY THE PROJECT INSPECTOR IF ANY IS DISCOVERED THAT
AFFECTS WORK BY THE CONTRACTOR.
24. CONTRACTOR SHALL OBTAIN AND PAY ALL FEES FOR SACRAMENTO CITY PERMITS FOR SIDEWALK AND STREET CLOSURES AND PARKING SPACES REQUIRED FOR PERFORMANCE OF THIS WORK.
25. CONTRACTOR SHALL COORDINATE WITH AFFECTED UTILITY SERVICES (I.E., SACRAMENTO CITY DEPARTMENT OF UTILITIES, SMUD, AT&T, ETC.) FOR IMPACTS TO EXISTING UTILITIES LOCATED IN THE
PROJECT LOCATIONS.
GENERAL NOTES
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1. Summary of Delegated Design portion of Work.
2. Delegated Design submittals.
B. Coordinate and assume full responsibility for design, engineering, submittals, fabrication, transportation, and installation of this work.
C. Delegated Design efforts include the following:
1. Refrigeration system design, including evaporator and compressor unit equipment sizing, refrigerant line sizing, leak detection and equipment controls.
1.2 DEFINITIONS
A. Delegated Design: Professional design service or certification specifically required of the Contractor in the Specifications.
B. AHJ: Authorities Having Jurisdiction - County of Sacramento
1.3 PERFORMANCE REQUIREMENTS
A. Comply with Codes and Regulations.
B. Provide complete, operational refrigeration systems that perform their intended use.
1. Provide services of a qualified professional engineer licensed in the Project jurisdiction.
C. Execute the design intent as indicated in Project Drawings and Specifications.
D. Obtain Permits and inspections and pay fees required by AHJ.
1.4 SUBMITTALS
A. Preliminary Design: Submit drawings and product data that describe Contractor's design prior to performing engineering calculations and final drawings.
1. Project Engineer will evaluate proposed design and comment on conformance with intent of Contract Documents.
B. Final Design: Submit drawings, product data and engineering calculations that describe Contractor's final design.
C. Permit Review: Submit Delegated Design documents to AHJ for review and approval as a Deferred Submittal. The Project Engineer will be the main point of contact with the AHJ.
1. Review by the Project Engineer prior to submittal to the AHJ is required.
2. Make corrections noted by Project Engineer.
3. Obtain approved of plans by the AHJ prior to executing work component.
4. Comply with AHJ requirements.
5. Include design criteria and design assumptions.
6. Affix Design Professional's seal for State License on Submittals.
D. Product Data and Shop Drawings: Comply with requirements in Section 230500 for each product of Delegated Design portion of work. Product submittals are in addition to submittals for permit and design data.
1.5 SCHEDULING
A. Schedule design process and submittals required for Delegated Design portions to fit within Construction Schedule.
B. Allow adequate time for AHJ review. Contact AHJ for time estimate and coordination of schedule.
C. Project Engineers approval of Final Design is required prior to submittal to the AHJ.
END OF SECTION
DELEGATED REFRIGERATION SYSTEM DESIGN PROCEDURES
M
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-001
MECHANICAL LEGEND
AND GENERAL NOTES
CONTRACT 4700RE
NOTES:
PROVIDE UNIT WITH BACNET INTERFACE MODULE.1
TAG
COMPRESSOR ELEC. DATA
PHASE
CONDENSING UNIT SCHEDULE
VOLTS HZ
NOTES
COND.
FLOW
(GPM)
MCARLA
NOMINAL
SIZE
(MBH)
MODEL NO.MANUFACTURER
CU
C
84 36.3 39.1 208 60 1200
CU
A
127 71.3 76.8 208 603 1200HWV12TK
HWV12TK 3
TAG
EVAPORATOR SCHEDULE
MANUFACTURER MODEL NO. NOTES:AMPS.
WEIGHT
(LBS)
EV
1.6 100
EV
2.7 125
EV
0.6 -
EV
4.8 265
EV
3B
2.7 125
EV
3A
2.7 125
EV
3.2 180
EV
1B
3.6 265
EV
1A
3.6 265
ELECTRICAL DATA
PHASEVOLTS HZ
230 1 60
230 1 60
115 1
115 1
115 1
115 1
115 1
115 1
115 1
CU
B
97 64.2 69.7 208 60 1200HWV12TK 3
MOPD
NOTES:
35 TON CAPACITY, 424.8 MBH.
82.5"L x 47.5"W x 104.75"H, (HEIGHT INDICATED DOES NOT INCLUDE MOUNTING STEEL OR ISOLATORS)
(1) RE-CIRCULATING PUMP MOTOR AT 1/2 HP, 460V/3PH. PROVIDE UNIT WITH STAINLESS STEEL BASIN.
PRESSURE DROP THROUGH COIL 3.47 PSI
PROVIDE BASIN WITH TWO 21
2" TAPS FOR CONNECTION TO SIDE-STREAM WATER TREATMENT SYSTEM.
