3200 W Water & PI Improvements
Closed State & local contract opportunity Posted
- Solicitation number
- COB25001WS
- State
- Utah
- Responses due
Opportunity facts
- NIGP codes
Opportunity details come from utah.bonfirehub.com. Updated .
About this opportunity
The City of Bluffdale, Utah is procuring water and pavement improvement services through a competitive sealed bid process on the Utah Public Procurement Place (U3P) Bonfire platform for Project No. COB25001WS, titled 3200 W Water & PI Improvements. The project scope includes installation of approximately 400 linear feet of 8-inch drinking waterline, a new fire hydrant assembly with concrete pad, pressurized irrigation services with pipe tie-overs, various concrete flatwork including curb and gutter replacement per APWA standards, and asphalt replacement along 3200 West near 14865 South in Bluffdale. The procurement utilizes unit price bidding with 24 line items covering mobilization, surveys, temporary traffic controls, utility work, asphalt and concrete construction, and water infrastructure installation. Contractors must demonstrate the ability to perform at least 50 percent of work without subcontracting and provide references for five similar completed projects completed within the last four years. Required qualifications include payment and performance bonds equal to 100 percent of the contract amount underwritten by U.S. Treasury-approved surety companies, a bid bond of 5 percent of the total bid amount, and minimum insurance requirements consisting of statutory Workers' Compensation, General Liability with $1,000,000 per occurrence and $2,000,000 aggregate limits, and Automobile Liability with $1,000,000 combined single limit. Electronic bids must be submitted by 2:00 p.m. local time on March 26, 2026, with the project deadline for completion set at June 26, 2026. Work is limited to 7:00 a.m. to 7:00 p.m. unless otherwise approved by the Engineer, two-way traffic must be maintained at all times with certified flaggers for temporary lane closures, and liquidated damages are assessed at $200 per day for failure to meet the completion deadline.
The procurement documents do not indicate specific set-aside designations or restrictions limiting response to disadvantaged enterprises or particular organizational types. No incumbent vendors or current contractors are identified in the available documentation. Coordination with multiple utility providers is required, including Kern River Gas, CenturyLink, Rocky Mountain Power, Jordan Basin Improvement District, Bluffdale City Water, Comcast, Dominion Energy, and Jordan Valley Water Conservancy District, with contractors required to contact BlueStakes at least 48 hours prior to construction commencement. The City of Bluffdale reserves the right to accept or reject any bid and will award to the lowest responsive and responsible bidder within 30 calendar days of the bid opening. While specific budget ranges or award values are not explicitly stated in the available documentation, the project includes cost allocation across 24 unit-priced line items with a liquidated damages calculation base referenced in the original contract amount range.
Opportunity text
Installation of approximately 400 linear feet of 8-Inch drinking waterline, new fire hydrant assembly, pressurized irrigations services, irrigation pipe tie overs, various concrete flatwork, and asphalt replacement.
Files
| File | Type | Posted |
|---|---|---|
| 2-3200 W Water PI Improvements Bid Package.pdf | ||
| 1-3200 W Water PI Improvements Plans 3-10-26 BID SET.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity