- Hemlock Public School District in Michigan is requesting proposals for Design-Build services for the expansion and renovation of Hemlock Elementary School/Early Childhood Center, with proposals due July 15, 2026, and a mandatory pre-proposal meeting on June 30 at 10:30 a.m. EST (virtual attendance via Google Meet is available). Phase I, utilizing approximately $1 million in USDA funding, will add approximately 3,000 square feet to the southeast wing and include a secure main corridor connection,...
- Hemlock Public School District in Hemlock, Michigan is requesting proposals for design-build services for the expansion and potential renovation of Hemlock Elementary School/Early Childhood Center, with proposals due July 15, 2026 at 12:00 p.m. EST and a mandatory pre-proposal meeting on June 30, 2026 at 10:30 a.m. EST. Addendum #1 to the RFP was posted June 24, 2026. Phase I involves approximately 3,000 square feet of new construction utilizing approximately $1 million in USDA grant funding and...
- Hemlock Public School District, a general-powers K–12 district in Saginaw County, Michigan, is requesting proposals for design-build services to expand and renovate Hemlock Elementary School and its Early Childhood Center, with proposals due July 15, 2026 at noon EST. A mandatory pre-proposal meeting occurred June 30, 2026; all questions were due July 6, 2026. The scope spans two phases and multiple facilities. Phase I includes approximately 3,650 square feet of addition to Hemlock Elementary...
- Midland Public Schools is requesting sealed bids for a general contractor to perform alteration and change-of-use construction at 215 Fast Ice Drive, Midland, Michigan, under a stipulated-sum proposal, with bids due July 13, 2026 at 1:00 p.m. local time and anticipated award on July 20. This project is subject to Michigan Prevailing Wages on State Projects Act, Act 10 of 2023 — all bidders must include prevailing wage labor and fringe benefit costs in their bid amounts. The scope encompasses...
- Mattawan Consolidated Schools is requesting sealed bids for building construction and renovation at its middle school facility located at 56720 Murray Street in Mattawan, Michigan, with bids due July 10, 2026 at 1:00 p.m. EST. The scope encompasses selective demolition, concrete, masonry, structural steel, general trades, metal panels, membrane roofing, overhead doors, aluminum and glazing, painting, drywall and ceilings, flooring, kitchen equipment, fire protection, plumbing, mechanical,...
Hemlock Public School District in Michigan is requesting proposals for design-build services for the Hemlock Elementary School and Early Childhood Center expansion and renovation, with proposals due July 15, 2026 at 12:00 PM EST and a mandatory pre-proposal meeting held June 30, 2026. The pre-proposal meeting was held June 30, 2026 and site walkthroughs followed; virtual participation was available via Google Meet. The project spans two phases. Phase I encompasses approximately 3,650 square feet of new early childhood classrooms, first-grade classroom additions, secure main corridor connection, office and student support spaces, redesigned parent drop-off and pick-up loop, and safety and security upgrades, funded by a $1 million USDA grant with bond funds covering remaining Phase I costs. Phase II, contingent on voter approval of a November 2026 non-qualified bond of approximately $14 million, adds approximately 10,975 square feet of additional classrooms, staff facilities, office and intervention spaces, and flexible learning environments. Additional work includes relocation of the Fordney Road School building, expansion at KC Ling Elementary (16,000 square feet), and campus outdoor learning and recreation corridor improvements with parking and traffic flow enhancements. The total anticipated project value is approximately $14 to $15 million across both phases. USDA Buy American, Build American Act requirements apply to Phase I work; prevailing wage requirements do not apply. The Design-Builder must competitively bid trade categories as required under Michigan statutes MCL 380.1267 and MCL 380.1274. Compensation is based on a Guaranteed Maximum Price with fee percentages submitted for design services, general conditions, contractor overhead and profit, and change order markups for both phases. The District will use qualifications-based selection. Interviews are scheduled for July 28, 2026, with final Board approval August 12. Construction begins Spring 2027 with substantial completion Summer 2028 and school opening for the 2028-2029 school year. The contract uses a modified AIA A141-2014 Standard Form of Agreement. Required insurance includes Commercial General Liability ($3 million aggregate/$1 million per occurrence), Professional Liability ($1 million), Workers' Compensation ($100,000), and Automobile Liability ($1 million). Personnel must pass background checks and fingerprinting. Proposers must submit sworn and notarized familial relationship disclosure statements and Iran Economic Sanctions Act compliance certifications. Addendum #3 indicates MOSS is the District's primary technology, data, and security consultant, though alternative consultants and vendors remain eligible for evaluation.
Name | Description | Size | Type | Posted |
|---|---|---|---|---|
HPSD DB RFP FINAL.pdf | 14MB | 7/7/26 | ||
Design Build Services RFP Addendum #3.pdf | 180KB | 7/7/26 | ||
HDPS DB RFP ADDM #2_FINAL.pdf | 3MB | 7/7/26 | ||
HDPS DB RFP ADDM #1 corrected.pdf | 165KB | 7/7/26 |