FY 2027 Roadway Program

Closed State & local contract opportunity Posted

Solicitation number
10241336
State
Illinois
Responses due

Opportunity facts

Jurisdiction

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Wood Dale, Illinois is requesting sealed bids for resurfacing and rehabilitation of approximately one mile of local roadways within the Sherwood Forest subdivision, with bids due July 1, 2026 at 10:00 a.m. This is a prevailing wage project.

Work includes pavement surface removal, pavement patching, hot-mix asphalt paving, pipe drain and storm sewer installation, utility structure adjustments, ADA improvements, concrete curb and gutter replacement, sidewalk replacement, thermoplastic pavement markings, traffic control and protection, final restoration, and incidental work necessary to complete the project as shown on the plans.

Sealed bids must be delivered to the City Clerk at 404 N. Wood Dale Road, Wood Dale, Illinois 60191. Digital bidding documents are available through the Quest Construction Data Network (Quest Number 10241336) at www.questcdn.com for a $22.00 fee; paper copies are not available. All proposals must be accompanied by a bid guarantee (bid bond, cashier's check, or certified check) equal to not less than 10 percent of the bid amount. Questions are due by June 24, 2026 and should be directed to Kevin VanDeWoestyne, Project Manager at Thomas Engineering Group, LLC, by phone at (847) 815-9500 or email at kevinv@thomas-engineering.com. The City reserves the right to reject any or all bids, waive technicalities, delay the bid opening, and make changes to project specifications through addenda distributed to parties that have obtained bid documents. Bidders accept full responsibility for timely delivery of their bids.

Opportunity text

The work consists of the resurfacing and rehabilitation of approximately 1.00 miles of local roadways within the Sherwood Forest subdivision in the City of Wood Dale. Items of work include pavement surface removal, pavement patching, hot-mix asphalt paving, pipe drain and storm sewer installation, utility structure adjustments, ADA improvements, intermittent combination concrete curb and gutter replacement, sidewalk replacement, thermoplastic pavement markings, traffic control and protection, final restoration, and all incidental and collateral work necessary to complete the project as shown on the Plans and described herein.

Files

File Type Posted
city of wood dale 2027 roadway program.pdf PDF

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity