Z1DA--Connect HVAC Components to BAS PN: 657-19-114JB
Closed Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- 36C25521R0053
- Agency
-
Veterans Integrated Service Network 15
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
- Place of performance
- Saint Louis MO 63125 USA
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to connect heating, ventilation, and air conditioning components to the building automation system at the Department of Veterans Affairs St. Louis Health Care System facilities in Buildings 53 and 3 on the Jefferson Barracks campus. The work includes replacing outdated pneumatic and DDC controls with new direct digital controls, sensors, actuators and network equipment. Proposals are due by March 31, 2021 and will be evaluated based on technical approach, past performance, and price. The contract has a period of performance of 330 calendar days from notice to proceed.
The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. The primary NAICS code is 238210 and PSC code R499. The place of performance is St. Louis, Missouri. Bidders must have experience meeting specifications for similar projects. The solicitation includes three bid items with different scopes of work. The base bid is for all work specified with an estimated total value between $500,000-$1,000,000 to be completed within the 330-day period.
Notice text
2 versions
Update #2 · Latest ·
VA St. Louis Health Care System
Statement of Work: 657-19-114JB Connect Heating, Ventilation, & Air Conditioning to Building Automation System
6 November 2020
Purpose of Project:
The VA St. Louis Health Care System, Jefferson Barracks Division, needs to connect various HVAC systems the VA’s BAS system to improve healthcare, and access to healthcare, for Veteran’s.
Criteria:
All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA and local codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary.
Scope of Work for this project shall include the following items:
Building 53:
- Pricing:
- Bid Item 1, Base Bid
- Contractor shall perform all work for 657-19-114JB Connect Heating, Ventilation, & Air Conditioning to Building Automation System at VAMC St. Louis Jefferson Barracks Division as fully described herein the contract documents. Period of Performance is 330 Calendar Days.
- Bid Item 1 $________________
- Bid Item 2
- All items listed in Bid Item 1 Base Bid with the following modifications. Remove Bldg 53 Demo of Existing Abandoned RHP, Piping, Removal and Replacement of the associated Fin Tube Control Valves, New DDC Thermostat, Power, and Networking. Qty 72 RHP & 32 associated Fin Tube Control Valves (remove Items C.2.c & C.2.d below). Period of Performance is 330 Calendar Days.
- Bid Item 2: $________________
- Bid Items 3
- All items listed in Bid Item 2 with the following modifications. Remove Bldg 53 upgrade of 12 Existing Pneumatic Duct Mounted Reheat Coil Control Valves to DDC Control (remove item C.2.a. below). Period of Performance is 330 Calendar Days. Period of Performance is 330 Calendar Days.
- Bid Item 3: $________________
- Bid Item 1, Base Bid
- General Scope of Work
- Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 53.
- Required Engineering, Hardware, Project Management, and programming for the DDC Control System shall be provided by contractor.
- Electrical Control Wiring for the Panels, Controllers, Devices, and controls Network is provided by contractor.
- Existing Pneumatic Field Devices and Piping to be removed.
- Existing Actuators, Temperature Sensors, Pressure Sensors, to be replaced with New Electronic/DDC Sensors and Actuators.
- Existing Pneumatic Control Valves to be replaced. Mechanical Contractor to provide required labor, material, insulation, etc. to replace existing with New Valve.
- See Schedule below (Att. 1) for quantity and service on attached schedule.
- NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
- Demolition and mechanical labor are provided by contractor.
- General trades labor to be included but not limited to the following:
- General clean up.
- Core drilling where required to run communications network.
- Ceiling removal and reinstallation.
- Cutting or patching existing wall sensor locations. Cover plates to be installed by contractor.
- NO new control valves will be provided.
- Existing controls that are not operable or no longer needed (including thermostats) will be removed.
- Existing Systems which will not be modified under this scope of work include:
- 53-AH-1
- 53-AH-2
- 53-AH-3
- 53-AH-4
- 53-AH-5
- 53-AH-6
- 2nd Floor North VAV Boxes (Qty 28)
- 53- Hot Water System
- 53- Chilled Water System.
- Existing Systems which are NOT Currently Controlled and will NOT be modified under this scope of work include:
- Pneumatic Smoke Dampers (Addressed in Recent Fire Alarm Replacement Project)
- Emergency Generator Ventilation (Addressed in Generator Replacement)
- Hot Water Unit Heater Work (Stand Alone Electric Stat to remain)
- Elevator Exhaust Damper Replacement work
- Cabinet Unit Heaters (Qty 2) (Stand Alone Electric Stat to remain)
- Duct Mounted Humidifiers (Qty 1)
- System Specific Scope of Work:
- Furnishing Network Hardware as required for the addition of the DDC Controls provided under this project. One NAE-55 will be provided. The VAMC to identify Network Switch Location and contractor to run Network cabling as required to Network the New NAE to the VAMC System.
- Furnishing and installing DDC Controllers for the following:
- Duct Mounted Reheat Coils w/ Pneumatic Thermostats (Qty 12)
- Serving First and Second Floors Tagged RHC-1 thru RHC-12.
- Replace 3-Way Hot Water Control Valve
- Provide DDC Thermostat, Power, and Network
- VAV Terminal Units: (Qty 41)
- Existing pneumatic receiver Controller & Stat to be removed
- Existing pneumatic hot water reheat coil control valve to be replaced
- DDC controller, 24 VAC power, and network
- DDC thermostat
- Discharge air temperature sensor
- Volume control damper actuator & flow DPT
- HRP- Radiant Panel:
- VAMC disabled all existing HRP radiant ceiling panels
- Any existing related pneumatic stats will be removed, and cover plates installed.
- VAMC disabled all existing HRP radiant ceiling panels
- Fin Tube Radiation: (Qty 40)
- Existing pneumatic stat to be removed
- Existing pneumatic hot water control valve to be replaced
- DDC controller, 24 VAC power, and network
- DDC thermostat
- Duct Mounted Reheat Coils w/ Pneumatic Thermostats (Qty 12)
- Items not included:
- Installation of valves, wells, meters, or Taps.
- Installation of dampers or Air Flow Measuring Stations.
- Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
- Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper Controls (by Div. 26)
- Systems testing & balancing
- Demolition, premium labor, cutting, patching, or painting
- Existing VFD Drives to Remain
- Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
- System Shutdowns will be Coordinated/Scheduled with the GC/Owner
- Contractor will reuse existing Field Device Wiring
- Contractor will reuse networking where possible.
- No work with Fire/Smoke Dampers
Building 3:
- General Scope of Work:
- Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 3.
- Required Engineering, Hardware, Project Management, and programming for the DDC Control System.
- Electrical Control Wiring for the Panels, Controllers, Devices, and automated controls Network.
- Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
- NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
- Demolition and mechanical labor shall be provided by contractor.
- General trades labor to be included by the contractor for the following:
- General clean up.
- Core drilling where required to run communications network.
- Ceiling removal and reinstallation.
- Cutting or patching existing wall sensor locations. Cover plates to be installed by contractor.
- NO new control valves will be provided.
- Existing controls that are not operable or no longer needed (including thermostats) will be removed.
- System Specific Scope of Work:
- Furnishing network hardware as required for the addition of the DDC Controls provided under this project. One NAE-55 will be provided. The VAMC to identify Network Switchlocation and contractor to run network cabling as required to network the new NAE to the VAMC System.
