Street Maintenance Program-Resurfacing

Solicitation # S20259252
Posted 4/11/25, 2:00 AM
No Updates
Due 4/25/25, 6:00 PM
Source
No public source available
Similar Opportunities
The Town of Firestone in Weld County, Colorado, is seeking a contractor for the 2025 Streets Maintenance Program - Mill & Overlay project, focusing on road rehabilitation for Oak Meadows BLVD between Colorado Blvd and Deerfield Dr. The procurement involves profile milling approximately 1,695 square yards and installing a 2-inch asphalt overlay, with comprehensive requirements including traffic control, road surfacing preparation, asphalt patching, striping, and preformed pavement...
The City of Wheat Ridge, Colorado, is soliciting bids for the 2025 Residential Streets Program (ITB-25-022-2025), a comprehensive infrastructure rehabilitation project focused on street, sidewalk, and striping improvements. The procurement seeks a contractor to perform asphalt and concrete rehabilitation across six improvement zones, including milling and overlaying designated streets, replacing concrete sidewalks, and updating street striping. Key deliverables include installing ADA sidewalk...
The City of Canon City, Colorado is seeking qualified contractors for the 2025 Capital Improvement Project (CIP) Preventive Maintenance 2A Asphalt Resurfacing project, identified as Bid No. 25-25 (Project No. 59900). The procurement involves comprehensive asphalt roadway resurfacing across multiple locations, including Candlewood Drive (5th to 9th Street), Fields Avenue (Fremont Drive to Pear Street), South Cottonwood Avenue (US Highway 50 to Fowler Street), MacKenzie Avenue, and construction...
The City of Greeley, located in Weld County, Colorado, is soliciting bids for the 2025 KGM Pavements project (Bid No. F25-04-027), a comprehensive pavement rehabilitation and maintenance initiative. The procurement covers extensive roadway infrastructure work, including concrete and asphalt pavement rehabilitation across multiple neighborhoods and street corridors. Specific deliverables include roto-milling, paving fabric installation, leveling course application, hot mix asphalt overlay,...
The state and local contract opportunity is a public works project issued by the Town of Superior in Boulder County, Colorado, specifically the Rock Creek Parkway and McCaslin Intersection Reconstruction (PW 2025-05). The procurement solicits comprehensive infrastructure improvement services involving asphalt removal, subgrade stabilization, asphalt paving, curb and gutter replacement, grading, erosion control, traffic control, and site restoration. A mandatory pre-bid meeting is scheduled...
The City of Woodland Park, located in Teller County, Colorado, is soliciting bids for the Browning Street Improvements project, a comprehensive road reconstruction initiative along Browning Avenue from Highway 24 to the street's western dead end. The project encompasses approximately 1,100 square yards of 4-inch thick asphalt installation, 6,300 square yards of 1.5-inch mill and overlay, 700 linear feet of curb and gutter replacement, and reconstruction of 9 ADA-compliant pedestrian ramps. A...
The state of Colorado has issued a solicitation for a District Wide Assessment of Concrete and Asphalt, with Contract ID 67f8fa4b0ada0e97d808c3fc, seeking comprehensive evaluation services for infrastructure materials. This procurement appears to target a detailed examination of concrete and asphalt conditions across a specific district, likely requiring professional engineering or infrastructure assessment expertise. The contract opportunity was posted on April 10, 2025, with proposals due...
The Pueblo West Metropolitan District is soliciting bids for the Homer Drive Roadway Improvements project (IFB-2025-WA-2411), a public infrastructure construction initiative located in Pueblo County, Colorado. The project involves constructing approximately 1,500 linear feet of 22-foot-wide doubled chipped residential roadway, requiring comprehensive project management including all necessary labor, supervision, equipment, tools, and materials. Bidders must submit sealed proposals by May 2,...
The City of Woodland Park, Colorado is seeking a contractor for the 2025 Citywide Striping Project, a comprehensive street and parking lot marking initiative located within the city's municipal boundaries. The project requires the selected contractor to provide all equipment, materials, and labor for street and parking lot striping using SETFAST SOLVENTBORNE ACRYLIC TRAFFIC MARKING PAINT, with glass beads mandatory for street markings. The Master Striping Inventory details extensive work...
The City of Greeley, located in Weld County, Colorado, is seeking bids for the 95th Avenue - Cache La Poudre Bridge Rehabilitation project (Bid #F25-04-025), a comprehensive bridge infrastructure improvement initiative. The procurement is an Invitation for Bid (IFB) focused on rehabilitating an existing bridge to address current weight restrictions by removing and replacing the bridge deck, superstructure, pier cap, and abutment caps while maintaining the existing steel pile foundation. The...

The Town of Firestone in Weld County, Colorado, is soliciting bids for a comprehensive Street Maintenance Program-Resurfacing project scheduled for 2025. The procurement involves chip sealing approximately 5.1 miles of arterial and collector streets, including Sable Avenue, Birch Avenue, Frontier Avenue, and Colorado Boulevard. Key project deliverables include road preparation, asphalt patching, crack sealing, chip sealing, fog sealing, striping, thermoplastic pavement markings, and restoration work. The project requires a 24-hour contact for the duration of the work and mandates coordination with town staff to address safety and resident concerns. Critical procurement dates include a mandatory pre-bid conference on April 16, 2025, with sealed bids due on April 25, 2025, at 2:00 p.m. local time. The contract is expected to commence by June 1, 2025, with substantial completion anticipated within 60 days and full completion within 90 days. Bidders will be evaluated based on their ability to meet detailed unit-price specifications for various road work elements.

While no specific set-aside designations or restrictions on bidder types were explicitly mentioned in the documentation, the contract includes standard procurement protections such as performance and labor & material payment bonds. The Town will retain up to 5% of the calculated value of completed work and reserves the right to accept or reject any bids and negotiate optional items with the successful bidder. The total construction cost will be determined based on the unit prices submitted by contractors. Although no incumbent vendors were identified, the project involves extensive infrastructure work across multiple road segments totaling approximately 5.1 miles. The bid and construction contract provides comprehensive details on technical specifications, including requirements for traffic control, stormwater BMP compliance, and resident notifications. While a precise budget range was not specified, the unit-price bid form suggests a potentially significant investment in road maintenance and resurfacing for the Town of Firestone.

Generated 4/12/25, 10:39 AM