The Village of Buffalo Grove, Illinois is soliciting bids for the 2026 Golfview Lift Station Lining project under VoBG 2026-09, with proposals due August 26, 2026 at 9:00 a.m. Work is subject to the Illinois Prevailing Wage Act.
The scope includes temporary bypass pumping around the lift station wet well, removal and replacement of wet well pump discharge pipe fittings and appurtenances, protection and replacement of existing submersible lift station pump appurtenances (guide rails, brackets, chains, discharge piping brackets, pipe support brackets), installation of protective lining systems on the interior walls, lid underside, and floor of the wet well, installation of protective lining on wet well discharge piping, and maintenance or replacement of control field devices within the wet well.
Bidders must be prequalified with the Illinois Department of Transportation and fully registered with the Village of Buffalo Grove. Bid security of at least ten percent of the total contract price is required in the form of a bank draft, cashier's check, certified check, or bid bond. All bids must be submitted electronically through the Village's Vendor Registry system as a single PDF attachment (up to 200 MB). Submission requirements include an executed and notarized Public Contract Statement, completed Schedule of Prices, completed Reference List, and list of requested contract changes.
Substantial completion is due October 30, 2026, with final completion by November 20, 2026. Liquidated damages of $2,000 per calendar day apply for failure to meet completion deadlines. A one-year Maintenance Letter of Credit equal to ten percent of the awarded contract value is required from final completion. Contractors and subcontractors must submit certified payroll reports through the Illinois Department of Labor Payroll Portal with each payment request.
An optional pre-bid meeting is scheduled for August 12, 2026 at 1:00 p.m. at the Golfview Lift Station. Questions are due August 21, 2026 at 9:00 a.m. The anticipated Village Board award date is August 17, 2026, with commencement August 31, 2026.
Opportunity text
The work includes, but is not necessarily limited to, the following major items: a) Golfview Lift Station i) Temporary bypass pumping around the lift station wet well to facilitate work within the wet well (Section 01 51 00). ii) Removal and replacement of wet well pump discharge pipe fittings and appurtenances (Section 22 13 13, and 33 01 31). iii) Protection of existing submersible lift station pumps during lining work and replacement of existing pump appurtenances including guide rails, guide rail brackets, chains, discharge piping brackets, chain and cable pipe support brackets,(Section 22 13 29). iv) Installation of protective lining system on interior walls, lid underside and floor of Golfview Lift Station Wet Well (Section 33 01 30). v) Installation of protective lining system on wet well discharge piping (Section 33 01 31). vi) Maintain, protect and/or replace control field devices located in the wet well (Section 33 09 30).
Files
| File | Type | Posted |
|---|---|---|
| village of buffalo grove 2026-07-10 Draft Golfview Lift Station Bid PackageF.pdf |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Similar opportunities
- Ask GovTribe AI about this opportunity