- Furnishing and installing DDC controllers for the following:
- AHU-1 DDC controller upgrade and programming to include: (existing controller to be replaced to support the following field devices)
- Start/Stop
- Status
- OA-Damper Control
- HW Circulation Pump Start/Stop
- HW Circulation Pump Status
- Hot Water Valve Command
- Chilled Water Valve Command
- Filter Differential Pressure Sensor
- Supply Air Temperature Sensor
- Freeze Stat
- Chilled Water Supply Pressure
- Chilled Water Return Pressure
- Hot Water Supply Pressure
- Hot Water Return Pressure
- AHU-2, 3, 4, & 5 DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE: (EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES) (QTY 4)
- Start/Stop
- Status
- OA-Damper Control
- HW Circulation Pump Start/Stop
- HW Circulation Pump Status
- Hot Water Valve Command
- Chilled Water Valve Command
- Filter Differential Pressure Sensor
- Supply Air Temperature Sensor
- Freeze Stat
- Hot Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE: (EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES)
- Shared panel with chilled water system
- Relocate panel to avoid further heat and water damage.
- Hot Water Supply Pressure
- Hot Water Return Pressure
- Hot Water Distribution Pump Start/Stop (Qty 2)
- Hot Water Distribution Pump Status (Qty 2)
- Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Condensate Pump Start/Stop & Status (Qty 2)
- Chilled Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE:(EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES)
- Shared Panel with Chilled Water System
- Owner has requested Relocation outside of Mechanical Room due to Water and Heat Damage Potential
- Chilled Water Supply Temperature
- Chilled Water Return Temperature
- Primary Chilled Water Pump
- Chilled Water Distribution Pump VFD Control (Qty 2)
- Chiller Enable/Disable
- Chiller Status
- Chiller Alarm
- Chilled Water Setpoint Adjust
- Fan Coil Units – DDC Controller Upgrade and Programming to include: (Qty 66)
- TEC DDC Networked Thermostats (In Patient Rooms the DDC Thermostat will be mounted up in the Unit and a Tamper Proof Sensor will be located in the space)
- Existing FCU to be Controlled by New TEC: This includes:
- Chilled Water Coil Control Valve
- Hot Water Coil Control Valve
- Fan Control
- AHU-1 DDC controller upgrade and programming to include: (existing controller to be replaced to support the following field devices)
- Items not included:
- Installation of valves, wells, meters, or Taps.
- Installation of dampers or Air Flow Measuring Stations.
- Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
- Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper Controls (by Div. 26)
- Systems testing & balancing
- Demolition, premium labor, cutting, patching, or painting
- Existing VFD Drives to Remain
- Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
- System Shutdowns will be Coordinated/Scheduled with the GC/Owner
- Contractor will reuse existing Field Device Wiring
- Contractor will reuse networking where possible.
- No work with Fire/Smoke Dampers
Update #1 ·
VA St. Louis Health Care System
Statement of Work: 657-19-114JB Connect Heating, Ventilation, & Air Conditioning to Building Automation System
6 November 2020
Purpose of Project:
The VA St. Louis Health Care System, Jefferson Barracks Division, needs to connect various HVAC systems the VA’s BAS system to improve healthcare, and access to healthcare, for Veteran’s.
Criteria:
All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA and local codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary.
Scope of Work for this project shall include the following items:
Building 53:
- Pricing:
- Bid Item 1, Base Bid
- Contractor shall perform all work for 657-19-114JB Connect Heating, Ventilation, & Air Conditioning to Building Automation System at VAMC St. Louis Jefferson Barracks Division as fully described herein the contract documents. Period of Performance is 330 Calendar Days.
- Bid Item 1 $________________
- Bid Item 2
- All items listed in Bid Item 1 Base Bid with the following modifications. Remove Bldg 53 Demo of Existing Abandoned RHP, Piping, Removal and Replacement of the associated Fin Tube Control Valves, New DDC Thermostat, Power, and Networking. Qty 72 RHP & 32 associated Fin Tube Control Valves (remove Items C.2.c & C.2.d below). Period of Performance is 330 Calendar Days.
- Bid Item 2: $________________
- Bid Items 3
- All items listed in Bid Item 2 with the following modifications. Remove Bldg 53 upgrade of 12 Existing Pneumatic Duct Mounted Reheat Coil Control Valves to DDC Control (remove item C.2.a. below). Period of Performance is 330 Calendar Days. Period of Performance is 330 Calendar Days.
- Bid Item 3: $________________
- Bid Item 1, Base Bid
- General Scope of Work
- Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 53.
- Required Engineering, Hardware, Project Management, and programming for the DDC Control System shall be provided by contractor.
- Electrical Control Wiring for the Panels, Controllers, Devices, and controls Network is provided by contractor.
- Existing Pneumatic Field Devices and Piping to be removed.
- Existing Actuators, Temperature Sensors, Pressure Sensors, to be replaced with New Electronic/DDC Sensors and Actuators.
- Existing Pneumatic Control Valves to be replaced. Mechanical Contractor to provide required labor, material, insulation, etc. to replace existing with New Valve.
- See Schedule below (Att. 1) for quantity and service on attached schedule.
- NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
- Demolition and mechanical labor are provided by contractor.
- General trades labor to be included but not limited to the following:
- General clean up.
- Core drilling where required to run communications network.
- Ceiling removal and reinstallation.
- Cutting or patching existing wall sensor locations. Cover plates to be installed by contractor.
- NO new control valves will be provided.
- Existing controls that are not operable or no longer needed (including thermostats) will be removed.
- Existing Systems which will not be modified under this scope of work include:
- 53-AH-1
- 53-AH-2
- 53-AH-3
- 53-AH-4
- 53-AH-5
- 53-AH-6
- 2nd Floor North VAV Boxes (Qty 28)
- 53- Hot Water System
- 53- Chilled Water System.
- Existing Systems which are NOT Currently Controlled and will NOT be modified under this scope of work include:
- Pneumatic Smoke Dampers (Addressed in Recent Fire Alarm Replacement Project)
- Emergency Generator Ventilation (Addressed in Generator Replacement)
- Hot Water Unit Heater Work (Stand Alone Electric Stat to remain)
- Elevator Exhaust Damper Replacement work
- Cabinet Unit Heaters (Qty 2) (Stand Alone Electric Stat to remain)
- Duct Mounted Humidifiers (Qty 1)
- System Specific Scope of Work:
- Furnishing Network Hardware as required for the addition of the DDC Controls provided under this project. One NAE-55 will be provided. The VAMC to identify Network Switch Location and contractor to run Network cabling as required to Network the New NAE to the VAMC System.
- Furnishing and installing DDC Controllers for the following:
- Duct Mounted Reheat Coils w/ Pneumatic Thermostats (Qty 12)
- Serving First and Second Floors Tagged RHC-1 thru RHC-12.
- Replace 3-Way Hot Water Control Valve
- Provide DDC Thermostat, Power, and Network
- VAV Terminal Units: (Qty 41)
- Existing pneumatic receiver Controller & Stat to be removed
- Existing pneumatic hot water reheat coil control valve to be replaced
- DDC controller, 24 VAC power, and network
- DDC thermostat
- Discharge air temperature sensor
- Volume control damper actuator & flow DPT
- HRP- Radiant Panel:
- VAMC disabled all existing HRP radiant ceiling panels
- Any existing related pneumatic stats will be removed, and cover plates installed.
- VAMC disabled all existing HRP radiant ceiling panels
- Fin Tube Radiation: (Qty 40)
- Existing pneumatic stat to be removed
- Existing pneumatic hot water control valve to be replaced
- DDC controller, 24 VAC power, and network
- DDC thermostat
- Duct Mounted Reheat Coils w/ Pneumatic Thermostats (Qty 12)
- Items not included:
- Installation of valves, wells, meters, or Taps.
- Installation of dampers or Air Flow Measuring Stations.
- Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
- Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper Controls (by Div. 26)
- Systems testing & balancing
- Demolition, premium labor, cutting, patching, or painting
- Existing VFD Drives to Remain
- Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
- System Shutdowns will be Coordinated/Scheduled with the GC/Owner
- Contractor will reuse existing Field Device Wiring
- Contractor will reuse networking where possible.
