Wildcat Road Decommissioning

Award Notice Posted

Solicitation number
AG-05GG-S-10-0021
Agency
Awarded
to Steele Trucking Inc.
Set-aside
HUBZone

Opportunity facts

Contract number
AG-05GG-P-10-0058 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
From Naches, 23 miles west on US 12. Turn right (North) at M.P 166 onto FS Road 1306 (WildCat). First project location is FS Road 130365.The second location is FS road1306378 road off FS road 1362 Naches, Washington 98937, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

Nine quotes were received.

Update #4 ·

During the prebid meeting on July 15, 2010 at 10:30 am, Barry Collins the COTR for the project clarified that the 18" by 100' pipe at M.P. 1.54 was not to be removed. This pipe was intentionally left off of the work list and out of the contract because too much vegetation will be disturbed to remove the pipe.

Update #3 ·

Wildcat Road Decommissioning The U.S. Forest Service, Okanogan-Wenatchee National Forest has a requirement which includes closing, road decommissioning, restoring natural drainage patterns, and returning the roadway to resource production. Work also includes converting an identified road segment to a livestock trail. The roads are located on the Naches Ranger District. Work includes removal and disposal of culverts (4 culverts 50”+ diameter up to 100 feet long, 20+ culverts 18”-24” diameter up to 100 feet long), ripping and decompaction of 2 miles of road, roadbed treatments with excavator, installing waterbars, installing road closures, berms and boulders, and converting 2 miles of road to a livestock trail. Additional work includes pulling road fill and placing fill in the ditch line to out slope the roadbed, restoring stream channel and placing large woody debris. Contractor shall furnish all supplies, materials, tools, equipment, labor, supervision and transportation to complete the project on time and within schedule in compliance with specifications. Each week, unless otherwise approved, the Contractor shall report his location and progress of work to the Contracting Officer's Representative (COR) to permit timely inspection and acceptance of completed work by the Government. Award will be made in sufficient time for planning and preparation with on-site work to start on or about July 1, 2010. The construction period of performance is 90 calendar days after receipt of notice to proceed. All “in stream” work must be completed between July 15, 2010 and August 30, 2010. A firm-fixed price contract is contemplated requiring submission of both past performance and a price quote. Award will be made to the offeror whose proposal offers the best value to the Government. The estimated construction range of magnitude for this project is between $25,000 and $100,000.00. This acquisition is determined to be under the Small Business Competitiveness Demonstration Program and posted for 100% HubZone set aside. Contractors are required to be registered with the Central Contractor Registration (CCR) and the Online Representations and Certifications Application (ORCA). The solicitation with specifications and wage rates will be posted to the https://www.fbo.gov/ website on or about June 7, 2010. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the Request for Proposal package and any applicable amendments, offerors must download them from the https://www.fbo.gov/ website.

This amendment is issued to inform interested parties that due to Government delays the solicitation with specifications and wage rates will be posted to the https://www.fbo.gov/ website on or after JULY 8, 2010. Response date is estimated to be JULY 28, 2010.

Update #2 ·

This amendment is issued to inform interested parties that due to Government delays the solicitation with specifications and wage rates will be posted to the https://www.fbo.gov/ website on or after JUNE 21, 2010. Response date is estimated to be JULY 6, 2010.

Update #1 ·

Wildcat Road Decommissioning



The U.S. Forest Service, Okanogan-Wenatchee National Forest has a requirement which includes closing, road decommissioning, restoring natural drainage patterns, and returning the roadway to resource production. Work also includes converting an identified road segment to a livestock trail. The roads are located on the Naches Ranger District.



Work includes removal and disposal of culverts (4 culverts 50+ diameter up to 100 feet long, 20+ culverts 18-24 diameter up to 100 feet long), ripping and decompaction of 2 miles of road, roadbed treatments with excavator, installing waterbars, installing road closures, berms and boulders, and converting 2 miles of road to a livestock trail. Additional work includes pulling road fill and placing fill in the ditch line to out slope the roadbed, restoring stream channel and placing large woody debris.



Contractor shall furnish all supplies, materials, tools, equipment, labor, supervision and transportation to complete the project on time and within schedule in compliance with specifications. Each week, unless otherwise approved, the Contractor shall report his location and progress of work to the Contracting Officer's Representative (COR) to permit timely inspection and acceptance of completed work by the Government.



Award will be made in sufficient time for planning and preparation with on-site work to start on or about July 1, 2010. The construction period of performance is 90 calendar days after receipt of notice to proceed. All in stream work must be completed between July 15, 2010 and August 30, 2010.



A firm-fixed price contract is contemplated requiring submission of both past performance and a price quote. Award will be made to the offeror whose proposal offers the best value to the Government. The estimated construction range of magnitude for this project is between $25,000 and $100,000.00.



This acquisition is determined to be under the Small Business Competitiveness Demonstration Program and posted for 100% HubZone set aside. Contractors are required to be registered with the Central Contractor Registration (CCR) and the Online Representations and Certifications Application (ORCA). The solicitation with specifications and wage rates will be posted to the https://www.fbo.gov/ website on or about June 7, 2010. No hard copies of the solicitation and applicable amendments will be mailed or issued. To receive the Request for Proposal package and any applicable amendments, offerors must download them from the https://www.fbo.gov/ website.

Files

File Type Posted
GENERAL WAGE DECISION.docx DOCX document
r6-fs-6300-54.rtf RTF text file
RoadBerm Sheet 4 of 5.pdf PDF
experience_questionaire.doc DOC document
Wildcat CONSTRUCTION_RFQ.doc DOC document
Technical Specs.docx DOCX document
WORK DESCRIPTION LIST Rd 1362-378.docx DOCX document
r6-fs-6300-53.rtf RTF text file
Stream Stabilazation Sheet 5 of 5.pdf PDF
WaterBar Sheet 3 of 5.pdf PDF
fire_clauses_r6-fs-6300-52.doc DOC document
Vicinity Map Sheet 2 of 5.pdf PDF
WORK DESCRIPTION LIST Rd 1306-365.docx DOCX document
Vicinity Map Sheet 1 of 5.pdf PDF
Show all 14

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity