The City of Canon City, Colorado is seeking qualified contractors for the 2025 Capital Improvement Project (CIP) Preventive Maintenance 2A Asphalt Resurfacing project, identified as Bid No. 25-25 (Project No. 59900). The procurement involves comprehensive asphalt roadway resurfacing across multiple locations, including Candlewood Drive (5th to 9th Street), Fields Avenue (Fremont Drive to Pear Street), South Cottonwood Avenue (US Highway 50 to Fowler Street), MacKenzie Avenue, and construction of a new parking lot at 315 Main Street. The project will utilize a combination of milling existing asphalt surfaces and applying new hot mix asphalt (HMA) layers, with additional work including erosion control, shoulder construction, traffic control, pavement markings, and wheel stop installation. A pre-bid meeting is scheduled for April 17, 2025, at 11:00 AM, with electronic bid submissions required through BidNet by May 1, 2025, before 11:00 AM. Contractors must submit a 5% bid bond and will be expected to complete all work within 60 consecutive calendar days, with a project completion deadline of September 1, 2025. The procurement includes a local bidders' preference for Fremont County contractors, who will receive priority consideration if their bid is within 5% of the lowest bid, up to $10,000. While no specific set-aside designations for disadvantaged enterprises are explicitly mentioned, bidders must provide performance and payment bonds and adhere to detailed technical specifications regarding materials, compaction, testing, and quality control. The project manual outlines specific guidelines for asphalt placement, joint construction, and surface tolerances, indicating a rigorous technical evaluation process. Although a precise budget range is not specified, the comprehensive project manual and detailed bid schedule suggest a substantial infrastructure investment. Contractors responding to this opportunity should have significant experience in municipal roadway resurfacing, asphalt overlay techniques, and the ability to manage complex urban infrastructure improvement projects within strict timeframes.
Name | Description | Size | Type (Click to sort descending) | Posted (Click to sort descending) |
|---|---|---|---|---|
25-25 Project Manual CIP-Preventive-Maintenance 2A Asphalt-Overlay Final.pdf | 6MB | 4/11/25 |