Central Fire Station Window Replacement

Closed State & local contract opportunity Posted

Solicitation number
10274237
State
Illinois
Responses due

Opportunity facts

Jurisdiction
Point of contact

Opportunity details come from constructionbidsource.com. Updated .

About this opportunity

The City of Freeport, Illinois is requesting sealed bids for removal and replacement of 54 commercial windows and transom infill panels at the Central Fire Station, 1650 South Walnut Avenue, with bids due August 11, 2026 at 10:30 a.m. CDT. The project is phased: 50% of windows must be replaced in 2026 and the remaining 50% after January 2027 due to budget constraints.

The scope includes all labor, materials, equipment, and protection necessary to safeguard the building interior during window removal and installation, plus restoration of all interior walls, sills, stools, aprons, trim, and adjacent surfaces to a condition equal to or better than pre-construction standards. Engineering services are provided by Fehr Graham.

Sealed bids must be submitted to City Hall, 314 West Stephenson Street, Freeport, Illinois 61032. Bid documents are available for download from www.fehr-graham.com through Quest Network Service (project number 10274237) for a non-refundable fee of $25.00, or in hard copy from Fehr Graham's office at 101 West Stephenson Street for $200 per set (non-refundable). Questions may be directed to Fehr Graham Senior Project Manager Darin Stykel at (815) 235-7643 or dstykel@fehrgraham.com until five days prior to bid opening. A non-mandatory pre-bid conference is scheduled for Thursday, July 30, 2026 at 11:00 a.m. at the Central Fire Station. Any bids submitted after the opening time and date will be refused; overnight mailing of bidding documents is not provided.

Opportunity text

The project consists of the removal and replacement of 54 commercial windows and transom infill panels as described in the plans and specifications package. This project will consist of providing all labor, materials, equipment, and protection necessary to safeguard the interior of the building during window removal and installation operations, and to restore all interior walls, sills, stools, aprons, trim, and adjacent surfaces disturbed by the Contractor's operations to a condition equal to or better than that which existed prior to construction. The Fire Station Project specifies to replace 50% of the windows in 2026 and the remaining 50% after January 2027 for budget requirements.

Files

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Similar opportunities
  • Ask GovTribe AI about this opportunity