MANUFACTURERTAG
FLUID COOLER SCHEDULE
MODEL NO.
HPQTY VOLTS
CAPACITY FAN DATA
PHASE
NOTES:
OPER.
WEIGHT
(LBS)EWB
(°F)
LWT
(°F)
EWT
(°F)
FLOW
(GPM)
2 3 4
PLUMBING SPECIALTIES
TAG DESCRIPTION MANUFACTURER REMARKSMODEL
LEAD-FREE, REDUCED PRESSURE PRINCIPLE BACKFLOW PREVENTER, CAST COPPER SILICON ALLOY BODY WITH QUARTER TURN BALL VALVES, STRAINER, AIR GAP FITTING & ELBOW - SIZE AS INDICATED ON DRAWINGS. DRAIN LINE OFF UNIT SHALL ROUTE FULL LINE SIZE TO AND TERMINATE AT AN APPROVED RECEPTOR WITH A TURN DOWN ELL WHILE MAINTAINING A MINIMUM 1" AIR GAP. PROVIDE
INSULATION COVER.
BFP-1 BACKFLOW
PREVENTER WATTS
LF009QT-S WITH
909AGC AIR GAP
FITTING &
909EL-C ELBOW
NOTES:
NON-OVERLOADING ACROSS CURVE, ODP MOTOR, FLEX COUPLED, BASE MOUNTED.1
TAG
CONDENSING WATER PUMP SCHEDULE
PUMP MOTOR DATA
VOLTS
SERVICEMODEL NO.MANUFACTURER
FLOW
(GPM)
TOTAL
HEAD
(FT.)
RPM
HP PHASE
NOTES
CWP
BELL & GOSSETT e-1510 1.5 BC 80 90 1750 5 460 3CONDENSER
WATER
MANUFACTURER MODEL NO. DESCRIPTION
MISCELLANEOUS EQUIPMENT SCHEDULE
REMARKSTAG
AX-15V
ET
AMTROL EXPANSION TANK
8.0 GALLON VOLUME, 2.4 GALLON ACCEPTANCE
VOLUME, TOTAL WEIGHT = 60 LBS.
WATER TREATMENT SYSTEM
REMARKSTAG
WTS
PROVIDE FULLY ASSEMBLED WATER TREATMENT SKID COMPLETE WITH
DYNAMIC SCALE REACTOR, CONTROL UNIT, 1 HP CIRCULATING PUMP,
CONDUCTIVITY SENSOR AND ALL SYSTEM VALVES.
PACKAGE WATER
TREATMENT SYSTEM
MANUFACTURER
DYNAMIC WATER
TECHNOLOGIES DSRZM
MODEL NO. DESCRIPTION PUMP MOTOR DATA
VOLTS
FLOW
RATE
PHASE
460 3
GPM
WEIGHT
LBS.
UNIT
WEIGHT
(LBS.)
HUSSMAN
PROTOCOL
HUSSMAN
PROTOCOL
HUSSMAN
PROTOCOL
HUSSMAN
HUSSMAN
HUSSMAN
SERVES
DAIRY / BEVERAGE
COOLER
MEAT CUTTING
PRODUCE COOLER
MEAT COOLER
MEAT COOLER
DAIRY COOLER
FREEZER
FREEZER
TEMP. (DEG. F)
-10
-10
FC
VF1-018-32H 85 95° 85° 73° 1 5.0 460 3 3,660
HP VOLTS PHASE
0.5 460 3
SPRAY PUMP DATA
KRD66E-270-TDAK
PROTOCOL
KRD66E-270-TDAK
PROTOCOL
KRD46A-216-TDB
PROTOCOL
KRD34A-143-TDB
PROTOCOL
KRD34A-143-TDB
PROTOCOL
KRD66A-340-TDB
PROTOCOL
GLD26A-90-TDB
PROTOCOL
KRD34A-143-TDB
PROTOCOL
KRD26A-125-TDB
PROTOCOL
HUSSMAN
HUSSMAN
HUSSMAN
HUSSMAN
HUSSMAN
HUSSMAN
BALTIMORE
AIR COIL
NOTES:
UL LISTED NEMA 3R OUTDOOR ENCLOSURE COMPLETE WITH "CERUS" X-DRIVE VFD, SPRAY PUMP MOTOR STARTER, STEPDOWN TRANSFORMER, BYPASS AND RUN LIGHTS, FAULT PILOT LIGHT, AND MCP BREAKER / DISCONNECT. PANEL FULLY WIRED AT FACTORY FOR SINGLE POINT ELECTRICAL CONNECTION.
REFER TO PLANS FOR MOUNTING LOCATION.
TAG
FLUID COOLER CONTROLLER
SERVICE
VOLTSHP PHASE
RATED OUTPUT
NOTES:
WEIGHT
(LBS)
MANUFACTURER
MODEL NO.
FCC
FRANKLIN ELECTRIC
TOWER IQ / CTP3R-BYP005-4V-3
FC
5.0 / 0.5 460 3 150
ROOM
NUMBER
BOX #1
(FREEZER)
BOX #2
(DAIRY)
BOX #3
(MEAT
COOLER)
BOX #4
(PRODUCE
COOLER)
BOX #6
(COOLER)
BOX #7
(DAIRY
COOLER)
BOX #1
(FREEZER)
BOX #5 MEAT
CUTTING
/PREP
BOX #3
(MEAT
COOLER)
RATED (A)
NOTES:
TAG
FAN MOTOR DATA
SUPPLY FAN SCHEDULE
MODEL NO.MANUFACTURERSERVICE
HP
CFM
PHASEVOLTS
NOTES:
EXT.
STATIC
PRESS.
(I.W.C.)
FAN
SPEED
(RPM)
TOTAL
WEIGHT
(LBS)
FOR MOUNTING DETAIL SEE 1/M-603
SF
SUPPLY
FAN GREENHECK QEI-27 13,000 0.6 945 3 460 3 522
CWP
BELL & GOSSETT e-1510 1.5 BC 80 90 1750 5 460 3CONDENSER
WATER
PROVIDE UNIT WITH 5 YEAR FULL WARRANTY.2
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-002
MECHANICAL
SCHEDULES
CONTRACT 4700RE
(FOR REFERENCE ONLY)
(FOR REFERENCE ONLY)
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-003
MECHANICAL
SCHEDULES
CONTRACT 4700RE
55.04.00.05.0
55.04.00.05.055.04.00.05.0
55.04.00.05.055.04.00.05.0
55.04.00.05.0
SEE SHEET M-201 FOR
ENLARGED NEW PLAN
MECHANICAL RM
C W
R
CWS
C W
S
CWRCWS
C W
S C
W R
CWR
4" CWS
4"
4" CWS/CWR TO
SC UNITS ON 1ST
& 2ND FLOORS
4" PIPING TO CAL-ID
ROOM (APPROXIMATE
ROUTING)
RISE TO EVAP COOLER
IN PENTHOUSE
CAL-ID
4" 3" CWR
3"
BOX #1BOX #2
BOX #3
BOX #4
BOX #5
BOX #6
EVAP.
EVAP. EVAP.
EVAP.
EV
AP
EV
AP
EV
AP
EV
AP
EV
AP
4 4
65 ABANDON 3"
CWS IN PLACE.
BMS CONTROL
PANEL
EV-1A
EV-1B EV-2
EV-5
EV-3B
EV-3A
S
S
DEMOLITION SHEET NOTES
REMOVE REFRIGERATION COMPRESSOR CABINET AND
SKID (THAT MEASURES APPROXIMATELY 48”Wx120”Lx70”)
IN ITS ENTIRETY, INCLUDING ALL COMPRESSORS,
CONDENSERS, PIPING, VALVES AND ELECTRICAL
COMPONENTS. DISCONNECT FROM REFRIGERANT AND
CONDENSER WATER PIPING OVERHEAD. EXISTING
CONCRETE PAD TO REMAIN.
REMOVE CWP-1 & CWP-2 BASE MOUNTED CENTRIFUGAL
CONDENSER WATER PUMPS. REMOVE ALL TRIM UP TO
ISOLATION VALVES. RETAIN DIFFERENTIAL PRESSURE
CONTROLLER FOR REINSTALLATION.
PRIMARY PATH OF REFRIGERANT PIPING CIRCUITS
BETWEEN THE CONDENSER SKID AND WALK-IN
EVAPORATOR COILS. FIELD VERIFY EXACT PIPE SIZES
AND ROUTING. REMOVE ALL VISIBLE AND READILY
ACCESSIBLE REFRIGERANT LINES AND PREPARE FOR
NEW INSTALLATION OF NEW LINES.
SUSPENDED EVAPORATOR UNIT TO BE REMOVED AND
MADE READY FOR NEW UNIT. SEE SHEET M-200 AND
M-201. REMOVE ALL VISIBLE AND READILY ACCESSIBLE
REFRIGERANT LINES AND PREPARE FOR NEW
INSTALLATION OF NEW LINES.
CAP AND ABANDON 3" CONDENSER WATER SUPPLY AND
RETURN PIPING.
CAP AND ABANDON 3" CONDENSER WATER SUPPLY AND
RETURN PIPING FOR CONTINUED SERVICE.
PROVIDE SURFACE MOUNTED TEMPERATURE AND
HUMIDITY SENSOR ON EXISTING STAINLESS STEEL
COLUMN. SECURE BOTTOM OF DEVICE AT 72" ABOVE
FINISHED FLOOR. ROUTE EXPOSED 3 4" RIGID METALLIC
CONDUIT UP THROUGH EXISTING CEILING AND PROVIDE
CONDUIT AND WIRING BACK TO TEMPERATURE CONTROL
PANEL IN BASEMENT MECHANICAL ROOM. BODY (GANG
BOX AND COVER) SHALL BE SS AND TAMPER RESISTANT
SCREWS AND HOUSING SHALL BE USED. BOX WILL BE
SUBJECT TO WET KITCHEN CONDITIONS AND SHALL BE
SUITABLE FOR CORRECTIONAL GRADE ENVIRONMENTS.
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-100
OVERALL BASEMENT
MECHANICAL
DEMOLITION PLAN
SCALE: 1/16" = 1'-0"
OVERALL BASEMENT MECHANICAL DEMOLITION PLAN1
N
CONTRACT 4700RE
55.04.00.05.055.04.00.05.0
55.04.00.05.055.04.00.05.0
55.04.00.05.0
BOX #2
(DAIRY)
BOX #1
(FREEZER)
BOX #5
BOX #3
BOX #4
(PRODUCE COOLER) BOX #6
(COOLER)
BOX #7
(DAIRY COOLER)
MEAT CUTTING/PREP
(MEAT
COOLER)
EV
1A
EV
1B
EV
EV
3B
EV
3A
EV
EV
EV
EV
2" RL,
8" RS
(AC)
SEE SHEET M-201
FOR ENLARGED PLAN
CWS CWRCWS
C W
S C
W R
CWR
(E)3" (E)11
4"
(E)11 4"
(E)11
4" CWS/CWR
TO SC UNITS ON
1ST & 2ND FLOORS
(E)11
4" CWS/R PIPING TO
CAL-ID ROOM
(APPROXIMATE ROUTING)
CAL-ID
(E)11 4" (E)3"
(E)3"
MECHANICAL RM
SEE SHEET M-202
FOR ENLARGED PLAN
2" RL,
8" RS
(AC)
NEW WORK SHEET NOTES
INSTALL NEW SUSPENDED EVAPORATOR COOLER/
FREEZER UNIT. MOUNT SIMILAR TO EXISTING UNIT USING
ALL STAINLESS STEEL HARDWARE. RECONNECT TO
EXISTING REFRIGERANT SUCTION AND LIQUID PIPING AS
ALLOWED AND EXISTING CONDENSATE DRAIN. REUSE
EXISTING HEAT TRACING AND RE-INSULATE ALL DRAIN
AND REFRIGERANT LINES WHERE INSTALLED.
RECONNECT (N) EVAP CONDENSATE DRAIN TO (E) DRAIN
LINE. ALL REUSED REFRIGERANT PIPING TO BE FLUSHED,
CLEANED AND EVACUATED PER THE MANUFACTURER'S
GUIDELINES.
INSTALL NEW SUSPENDED EVAPORATOR COOLER/
FREEZER UNIT. MOUNT SIMILAR TO EXISTING UNIT USING
ALL STAINLESS STEEL HARDWARE. CONNECT TO NEW
REFRIGERANT SUCTION AND LIQUID PIPING AND
EXISTING CONDENSATE DRAIN. REUSE EXISTING HEAT
TRACING AND RE-INSULATE ALL DRAIN AND
REFRIGERANT LINES WHERE INSTALLED. RECONNECT (N)
EVAP CONDENSATE DRAIN TO (E) DRAIN LINE.
SECURE NEW REFRIGERANT PIPING TO EXISTING
TRAPEZE HANGER ASSEMBLIES.
DEMOLISH ABANDONED REFRIGERANT PIPING SERVING
EV-1A AND 3A AS NEEDED TO ALLOW INSTALLATION OF
NEW PIPING.
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-200
OVERALL BASEMENT
MECHANICAL PLAN
SCALE: 1/16" = 1'-0"
OVERALL BASEMENT MECHANICAL PLAN1
N
CONTRACT 4700RE
MECHANICAL RM
CWS
CWRCWR
CWS
C W
R C
W S
2" CWS/CWR TO &
FROM FLUID
COOLER ABOVE,
FOR CONTINUATION
SEE SHEET M-203
(E)3"
2"
(E)3"
BOX #6
(COOLER)
BOX #7
(DAIRY COOLER)
EV
EV
CU
C
2" RL,
8" RS
(AC)
CU
A
CU
B
MAINTENANCE
ACCESS OPENING
ABOVE, KEEP CLEAR
FOR CONTINUATION,
SEE SHEET M-202
CWP
(E)BFP
ON WALL
ET
(E) JCI CONTROL
PANEL LOCATIONS(E)11
4" (E)3"
POC
POC
CWS
ABANDON (E)3"
CWR IN PLACE.
CAP
CWP
2" RL,
8" RS
(AC) 2
NEW WORK SHEET NOTES
INSTALL NEW SUSPENDED EVAPORATOR COOLER/
FREEZER UNIT. MOUNT SIMILAR TO EXISTING UNIT
USING ALL STAINLESS STEEL HARDWARE. RECONNECT
TO EXISTING REFRIGERANT SUCTION AND LIQUID PIPING
AS ALLOWED AND EXISTING CONDENSATE DRAIN.
REUSE EXISTING HEAT TRACING AND RE-INSULATE ALL
DRAIN AND REFRIGERANT LINES WHERE INSTALLED.
RECONNECT (N) EVAP CONDENSATE DRAIN TO (E) DRAIN
LINE. ALL REUSED REFRIGERANT PIPING TO BE FLUSHED,
CLEANED AND EVACUATED PER THE MANUFACTURER'S
GUIDELINES.
SECURE NEW REFRIGERANT PIPING TO EXISTING
TRAPEZE HANGER ASSEMBLIES. REMOVE ABANDONED
REFRIGERANT PIPING AS NEEDED TO ACCOMMODATE
NEW PIPING.
INSTALL NEW FLOOR MOUNTED CONDENSING SECTION
ON EXISTING HOUSEKEEPING PAD. SECURE TO FLOOR
PER DETAIL 5/M601.
INSTALL NEW BASE MOUNTED CENTRIFUGAL PUMP ON
EXISTING HOUSEKEEPING PAD. INSTALL NEW INLET AND
OUTLET PIPING AND ACCESSORIES. SEE DETAIL 2/M-401
AND 6/M-601. RECONNECT PIPE AND CONNECT (E)
DIFFERENTIAL PRESSURE CONTROLS.
INSTALL END OF LINE DIFFERENTIAL PRESSURE BYPASS
VALVE WITH SHUT OFF VALVES AND PRESSURE GAUGE.
SEE SCHEMATIC 2/M-401 FOR FURTHER DETAILS.
INSTALL NEW EXPANSION TANK, ET-1 ON FLOOR.
SECURE TO CONCRETE WALL WITH ONE STRAP
CONNECTED TO A SINGLE 15
8" STRUT USING TWO 3 8"
HILTI KB-TZ2 WITH 11
2" EMBEDMENT.
PATH OF PIPE AND CONDUIT ROUTE IS EXTREMELY
CONGESTED AND WILL REQUIRE OFFSETS NOT SHOWN.
SEE DETAIL 1/M-401 FOR PIPE SIZING AND REUSE NOTES.
INSTALL NEW 50 VA STEPDOWN TRANSFORMER, 24V DC
OUTPUT, FED FROM JCI POWER SUPPLY.
ALL REFRIGERANT TO BE CAPTURED AND TURNED OVER
TO FACILITY ENGINEERING. REUSED REFRIGERANT
PIPING TO BE PURGED, CLEANED AND EVACUATED PER
THE NEW EQUIPMENT VENDORS REQUIREMENTS TO
MAINTAIN WARRANTY ON ALL NEW EQUIPMENT.
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-201
ENLARGED BASEMENT
MECHANICAL PLAN
SCALE: 1/4" = 1'-0"
ENLARGED BASEMENT MECHANICAL PLAN1
N
CONTRACT 4700RE
5 5.04.00.05.055.0 4.00.05.0
BOX #2
(DAIRY)
BOX #1
(FREEZER)
EV
1A
EV
1B
EV
EV
3B
EV
3A
EV
EV
2" RL,
8" RS
(AC)
2" RL, 13
8" RS (AC)
FOR CONTINUATION,
SEE SHEET M-2012
BOX #5 MEAT
CUTTING/PREP
BOX #3 (MEAT
COOLER)
BOX #4 (PRODUCE
COOLER)
2" RL,
8" RS
(AC) 2
NEW WORK SHEET NOTES
INSTALL NEW SUSPENDED EVAPORATOR COOLER/
FREEZER UNIT. MOUNT SIMILAR TO EXISTING UNIT
USING ALL STAINLESS STEEL HARDWARE. RECONNECT
TO EXISTING REFRIGERANT SUCTION AND LIQUID PIPING
AS ALLOWED (EXCEPT UNITS EV-1A & EV-3A WHICH USES)
AND EXISTING CONDENSATE DRAIN. REUSE EXISTING
HEAT TRACING AND RE-INSULATE ALL DRAIN AND
REFRIGERANT LINES WHERE INSTALLED. RECONNECT (N)
EVAP CONDENSATE DRAIN TO (E) DRAIN LINE. ALL
REUSED REFRIGERANT PIPING TO BE FLUSHED,
CLEANED AND EVACUATED PER THE MANUFACTURER'S
GUIDELINES. CONTRACTOR TO PROVIDE A DETAIL FOR
MOUNTING OF THE EVAPORATORS IN THE EQUIPMENT
SUBMITTAL PACKAGE FOR REVIEW BY THE SEOR PRIOR
TO FABRICATION.
SECURE NEW REFRIGERANT PIPING TO EXISTING
TRAPEZE HANGER ASSEMBLIES WHEREVER POSSIBLE.
REMOVE ABANDONED REFRIGERANT PIPING AS NEEDED
TO ACCOMMODATE NEW PIPING. SEE DETAIL 4/M-601 &
6/M-601.
SEE DETAIL 1/M-401 FOR PIPE SIZING AND REUSE NOTES.
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-202
ENLARGED BASEMENT
MECHANICAL PLAN
SCALE: 1/4" = 1'-0"
ENLARGED BASEMENT MECHANICAL PLAN1
N
CONTRACT 4700RE
(E)11
4" CWS/CWR TO
SC 1 & 2 UNITS ON
1ST & 2ND FLOOR
C W
R
(E)SC-1
(E)11 4"
(E)1"
(E)1"CWS/CWR TO
2ND FLOOR SC-2
CWR
CWS
2" CWS/CWR DROP INSIDE
MECHANICAL SHAFT TO BASEMENT
MECHANICAL ROOM FOR
CONTINUATION SEE SHEET M-201.
2" CWS/CWR THROUGH
CONCRETE SLAB TO ROOF.
2"
C W
S
(E)1"
(E)4" W (OH)
3" W FROM NEW ROOF
RECEPTOR. SEE
DETAIL 7/M-601.
3" W (OH)
2" VR
POC
CO
CWS&R PIPING
SHOWN FOR
REFERENCE ONLY
IN THIS AREA.
NEW WORK SHEET NOTES
INSTALL NEW 21
2" CWS AND CWR HIGH OVERHEAD
FOLLOWING THE SAME PATH AS THE NEW ELECTRICAL
AND CONTROL CONDUIT (NOT SHOWN). SEE DETAIL
2/M-601 & 4/M-601.
FOR REQUIRED TEMPORARY COOLERS, REFER TO
ELECTRICAL SHEET E-201.
Department of General Services
Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-203
OVERALL GROUND
FLOOR MECHANICAL
PLAN
SCALE: 1/16" = 1'-0"
OVERALL GROUND FLOOR MECHANICAL PLAN1
N
CONTRACT 4700RE
1" CWS/CWR FB TO
2ND FLOOR SC-2
(E)SC-2
(E) EXHAUST FAN
36'-3"
FC
2" CWS/R
(DN)
CWS
CWR
4'-55 16"
1" NPW
MAKE-UP
(E) RADIATOR
POC
(E) ROOF DRAIN
& OVERFLOW
(E) RD
(E) OFD
BFP-1
1 2
(E) HB ON ROOF
WTS
RR-1
FCC
AIR INTAKE SIDE3
4" DCW
FOR MOUNTING
DETAIL SEE 5/M602.
FOR PIPE SUPPORT
DETAIL, SEE 5/M-602.
SEE DETAIL
7/M-601.
FOR PIPE SUPPORT
DETAIL, SEE 3/M-602.
SF
POC
DEMOLISH
(E) SUPPLY
AIR HOOD
60x60 FILTER FRAME
36x36
PROVIDE 45° CUTBACK WITH 14"
STAINLESS STEEL BIRD SCREEN,
LOCATE MINIMUM 10'-0" FROM ANY
EXHAUST OR VENT PIPE AS REQUIRED
10'-0" MIN.
OA RADIUS
NEW WORK SHEET NOTES
INSTALL NEW FLUID COOLER (FC-1) AND ASSOCIATED
COMPONENTS. FOR FC-1 CONFIGURATION/MOUNTING
DETAIL SEE 1/ M-601. FOR ADDITIONAL INFO REGARDING
MOUNTING REFER TO STRUCTURAL DRAWINGS. FOR
CONDENSER WATER PIPING SCHEMATIC SEE 2/M-401.
MAINTAIN ALL MINIMUM MAINTENANCE CLEARANCES
AROUND EQUIPMENT, REFER TO MFR'S INSTRUCTIONS.
COMBINE BLOWDOWN LINE, DRAIN & OVERFLOW AND
ROUTE PIPING DISCHARGE TO ROOF RECEPTOR.
NEW RE-CIRCULATING PUMP BY TOWER MFR.
ROUTE NEW 3 4" NPW & 21
2" CWS/R LINES LOW ALONG
ROOF, PROVIDING SUPPORT PER DETAIL 3/M602.
FLUID COOLER PUMP MOTOR LOCATION.
COORDINATE WITH FLUID COOLER MANUFACTURER FOR
FACTORY MOUNTED CHEMICAL FEEDER, REFER TO
FLUID COOLER EQUIPMENT SCHEDULE ON SHEET M-002.
BLOWDOWN VALVE, CONDUCTIVITY PROBE, BIO
CONTROL FEEDER, CONDUCTIVITY CONTROLLER,
SAMPLE PORTS AND ISOLATION VALVES LOCATED HERE,
REFER TO EQUIPMENT MFR'S INSTRUCTIONS FOR FIELD
CONNECTIONS AND ITEMS SHIPPED LOOSE FOR FIELD
INSTALL.
FOR BACKFLOW PREVENTER SEE 3/M-601 AND
PLUMBING SPECIALTY SCHEDULE ON SHEET M-002.
FURNISH WITH REMOVABLE INSULATING JACKET.
FOR DISCONNECTS, FAN MOTOR AND RE-CIRCULATION
PUMP MOTOR POWER FEEDS REFER TO ELECTRICAL
PLANS.
ANCHOR WTS-1 SKID TO STEEL RAILS USING (4) 12" DIA.
SST BOLTS AND LOCKING NUTS. REFER TO 7/S-400.
MOUNT FCC PANEL USING STAINLESS STEEL 15
8" STRUT
FRAME. BOLT VERTICAL SUPPORTS USING 6"x6" STRUT
BASES WITH FOUR 12" DIA HOLES. BOLT TO I-BEAM.
NEW SUPPLY FAN SF-1 AND DUCTWORK INSTALLATION
SEE DETAIL 1&2/M603 FOR MOUNTING.
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-204
ENLARGED SECOND
FLOOR & ROOF
MECHANICAL PLANS
SCALE: 1/16" = 1'-0"
ENLARGED SECOND FLOOR MECHANICAL PLAN1
N
SCALE: 1/4" = 1'-0"
ENLARGED ROOF MECHANICAL PLAN2
N
CONTRACT 4700RE
FD
C W
S C
H W
R
EF-10
EC-1
AC-18
30x30
FS-1
MCC
AC-17
44x32
38x38
12x12
MOTOR
CONTROL
CENTER
AC-17, AC-18, AC-19 & EC-1
TEMP. CONTROL PANEL
EXPANSION
TANK ON FLOOR
3"
ET-1
EA LOUVER
DEMOLITION SHEET NOTES
DEMOLISH EXPANSION TANK AND CAP PIPING
CONNECTIONS.
DEMOLISH EVAPORATIVE FLUID COOLER, INCLUDING
DISCHARGE STAINLESS STEEL DUCT PLENUM AND
TRANSITION DUCT TO LOUVER. DISCONNECT
CONDENSER WATER, PROCESS COLD WATER AND
ASSOCIATED BACKFLOW PREVENTER AND CHEMICAL
TREATMENT SYSTEM. BREAKDOWN UNIT BY UNBOLTING
AND CUTTING LARGER COMPONENTS FOR REMOVAL VIA
ELEVATORS.
REMOVE/DISCONNECT ALL CONTROLS ASSOCIATED WITH
EC-1 OPERATION.
FC-1 ABOVE
ON ROOF
INSTALL NEW CONTROL PANEL
ON CONCRETE WALL. BOLT TO
CONCRETE WALL WITH A MIN.
OF (4) 3 8" EXPANSION ANCHORS,
MIN. 11
2" EMBEDMENT.
GENERAL LOCATION
OF CWS/R PIPE
ROOF PENETRATION.
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-205
PARTIAL 10TH FLOOR
MECHANICAL
DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
PARTIAL PENTHOUSE MECHANICAL DEMOLITION PLAN2
N
SCALE: 1/4" = 1'-0"
PARTIAL MEZZANINE MECHANICAL DEMOLITION PLAN1
N
CONTRACT 4700RE
EV-1A EV-1B EV-2 EV-3A EV-3B EV-4 EV-5 EV-6 EV-7
CU
A
FIELD VERIFY
ORDER AND SIZE
OF EXISTING
REFRIGERANT
PIPING.
(E) REFRIGERANT LINES
(EV-1A) 12" RL, 13
8" RS
SCALE: NONE
REFRIGERANT PIPING SCHEMATIC1
CU
B
CU
C
(EV-4) 12" RL, 11
8" RS
(EV-5) 12" RL, 78" RS
(EV-6) 12" RL, 7 8" RS
(EV-3A) 12" RL, 7 8" RS
(EV-7) 12" RL, 7 8" RS
(EV-3B) 12" RL, 7 8" RS
(EV-2) 12" RL, 11
8" RS
BASEMENT
GROUND FLOOR
ROOF (MEZZANINE)
SECOND FLOOR
(E)SC-2
(E)11 4"
SCALE: NONE
CONDENSER WATER PIPING SCHEMATIC2
C W
R
C W
S
C W
R C
W S
CWR
CWS
CWR
CWS
CWR
2" FULL SIZE DRAIN/
OVERFLOW TO ROOF
RECEPTOR (TYP)
T
T
2"
2" DRAIN ROUTE TO
ROOF RECEPTOR
(E) 1"
(E)1"
2"
(E)3"
2"
(E)SC-1
FC
2" CWR FLANGED
CONNECTION 21
2" CWS FLANGED
CONNECTION WITH 3 4"
AIR VENT AT HIGH
POINT (TYP. OF 2)
C W
R
BFP-1
NPW
2" CWS & CWR T1
M
4" DCW MAKE-UP
(E)HB
POC
(E) CAL-ID
(3 TON)
C W
S
CWR
C W
R
(E)3" CWR FROM (E) FLUID
COOLER IN PENTHOUSE
TO BE ABANDONED.