- No work with Fire/Smoke Dampers
Building 3:
- General Scope of Work:
- Extension of the Existing VAMC Metasys Facility Management System to support the existing Mechanical and HVAC Systems in Building 3.
- Required Engineering, Hardware, Project Management, and programming for the DDC Control System.
- Electrical Control Wiring for the Panels, Controllers, Devices, and automated controls Network.
- Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
- NO New Mechanical Equipment, Dampers, Fans, VFD’s are provided by contractor.
- Demolition and mechanical labor shall be provided by contractor.
- General trades labor to be included by the contractor for the following:
- General clean up.
- Core drilling where required to run communications network.
- Ceiling removal and reinstallation.
- Cutting or patching existing wall sensor locations. Cover plates to be installed by contractor.
- NO new control valves will be provided.
- Existing controls that are not operable or no longer needed (including thermostats) will be removed.
- System Specific Scope of Work:
- Furnishing network hardware as required for the addition of the DDC Controls provided under this project. One NAE-55 will be provided. The VAMC to identify Network Switchlocation and contractor to run network cabling as required to network the new NAE to the VAMC System.
- Furnishing and installing DDC controllers for the following:
- AHU-1 DDC controller upgrade and programming to include: (existing controller to be replaced to support the following field devices)
- Start/Stop
- Status
- OA-Damper Control
- HW Circulation Pump Start/Stop
- HW Circulation Pump Status
- Hot Water Valve Command
- Chilled Water Valve Command
- Filter Differential Pressure Sensor
- Supply Air Temperature Sensor
- Freeze Stat
- Chilled Water Supply Pressure
- Chilled Water Return Pressure
- Hot Water Supply Pressure
- Hot Water Return Pressure
- AHU-2, 3, 4, & 5 DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE: (EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES) (QTY 4)
- Start/Stop
- Status
- OA-Damper Control
- HW Circulation Pump Start/Stop
- HW Circulation Pump Status
- Hot Water Valve Command
- Chilled Water Valve Command
- Filter Differential Pressure Sensor
- Supply Air Temperature Sensor
- Freeze Stat
- Hot Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE: (EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES)
- Shared panel with chilled water system
- Relocate panel to avoid further heat and water damage.
- Hot Water Supply Pressure
- Hot Water Return Pressure
- Hot Water Distribution Pump Start/Stop (Qty 2)
- Hot Water Distribution Pump Status (Qty 2)
- Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Steam HX-A 1/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Steam HX-B 2/3 Control Valve – contractor to Replace Valve Actuator with Spring Returned Close Action
- Condensate Pump Start/Stop & Status (Qty 2)
- Chilled Water System - DDC CONTROLLER UPGRADE AND PROGRAMMING TO INCLUDE:(EXISTING CONTROLLER TO BE REPLACED TO SUPPORT THE FOLLOWING FIELD DEVICES)
- Shared Panel with Chilled Water System
- Owner has requested Relocation outside of Mechanical Room due to Water and Heat Damage Potential
- Chilled Water Supply Temperature
- Chilled Water Return Temperature
- Primary Chilled Water Pump
- Chilled Water Distribution Pump VFD Control (Qty 2)
- Chiller Enable/Disable
- Chiller Status
- Chiller Alarm
- Chilled Water Setpoint Adjust
- Fan Coil Units – DDC Controller Upgrade and Programming to include: (Qty 66)
- TEC DDC Networked Thermostats (In Patient Rooms the DDC Thermostat will be mounted up in the Unit and a Tamper Proof Sensor will be located in the space)
- Existing FCU to be Controlled by New TEC: This includes:
- Chilled Water Coil Control Valve
- Hot Water Coil Control Valve
- Fan Control
- AHU-1 DDC controller upgrade and programming to include: (existing controller to be replaced to support the following field devices)
- Items not included:
- Installation of valves, wells, meters, or Taps.
- Installation of dampers or Air Flow Measuring Stations.
- Furnishing or installing starters, variable speed drives or disconnects for HVAC equipment
- Furnishing or installing Smoke Detection, Fire Alarm System, Fire/Smoke Damper Controls (by Div. 26)
- Systems testing & balancing
- Demolition, premium labor, cutting, patching, or painting
- Existing VFD Drives to Remain
- Existing Field Devices are to Remain - Actuators, Temperature Sensors, Relays, CT's, Safeties, Pressure Sensors, control valve, etc.
- System Shutdowns will be Coordinated/Scheduled with the GC/Owner
- Contractor will reuse existing Field Device Wiring
- Contractor will reuse networking where possible.
- No work with Fire/Smoke Dampers
Attachment 1: Building 53 HVAC Components
General Location Served
ID
TAG
Valve GPM
Note
First Floor Center/South
RHC
1
1
Pneumatic Stat & Valve Replaced w/ DDC
First Floor Center/South
RHC
2
1.5
Pneumatic Stat & Valve Replaced w/ DDC
First Floor Center/South
RHC
3
0.5
Pneumatic Stat & Valve Replaced w/ DDC
First Floor North
RHC
4
?
Pneumatic Stat & Valve Replaced w/ DDC
First Floor North
RHC
5
1.5
Pneumatic Stat & Valve Replaced w/ DDC
First Floor North
RHC
6
1.5
Pneumatic Stat & Valve Replaced w/ DDC
Second Floor Center/South
RHC
7
1.5
Pneumatic Stat & Valve Replaced w/ DDC
Second Floor Center/South
RHC
8
0.5
Pneumatic Stat & Valve Replaced w/ DDC
Second Floor Center/South
RHC
9
2.5
Pneumatic Stat & Valve Replaced w/ DDC
Second Floor Center/South
RHC
10
1.5
Pneumatic Stat & Valve Replaced w/ DDC
Second Floor Center/South
RHC
11
0.5
Pneumatic Stat & Valve Replaced w/ DDC
Second Floor Center/South
RHC
12
1
Pneumatic Stat & Valve Replaced w/ DDC
Tot 12
Ground Floor Center/South
VAV
1
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
2
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
3
2.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
4
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
5
2
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
6
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
7
0.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
8
1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
9
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
10
3.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
11
0.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
12
3.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
13
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
14
2
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
61
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
62
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
63
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
64
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
65
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor Center/South
VAV
66
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
15
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
16
1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
17
0.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
18
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
19
2.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
20
2
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
21
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Ground Floor North
VAV
22
0.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Tot 28
First Floor Center/South
VAV
23
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
24
1.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
25
1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
26
3.5
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
27
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
28
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
29
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
30
6
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
31
1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
32
No VLV
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor Center/South
VAV
67
1
Pneumatic Stat/Controller & Vlv & FTR Vlv Replaced w/ DDC
First Floor North
VAV
33
1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor North
VAV
34
1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
First Floor North
VAV
35
1
Pneumatic Stat/Controller & Valve Replaced w/ DDC
Tot 13
Second Floor Center/South
VAV
36
2
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
37
2
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
38
1
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
39
1.5
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
40
1.5
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
41
2
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
42
1.5
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
43
1.5
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
44
1
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
45
0.5
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
46
0.5
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
47
1.5
New DDC 2008 - No Work Required
Second Floor Center/South
VAV
60
1
New DDC 2008 - No Work Required
Second Floor North
VAV
48
1.5
New DDC 2008 - No Work Required
Second Floor North
VAV
49
1.5
New DDC 2008 - No Work Required
Second Floor North
VAV
50
0.5
New DDC 2008 - No Work Required
Second Floor North
VAV
51
1
New DDC 2008 - No Work Required
Second Floor North
VAV
52
2.5
New DDC 2008 - No Work Required
Second Floor North
VAV
53
2.5
New DDC 2008 - No Work Required
Second Floor North
VAV
54
3.5
New DDC 2008 - No Work Required
Second Floor North
VAV
55
3.5
New DDC 2008 - No Work Required
Second Floor North
VAV
56
1.5
New DDC 2008 - No Work Required
Second Floor North
VAV
57
1.5
New DDC 2008 - No Work Required
Second Floor North
VAV
58
3.5
New DDC 2008 - No Work Required
Second Floor North
VAV
59
3.5
New DDC 2008 - No Work Required
First Floor North
HRP
1N99
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1N96
2.3
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N95
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1N100
3
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N92
0.8
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N90
0.8
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N82
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N86
0.8
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N83
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N85
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1N106
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1N113
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1N107
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N112
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N109
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1N110
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1N79
0.8
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1N77
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S01
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S13
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S16
2.3
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S65
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S63
0.8
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S24
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S31
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S25
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S30
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S27
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S28
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S58
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S54
0.8
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S55
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S57
1.5
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S51
0.8
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S50
1
Ower Disabled/Abandoned - Remove as required.
First Floor North
HRP
1S41
3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S46
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S42
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
First Floor North
HRP
1S45
2.3
Ower Disabled/Abandoned - Remove as required.
Second Floor North
HRP
2N87
1.5
Removed '08 - No Work Required
Second Floor North
HRP
2N104
1.5
Removed '08 - No Work Required
Second Floor North
HRP
2N86
2.3
Removed '08 - No Work Required
Second Floor North
HRP
2N106
2.3
Removed '08 - No Work Required
Second Floor South
HRP
2S85
1.5
Removed '08 - No Work Required
Second Floor South
HRP
2S01
1.5
Removed '08 - No Work Required
Second Floor South
HRP
2S03
1.5
Removed '08 - No Work Required
Second Floor South
HRP
2S83
3
Removed '08 - No Work Required
Second Floor South
HRP
2S82
1.5
Removed '08 - No Work Required
Second Floor South
HRP
2S80
1.5
Removed '08 - No Work Required
Second Floor South
HRP
2S77
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S25
3.8
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S76
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S28
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S73
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S72
3.8
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S68
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S66
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S41
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S40
2.3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S43
1.5
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S38
1.5
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S44
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S37
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S65
1.5
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S70
0.8
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S64
0.6
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S61
1.5
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S62
1.5
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S63
0.8
Ower Disabled/Abandoned - Remove as required.
Second Floor South
HRP
2S53
3.8
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S58
1.5
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S54
3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Second Floor South
HRP
2S57
3
Ower Disabled/Abandoned - Remove as required. New DDC for associated FTR
Files
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--Connect Heating Ventilation & Air Conditioning Components to Building Automation System PN: 657-19-114JB | Award Notice | |
| Z1DA--Connect HVAC Components to BAS PN: 657-19-114JB | Special Notice | |
| Z1DA--Connect HVAC Components to BAS PN: 657-19-114JB | Special Notice | |
| Z1DA--Connect HVAC Components to BAS PN: 657-19-114JB | Special Notice | |
| Z1DA--Connect HVAC Components to BAS PN: 657-19-114JB | Solicitation | |
| This notice | Solicitation | |
| Z1DA--Connect HVAC Components to BAS PN: 657-19-114JB | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| 657-27-107JC, Replace Select Hot Water Heating System | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business Sole Source | |
| 648-22-104 Correct HVAC Deficiencies (P&V) | Veterans Integrated Service Network 20 | Service-Disabled Veteran-Owned Small Business | |
| Z2NZ--Turn Key Chiller Equipment (Purchase and Install) | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Replace Fisher House 1 HVAC System | Veterans Integrated Service Network 17 | Service-Disabled Veteran-Owned Small Business | |
| J041--White City B249 SE HVAC Repair | Veterans Integrated Service Network 20 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity