2A 2025 ASPHALT RESURFACING PROJECT

Solicitation # BID2525
Posted 4/11/25, 2:00 AM
No Updates
Due 5/1/25, 3:00 PM
Source
No public source available
Similar Opportunities
The City of Greeley, located in Weld County, Colorado, is soliciting bids for the 2025 KGM Pavements project (Bid No. F25-04-027), a comprehensive pavement rehabilitation and maintenance initiative. The procurement covers extensive roadway infrastructure work, including concrete and asphalt pavement rehabilitation across multiple neighborhoods and street corridors. Specific deliverables include roto-milling, paving fabric installation, leveling course application, hot mix asphalt overlay,...
The Town of Firestone in Weld County, Colorado, is soliciting bids for a comprehensive Street Maintenance Program-Resurfacing project scheduled for 2025. The procurement involves chip sealing approximately 5.1 miles of arterial and collector streets, including Sable Avenue, Birch Avenue, Frontier Avenue, and Colorado Boulevard. Key project deliverables include road preparation, asphalt patching, crack sealing, chip sealing, fog sealing, striping, thermoplastic pavement markings, and...
The Town of Firestone in Weld County, Colorado, is seeking a contractor for the 2025 Streets Maintenance Program - Mill & Overlay project, focusing on road rehabilitation for Oak Meadows BLVD between Colorado Blvd and Deerfield Dr. The procurement involves profile milling approximately 1,695 square yards and installing a 2-inch asphalt overlay, with comprehensive requirements including traffic control, road surfacing preparation, asphalt patching, striping, and preformed pavement...
The City of Wheat Ridge, Colorado, is soliciting bids for the 2025 Residential Streets Program (ITB-25-022-2025), a comprehensive infrastructure rehabilitation project focused on street, sidewalk, and striping improvements. The procurement seeks a contractor to perform asphalt and concrete rehabilitation across six improvement zones, including milling and overlaying designated streets, replacing concrete sidewalks, and updating street striping. Key deliverables include installing ADA sidewalk...
The state of Colorado has issued a solicitation for a District Wide Assessment of Concrete and Asphalt, with Contract ID 67f8fa4b0ada0e97d808c3fc, seeking comprehensive evaluation services for infrastructure materials. This procurement appears to target a detailed examination of concrete and asphalt conditions across a specific district, likely requiring professional engineering or infrastructure assessment expertise. The contract opportunity was posted on April 10, 2025, with proposals due...
The City of Colorado Springs has issued a Request for Proposal (RFP) for 2C Inspection Services (R25-041SL) seeking time and materials proposals for comprehensive construction management, inspection services, and materials testing for roadway-related projects. The solicitation covers five distinct programs: Pre-Overlay Concrete Program, Pre-Overlay Pipe Program, Asphalt Overlay Program, Preventative Maintenance Programs, and Right of Way Inspection. Proposers must provide staffing for...
Larimer County is seeking bids for Project No. 8513 - 2025 South PID Overlays, a comprehensive roadway infrastructure improvement project involving concrete and asphalt patching and overlay work in three Public Improvement Districts (PIDs): Rainbow Lakes Estates, Eagle Crest, and Riviera Estates. The procurement is strictly limited to four pre-qualified contractors selected through Request for Qualifications #Qu25-01: Asphalt Specialties Co. Inc., Connell Resources, Inc., Coulson Excavating...
The state and local contract opportunity is a public works project issued by the Town of Superior in Boulder County, Colorado, specifically the Rock Creek Parkway and McCaslin Intersection Reconstruction (PW 2025-05). The procurement solicits comprehensive infrastructure improvement services involving asphalt removal, subgrade stabilization, asphalt paving, curb and gutter replacement, grading, erosion control, traffic control, and site restoration. A mandatory pre-bid meeting is scheduled...
The Town of Parker, Colorado, is seeking competitive bids for two intersection improvement projects under the capital improvement program (CIP24-016 and CIP24-028) in Douglas County. These projects involve constructing turn lane improvements and pedestrian infrastructure at two critical intersections: Mainstreet and Chambers Road, and Bayou Gulch and Crowfoot Valley Road. The Mainstreet project will extend the westbound left turn lane, involving approximately 195 cubic yards of unclassified...
The City of Woodland Park, located in Teller County, Colorado, is soliciting bids for the Browning Street Improvements project, a comprehensive road reconstruction initiative along Browning Avenue from Highway 24 to the street's western dead end. The project encompasses approximately 1,100 square yards of 4-inch thick asphalt installation, 6,300 square yards of 1.5-inch mill and overlay, 700 linear feet of curb and gutter replacement, and reconstruction of 9 ADA-compliant pedestrian ramps. A...

The City of Canon City, Colorado is seeking qualified contractors for the 2025 Capital Improvement Project (CIP) Preventive Maintenance 2A Asphalt Resurfacing project, identified as Bid No. 25-25 (Project No. 59900). The procurement involves comprehensive asphalt roadway resurfacing across multiple locations, including Candlewood Drive (5th to 9th Street), Fields Avenue (Fremont Drive to Pear Street), South Cottonwood Avenue (US Highway 50 to Fowler Street), MacKenzie Avenue, and construction of a new parking lot at 315 Main Street. The project will utilize a combination of milling existing asphalt surfaces and applying new hot mix asphalt (HMA) layers, with additional work including erosion control, shoulder construction, traffic control, pavement markings, and wheel stop installation. A pre-bid meeting is scheduled for April 17, 2025, at 11:00 AM, with electronic bid submissions required through BidNet by May 1, 2025, before 11:00 AM. Contractors must submit a 5% bid bond and will be expected to complete all work within 60 consecutive calendar days, with a project completion deadline of September 1, 2025.

The procurement includes a local bidders' preference for Fremont County contractors, who will receive priority consideration if their bid is within 5% of the lowest bid, up to $10,000. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, bidders must provide performance and payment bonds and adhere to detailed technical specifications regarding materials, compaction, testing, and quality control. The project manual outlines specific guidelines for asphalt placement, joint construction, and surface tolerances, indicating a rigorous technical evaluation process. Although a precise budget range is not specified, the comprehensive project manual and detailed bid schedule suggest a substantial infrastructure investment. Contractors responding to this opportunity should have significant experience in municipal roadway resurfacing, asphalt overlay techniques, and the ability to manage complex urban infrastructure improvement projects within strict timeframes.

Generated 4/12/25, 10:36 AM