CAP (E)3" CWR IN
BASEMENT LEVEL NEAR
ELEVATOR LOBBY.CAP (E)3" CWS
IN BASEMENT
MECH. ROOM.
(E)11 4"
(E)11 4"
(E)11 4"
POC (TYP.)
POC (TYP.)
DOUBLE SPHERE RUBBER
ISOLATION EQUAL TO
"MASON" MODEL SFDEJ.
PAINT EXPOSED RUBBER.
ET
(E)BFP ON
WALL
(E) DCW
POC
(E)2" CWS
4"
(E)1"
(E) CHEMICAL POT FEEDER
(N) PRESSURE
GAUGE (TYP.)
(E)11 4"
"CALEFFI" 11
4"
DIFFERENTIAL
BYPASS VALVE.
STRAINER
P/T PLUG TYP.
"CALIBRATED BALANCE
VALVE, LINE SIZE (TYP.)
PRV, SET
AT 25 PSIG
BFP-1
(EV-1B) 12" RL, 13
8" RSLINE SIZES SHOWN ARE FOR EVAPORATOR BRANCHES. REFERRING
TO THE VENDOR TABLES ON SHEET M003, SOME EVAPORATORS
CAN BE COMBINED INTO A SINGLE PAIR OF LINES (I.E. EVAP 4 AND 5
CAN COMBINE INTO A 58" RL AND 13
8" RS). EXISTING LINE SIZES
NEED TO BE CONFIRMED TO ESTABLISH BEST OVERALL PAIRING OF
LINES AS SUGGESTED BY THE MANUFACTURER.
(E)3"
(E)3"
(E)3"
(E)3" (E)3"
(E)3"
(E)3"
CWP
4"
4"
CU
C
CU
B
CU
A
LINE SIZE BALANCING VALVE
FLOW METER
SPRING ISOLATOR,
2"
2"
2"
2"
2"
FLEXIBLE CONNECTION.
SEE DETAIL 6/M-601 (TYP)
TEMPERATURE
SENSOR
WTS
2" DRAIN
LINE TO ROOF
RECEPTOR
2" FROM
FC-1
2" TO
FC-1
CHECK VALVE (TYP.)
CWP
STRAINER
(TYP.)
Department of General Services Administrative Services
Sacramento, Ca. 95827 9660 Ecology Lane
P. 916.876.6192
Architectural Services Division
R&A Job Number: COS10419
CONTRACT 4700
651 I STREET
MAIN JAIL -
HALL OF JUSTICE -
REPLACE WALK-IN
REFRIGERATION SYSTEMS
100% CONSTRUCTION
DOCUMENTS
1/31/2026
BID SET
M-401
MECHANICAL
SCHEMATICS
CONTRACT 4700RE
BACnet
TYPE DESCRIPTION
BACNET INTEGRTN TO FACTORY CU CNTRLBAC
(N) TCP PANEL
2ND FLOOR ROOF
CWS-T
FP-C
MS
FACTORY
PUMP
FP-S
CTF-C
CTF-S
CTF-O
VFD
WTR-TRT
BASEMENT
CU-A
MS
CWP1-S
(E)CWP-1
MS
CWP2-S
CWP-2
460V/3ph
460V/3ph
CWR-T
CWP2-C
CWP1-C
TYPE DESCRIPTION
FLUID COOLER
CONTROLLER POINT SCHEDULE
CWP-1 START/STOP (CWP1-C)BO
BI CWP-1 STATUS (CWP1-S)
CWP-2 START/STOP (CWP2-C)BO
BI CWP-2 STATUS (CWP2-S)
CW RETURN TEMP (CWR-T)AI
FACTORY PUMP STATUS (FP-S)BI
BAC CLG TWR FAN VFD INTEGRATION
CLG TWR FAN START/STOP (CTF-C)BO
BI CLG TWR FAN STATUS (CTF-S)
CLG TWR FAN SPEED MODULATION (CTF-O)AO
WATER TREATMENT PNL ALARM (WTR-TRT)BI
TYPE DESCRIPTION
BO FACTORY PUMP START/STOP (FP-C)
SYSTEM ENABLE
THE COOLING SYSTEM WILL AUTOMATICALLY START WHEN THE SYSTEM ENABLE IS ON. WHEN THE
SYSTEM ENABLE IS OFF, THE COOLING SYSTEM WILL BE DISABLED.
CONDENSER WATER PUMP CONTROL
WHEN THE SYSTEM IS ENABLED, THE LEAD CONDENSER WATER PUMP WILL BE STARTED. IF THE PUMP STATUS DOES NOT MATCH THE PUMP COMMAND, AN ALARM WILL BE GENERATED AND THE PUMP WILL BE STOPPED. THE LAG CONDENSER WATER PUMP WILL BE STARTED IN THE EVENT THE LEAD PUMP FAILS. THE LEAD PUMP WILL 24/7. THE PUMP WILL RUN AT CONSTANT SPEED PER THE INSTRUCTION OF THE TEST AND BALANCE CONTRACTOR.